Loading...
14-191.00 WSDOT Argonne Corridor Upgrades AGENCY 77; Washington State Department of Transportation Local Agency Agreement Supplement Agency Supplement Number City of Spokane Valley 2 Federal Aid Project Number Agreement Number CFDA No. 20.205 CM-4041(014) LA-6999 (Catalog of Federal Domestic Assistance) The Local Agency requests to supplement the agreement entered into and executed on August 27,2009 All provisions in the basic agreement remain in effect except as modified by this supplement. 1 The changes to the agreement are as follows: Project Description Name Argonne Corridor Upgrades,I-90 to Trent(SR-290) Length 038 mi. Termini I-90 westbound ramps to Trent Ave(SR-290) Description of Work ® No Change This project will upgrades all traffic signal poles and mast arms at Knox Avenue,remove the signal displays on the center islands and improve curb radii on all quadrants.A northbound right turn lane will also be constructed at Montgomery Avenue,and the split-phasing will be replaced with protected-permitted phasing. Reason for Supplement (1)Request CN funds,(2)add funds to PE and RW phases as a result of actual costs incurred. Does this change require additional Right of Way or Easements? ❑Yes ® No Advertisement Date: Oct 24,2014 Estimate of Funding Type of Work (1) (2) (3) (4) (5) Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a.Agency 21,825.00 15,000.00 36,825.00 4,971.00 31,854.00 86.5 % b.Other Consultant 184,925.00 184,925.00 24,965.00 159,960.00 c.Other Federal Aid d.State 2,000.00 2,000.00 270.00 1,730.00 Participation Ratio for PE e.Total PE Cost Estimate(a+b+c+d) 208,750.00 15,000.00 223,750.00 30,206.00 193,544.00 Right of Way f.Agency 6,750.00 17,800.00 24,550.00 3,314.00 21,236.00 86.5 % g.Other R/W TCE 189,136.00 189,136.00 25,533.00 163,603.00 Federal Aid h. Other consultant,survey,legal Participation 20,720 00 26300.00 47,020.00 6,348.00 40 67/00 Ratio for RW i.State 5,000.00 5,000.00 675.00 4,325.00 j.Total R/W Cost Estimate(f+g+h+i) 221.606.00 44.100.00 265.706.00 35.870.00 229.836.00 Construction k.Contract 796,179.00 796,179.00 107,484.00 688,695.00 I. Other contract eligible unfunded 278,681.00 278,681.00 278,681.00 0.00 86.5 % m.Other consultant/mat'1 testing 25,000.00 25,000.00 25,000.00 0.00 Federal Aid n.Other Participation o.Agency 55,800.00 55,800.00 55,800.00 0.00 Ratio for CN p.State 5,000.00 5,000.00 675.00 4,325.00 q.Total CN Cost Estimate(k+l+m+n+o+p) 1,160,660.00 1,160,660.00 467,640.00 693,020.00 r.Total Project Cost Estimate(e±q) 430.356.00 1.219.760.00 1.650.116.00 533.716.00 1.116.400.00 The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures,and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washin ton St t ep rtment of Tra ortation By ��z t--Ar. By Title Spokane ValleyPublic Works Director Director of Local Progra Date Executed OCT 15 2014 DOT Form 140-041 EF Revised 03/2014