2006, 02-01 Street, Drainage Plan Acceptance Letter..o•VValley
11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org
February 1, 2006
Todd Whipple
Whipple Consulting Engineer
P.O. Box 1566
Veradale, WA 99037
Re: Birch Hollow 5-OS/SUB-O7-O5)
Street and Drainage Plan Acceptance
Public Works received your January 9, 2006 submittal. The plans, as submitted, are
accepted. Prior to Mylar signature the following items shall be addressed:
1. A grading permit shall be obtained. Please contact the Spokane Valley Building
Division for the appropriate required information.
2. A pre -construction conference is required. Please contact me to schedule this
meeting.
3. The City has available in AutoCAD 2006 a plan acceptance construction stamp.
This stamp may be placed on the Mylars. The blank areas are to be completed by
City staff at the time of the pre -construction conference. If you would like this
stamp, please contact me via email.
If you have any questions, please email me at awiyrick@spokanevalley.org or call me at
(509) 688-0228.
Sincerely,
Alys. Wiyrick, E.I.T.
Assistant Development Engineer
cc: Todd Rooks, 721 N. Pines, Spokane Valley, WA 99206
Alan Jackson, DEA Construction Inspector
Karen Kendall, Spokane Valley Planning Division
Spokane Valley Building Department- Permit Center
Department of Public Works — Development Project File