Loading...
2009, 12-31 Permit App: 09004122 Pole BuildingProject Number: 09004122 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 24 X 30 POLE BLDG Date: 12/31/2009 Page 1 of 2 Setbacks: Front Site Information: Left: Right: Rear: Plat Key: 000000 Name: Range Contact: HAMP, LINDA D Address: 11509 E BUCKEYE AVE C - S - Z: SPOKANE VALLEY, WA 99206 Phone: (509) 465-1917 Group Name: Project Name: itzttakesasausesagnmessemsatem District: Nort Parcel Number: 45091.1229 Block: SiteAddress: 11509 E BUCKEYE AVE Location:: CSV Zoning: R-3 SF Res District Water District: 026 IRVIN Area: 12,150 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: HAMP, LINDA D Address: 11509 E BUCKEYE AVE SPOKANE VALLEY, WA 99206 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Originally Released: 12/31/2009 By: tmelbourn Landuse/Zoning/HE Conditions Building proposed for storage only - not garage use per phone conversation with Jim Hamp 12/31/09. Originally Released: 12/31/2009 By: lbarlow Permits: Operator: jmm Printed By: jmm Print Date: 12/31/2009 Project Number: 09004122 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/31/2009 Page 2 of 2 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp km Notes Sq Ft Valuation Sq Ft, Valuation POLE BDLG U-1 VB 24 X 30 720 $13,680.00 720 $13,680.00 POLE BLDG Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes: Totals: 720 $13,680.00 720 $13,680.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $237.25 $4.50 $94.90 Permit Total Fees: $336.65 This permit is granted based on the identified use as a storage building - not a garage for daily use vehicles. A hard paved driveway is not required for a storage building. If the structure is used as a garage for the storage of daily use vehicles in the future a hard paved driveway that has access to a public street shall be required. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $336.65 $336.65 $94.90 $241.75 $336.65 $336.65 $94.90 $241.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jnun Printed By: jmm Print Date: 12/31/2009 Permit Center ScrrvoF�� 11703 E Sprague Ave, Suite B-3 pokane ` Spokane Valley, WA 9.9206 j41Valky!(509)68&-Q036 FAX: (59)688, 0037 . �www.spokaileyMie$'.c rg , Community Development s Residential \Coiis>ti Permit Appicatioi: PERMIT NUMBER: PERMIT FEE: New Construction Addition/Remodel 1 Other: Accessory Bldg Deck SITE ADDRESS: i f; / 1! 9j 0 - ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: DIMENSIONS: a 4 X 36 X10 / Name: 2 6 lip A £ l/ f1 -4-7/0 Name: Address: / %-o q BGtP_J`i'6, a j -cie City: ��[i4L�-c.L (.14 11,e_Sta e: J Zip`!91 U y Phone: s..._6,ciG j.__/ / 2 Fax: City: Contact Person Name: Phone: Contractor: DIMENSIONS: a 4 X 36 X10 # OF STORIES: Name: MAIN FLOOR TO SQ. FTG:.per 2Nu FLOOR SQ. FTG: n, /1 Address: IMPERVIOUS SURFACE City: State: Zip: Phone: Fax: CONSTRUCTION TY E: pc, `c2 plc c c le. Contractor Lic No: Exp Date: City Business Lic. No: Describe the scope of work in detail: Cost of Project: $ �u /dot P49k Proposed Use: (j1/`a_G(�r// 0 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: a 4 X 36 X10 # OF STORIES: TOTAL HABITABLE SPACE: y/4 MAIN FLOOR TO SQ. FTG:.per 2Nu FLOOR SQ. FTG: n, /1 UNFIN BASEMENT SQ. FTG: /V/452AREA: IMPERVIOUS SURFACE FINISHED BASEMENT SQ. FTG: / ✓4 ARAGE SQ. FTG: O tk DECK/COV. PATIO SQ. AFTG: /v 30% SLOPES ON PROPERTY: # OF BEDROOMS: /V A CONSTRUCTION TY E: pc, `c2 plc c c le. HEAT SOURCE: /1%1% SEWER OR SEPTIC? /1/4 The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plan ay be required to be submitted, and subsequently approved before this application can-beproces'-d / SIGNAPU� Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 TE: ❑ Mastercard ❑ VISA Expires: VIN#: CITY Va11ey® For City Use Only PLUS Project Number 'T / Project Address // 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036+ Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. if for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review • Submit complete, accurate plans and documents. Extra time May be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. • Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can he changed, one individual with the expertise or dealing with reviewer comments would be the best choice for the entire review process. • Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process I. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of thcir technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Peimit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE RFV 0/07 (9 E ivdt2 '4'47/L7 cadIvere Cr- C 2009 t I 'ql2 ('(0" PLANNING DE T. APPROVED Be 40( clre) DATE: i I 09