Loading...
2012, 03-12 Permit App: APR-2012-0013 ApproachCommunity Development Department Permit Center 11703 East Sprague Avenue, Suite 8-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenterPspokanevallev.orq (Staff Use Only) P ERMIT NUMBER:4/T 12 — P ERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: 4:4c,77e y e ,e coei/4"t-- 6 START DATE: 3 k/..2 / ANTICIPATED COMPLETION ATE: 3/ / 34,7 BUILDING OWNER NAME: oe:1 ,v/) 15741 MAILING ADDRESS: / C)C7 Ec.,ec-4 e ( CITY: --...c6-9/r—rmk j541/41 c. STATE: c,i) 4 ZIP: CONTACT PERSON NAME: PHONE: 1-c--) CONTRACTOR NAME: / ( (lb FAX: .c019 CELL: MAILING ADDRESS: CITY: „...t.2 STATE: PHONE: tV/9 ZIP: /6 FAX CELL: 4 2 2 3 63 2 CONTRACTOR LICENSE No.: j—ei EXPIRES: CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway 0 Commercial/Industrial Driveway O Existing Curb & Gutter D Rural Road Section Culvert Installation O Other Conditions: 0 Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or appr al for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be required to be s ttefrnd subsequen y approved before this application can be processed. Signature.Date: Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swale O Drainage Ditch ❑ Drywell (show location on sketch) O Other (please describe below) w z RI 0I DISTANCE FROM INEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH CURB RETURN CURB I--4' THROATWIDTH WINO (SEE TABLE) STREET NAM E 4' WINO STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH -NIF CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) 15 RADIUS RADIUS RETURN EDGE OF ASPHALT THROAT WIDTH TIFF —'i (SEE TABLE) STREET NA M E STREET WITH ASPHALT EDGE SIF CORNER LOT, DISTANCE FROM RADIUS RETURN UFT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' )e \loot Hs -o 9 if, 60* -eye tin G-rAM eK54.4,41 cutr6 —3-7T ITITEA Di -Er CiACY 11--11 HUFF LIVING TRUST 171 11516 IVIYFIICK, KEITH A 45091.1227 HEIDENSON, WALTER & DOM wag ncri qac- 1:11 P Frit -lay Anr 13 2012 01:10 PM