14-187.00 WSDOT: Millwood Trail Fancher to Vista; Trent to Centennial Trail AGENCY Washington State Department of Transportation Local Agency Agreement Supplement Agency Supplement Number City of Spokane Valley 1 Federal Aid Project Number Agreement Number CFDA No. 20.205 STPE-EN 10 (016) LA-7579 (Catalog of Federal Domestic Assistance) The Local Agency requests to supplement the agreement entered into and executed on All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows: Project Description Name . Spokane Valley-Millwood Trail Length 4.4 to 4.8 miles Termini Fancher Rd/UP RR Crossing to Vista Rd; N Side Trent(SR 290)to Centennial Trail Description of Work 0 No Change This supplement removes those portions of the project lying within the City of Spokane(from Greene Street to Fancher Rd)and the portion lying within the City of Millwood(from Vista Rd to the north side of SR290). Reason for Supplement The City of Spokane has agreed to act as the Lead Agency for a new project encompassing the portion of the project within the Spokane City Limits. The City of Millwood has agreed to act as the Lead Agency for a new project encompassing the portion of the project between Vista Rd and SR 290. This supplement de-obligates$342,700 so that$248,333 can be reassigned to the new Spokane trail project and$94,367 can be reassigned to the Millwood trail project. Does this change require additional Right of Way or Easements? 0 Yes Z No Advertisement Date: TBD Estimate of Funding Type of Work (1) (2) (3) (4) (5) Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a.Agency 743,000.00 -342,700.00 400,300.00 400,300.00 100 % b.Other c.Other Federal Aid d.State 2,000.00 2,000.00 2,000.00 Participation Ratio for PE e.Total PE Cost Estimate(a+b+c+d) 745,000.00 -342,700.00 402,300.00 402,300.00 Right of Way f.Agency % a. Other Federal Aid h. Other Participation Ratio for RW i.State j.Total RM/Cost Estimate(f+g+h+i) Construction k.Contract I. Other % m.Other Federal Aid n. Other Participation o.Agency Ratio for CN p.State q.Total CN Cost Estimate(k+l+m+n+o+p) r.Total Project Cost Estimate(e'+q) 745.000.00 -342.700.00 402.300.00 402300.00 The Local Agency further stipulates that pursuant to said Title 23,regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washin s ton State •ep:rtment of Tra ortation a By By -r Title AMC.I C LJovt icS T/126CTO2 Director of Local Progra s /D/IC/k,' Date Executed OCT 2 92014 DOT Form 140-041 EF Revised 03/2014 This document contains confidential tax information and has been redacted pursuant to RCW 82.32.330. Ir DD You may petition for a review of our findings pertaining to any redacted or withheld documentspursuant to Spokane Valley Local Agency Federal Aid Project Prospectus Municipal Code (SVMC) 2.75.080; and obtain judicial review Date pursuant to RCW 42.56.550. 9-24-2014 Federal Aid Project Number STPE-EN10(016) DUNS Number 168240617 Local Agency Project Number LA -7579 ! WSDOT 1 `Use Only Federal Employer Tax ID Number REDACTED Agency City of Spokane Valley I CA Agency Yes • No Federal Program 20.205 ■ Title Other Project Title Spokane Valley - Millwood Trail Start Latitude N47D 40' 43" Start Longitude W117D 19' 31" End Latitude N47D 40' 38" End Longitude W117D 12' 20" Project Termini From - To Fancher Rd to Vista Rd SR290 to Cent. Tr Nearest City Name Spokane Valley, WA Project Zip Code (+ 4) 99206 From To Length of Project 4.4 mile to 4.8 mile Award Type Local Local Forces ■ State ■ Railroad Federal ►� Agency FHWA ■ Others City Number 1223 County Number 32 County Name Spokane WSDOT Region Eastern Region Congressional District 5 Legislative Districts 4 Urban Area Number 2 Phase Total Estimated Cost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollar) Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E. $402,300 $0 $402,300 Oct 2011 RNV $54,000 $10,800 $43,200 January 2016 Const. $2,310,926 $0 $2,310,926 April 2017 Total $2,767,226 $10,800 $2,756,426 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes The proposed alignment between Fancher Rd and Pines Rd is within abandoned Railroad ROW which has buried communication utilities, overhead power lines and Spokane County sanitary sewer lines. The proposed alignment between Pines Road and the Centennial trail connection is undetermined and may be routed adjacent to Indiana Avenue. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) The project will plan, design and construct a 10' to 12' wide HMA surfaced trail. The path cross-section, width, access points, road crossings and trail accessories will be determined during the planning and design phases. The project scope has been reduced to eliminate those portions within the Cities of Spokane and Millwood. The new project will consist of two segments: Segment A between Fancher Rd and Vista Rd and Segment B between north side of SR 290 and the Centennial trail at either the UP RR bridge over the Spokane river or at Mirabeau Park. Local Agency Contact Person Craig Aldworth Title Project Manager Phone 509-720-5001 Mailing Address 11707 E. Sprague Ave. Suite 106 City Spokane Valley State WA Zip Code 99206 By 4:, Project Prospectus Approval Approving Authority Title Spokane Valley Public Works Director Date f b //‘ //'/ DOT Form 140-101 EF Revised 04/2014 Page 1 of 3 • Previous Editions Obsolete • Agency City of Spokane Valley Project Title Spokane Valley - Millwood Trail Date 9-24-2014 Type of Proposed Work Project Type (Check all that Apply) Roadway Width 10' to 12' Number of Lanes Varies ■ New Construction ® Path / Trail 0 3-R ❑ Reconstruction ■ Pedestrian / Facilities 0 2-R 0 Principal Arterial • Railroad 0 Parking ■ Other • Bridge ■ Major Collector Geometric Design Data Description Through Route Crossroad Federal Functional Classification ❑ Principal Arterial 0 Urban ❑ Minor Arterial 0 Rural 0 Collector ❑ Major Collector 0 Principal Arterial ■ Urban 0 Minor Arterial ■ Rural 0 Collector ■ Major Collector ■ NHS ❑NHS 0 Minor Collector 0 Minor Collector ❑ Local Access ■ Local Access 100 Terrain ® Flat 0 Roll 0 Mountain ►�4 Flat 1 Roll ■ Mountain Posted Speed Design Speed Existing ADT Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Spokane Valley Public Works Staff and Consultants Others 90 % Agency 10 % Construction Will Be Performed By Publicly Bid and Awarded Contractors Contract 100 % Agency 0 % Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ® Class II - Categorically Excluded (CE) ® Projects Requiring Documentation (Documented CE) Environmental Considerations The trail alignment consists of abandoned RR ROW with ballast surfacing. DOT Form 140-101 EF Revised 04/2014 Page 2 of 3 Agency City of Spokane Valley Project Title Spokane Valley - Millwood Trail Date 9-24-2014 Right of Way ❑ No Right of Way Required *All construction required by the contract can be accomplished within the existing right of way. Right of Way Required Relocation Required ►. W No Relocation • Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project The pathway may be constructed over existing sewer mains and communication vaults and some utility frames may need to be adjusted. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ® Yes 0 No Remarks A portion of the pathway will be within 500 feet of the southern boundary of Felts Field Airport. The trail design will be coordinated with Spokane Airports staff to prevent adverse impacts to airport operations. This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Date 106/ / y DOT Form 140-101 EF Revised 04/2014 Agency By Page 3 of 3 ��/////4_fdtayor airperson C i ry ,/f40u,4 • Previous Editions Obsolete • Agency City of Spokane Valley Address 11707 E. Sprague, Suite 106 Spokane Valley; WA 99206 CFIA No. 20.205 (Catalog of Federal Domestic Assistance) Project No. 5TP _ POW (c16) Agreement No. L A - 7 57 9 For OSC WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the regulations issued pursuant thereto, (3) Office of Management and Budget Circulars A-102, A-87 and A-133, (4) the policies and procedures promulgated by the Washington State Department of Transportation, and (5) the federal ald project agreement entered into between the State and Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. Project Description Name Spokane Valley - Millwood Trail Length 6.5 Miles Termini S. Riverton & Green St to Centennial Trail, 200' east of UP RR Bridge Description of Work The project will plan, design and construct a 10' to 12' wide HMA surfaced trail within public ROW. The path cross- section, width, access points, road crossings and trail accessories will be determined during the planning and design phases. Lgen(cyOfficiall City Washington Sta By partment of Tr; sportation Director of Highways an• Local Programs of Spokane Valley Date Executed )i Form 140-038 EF • 1 AUG 31 2011 . Type of Work Estimate of Funding 3) Estimated Federal Funds (1) Estimated Total Project Funds 2) Estimated Agency Funds PE 100 %. a. Agency 743,000.00 0.00 743,000.00 b. Other Federal Ald Participation Ratlo for PE c. Other d. State 2,000.00 0.00 2,000.00 e. Total PE Cost Estimate (a+b+c+d) 745,000.00 •745,000.00 light of Way f. Agency g. Other Federal Aid Participation Ratio for RW h. Other 1. State • J. Total RNV Cost Estimate (f+g+h+i) :onstruction k. Contract I. Other ' m. Other n. Other o. Agency =ederal Aid articipation patio for CN p• State q. Total CN Cost Estimate (k+I+m+n+o+p) r. Total Project Cost Estimate (e+J+q) 745,000.00 745,000.00 Lgen(cyOfficiall City Washington Sta By partment of Tr; sportation Director of Highways an• Local Programs of Spokane Valley Date Executed )i Form 140-038 EF • 1 AUG 31 2011 P:Nublic WorYclCapilal (7=k94 OSP- �-' HWEI IIJJ mL�ur� AMIV 419 �,.. a ff MIN FWD' Dram: • REVISED PROJECT SCOPE SPOKANE VALLEY / MILLWOOD TRAIL 114. 3 J SLI L 1 En= �. rmom o&aioL3maTlatsff, 1E LEGEND REMAINING TRAIL SEGMENT IN PROJECT SCOPE ALONG ABANDONED R.R. ALTERNATE TRAIL SEGMENT IN PROJECT SCOPE OTHER AGENCY TRAIL SEGMENTS OUTSIDE OF PROJECT SCOPE ROW Sp®kane ®jValley® MISSION ' yR fliif3RE -CPq-[ 4EN •�f t� PROJECT LOCATION MAP SPOKANE VALLEY/ MILLWOOD TRAIL IAi, AVEtH!E PARK A TRAIL CdigiffJE I HRQ1j-CrI $POd . t€RrTrENF RiF L-TTfL,� AND UjTURE!'TUFFY„ S• IRAQ. • 1'(7 i 't0 2, sV Tho HFGN CEN TER EI,FiIENTARY IEIGHgcRkghb5•. _ .. TENT `CENTENNIAL TRAIL .`Irl t tllt'{ R!-• CENTER TENS10N,. f0. PLAr:E RVA;( l MALL —r.t j�hf�C )NiJ MIRg33EAU 1 VA LL i0 LL f A t�C PARI DE TFFtPAINFO ■ L BOJ AL 1/ if YMCA ;' t r0 j �. �&�►,� aOUsnrb �._ fFti TFR P0T l71aI ., A ...[tti. 1 VAkLE }7A11 MISSI Dt4E /'PE.n� :ttVAILE'E �f { 90 (JIYtERPAy� .M{s$ION Spokane .0.0*Valleyz