Loading...
HomeMy WebLinkAbout1998, 07-30 Permit: 98007075 SewerSPOKANE COUNTY DIVISION OF BUILDING AND PLANNING 1026 W. BROADWAY • SPOKANE, WA 99260-0050 (509) 456-3675 SITE INFORMATION PROJECT INFORMATION SITE ADDRESS: 11413 E BUCKEYE AVE SPOKANE WA 99206 PARCEL NUMBER: 45092.1506 SUBDIVISION: FAIRACRES REPLAT #3 LOT: BLOCK: ZONE: UR -3.5 INSPECTOR: GEORGE KRIENKE WATER DIST: OWNER: KITZAN, ANNE M. PHONE: 509 928 5091 ADDRESS: 11413 E BUCKEYE AVE SPOKANE WA 99206 PROJECT NUMBER: 98007075 ISSUE DATE: 07/30/98 PERMIT USE: SEWER CONNECTION - FAIRACRES (98S-1528) APPLICANT: KITZAN, ANNE M. PHONE: 509 928 5091 ADDRESS: 11413 E BUCKEYE AVE SPOKANE WA 99206 CONTACT: EDWARD JACKSON PHONE: 509 928 5091 SETBACKS -> FRONT: NA LEFT: NA RIGHT: NA REAR: NA LENDER NAME: PHONE: ADDRESS: PERMIT(S) SEWER PERMIT CONTRACTOR NEW LOOK CONSTRUCTION LICENSE #: NEWLOC*038KK SEWER CONNECTION PROCESSING FEE TOTAL PERMIT FEE 1 15.00 $100.00 Fd PAYMENT SUMMARY NOTES PAYMENT DATE RECEIPT# PAYMENT AMOUNT 07/30/98 00008366 TOTAL FEES AMOUNT PAID AMOUNT OWING $100.00 $100.00 $100.00 ISSUED PERMIT BY: CAROL FRAZIER $.00 ***FOR SEWER STUB AS -BUILT INFORMATION AND INSPECTIONS, CALL THE COUNTY UTILITIES DEPARTMENT AT 456-3604*** CONTRACTOR OR APPLICANT IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION TO LOCATE BURIED CABLES, GAS PIPING, WATER LINES, ECT. CALL BEFORE YOU DIG (456-8000) SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO INSURE THAT THEY ARE CLEAR AND UNOBSTRUCTED TO THE SEWER MAIN ********* CALL FOR INSPECTION PRIOR TO COVER ********** ********* 24 HOUR NOTICE REQUIRED ********** ********* 456-3604 ********** NOTICE It is the ,eaponmuouvmt»e po,m|uoe, not Spokane County, to see to nthat the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner'sfpermittee's expense. At a minimom, the following inspections ARE REQUIRED by County Code: 1. FOOTING when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property ono or the cenler line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areno, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee —neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly ocate the structure may require its relocation at the owner's/permittees expense. 2. FOUNDATION when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3. FRAMING after all framing, bracing and blocking is in p|ace, and prior 10 conceahng. 4. INSULATION - prior to lhe installation of drywall. 5. PLUMBING after rough -in, before uvveho0, and final. V. MECHANICAL rough -in of piping, before covering, metal chimneys betore concealment, and final. 7. FINAL when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approvaof this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/srte plan which must be completed prior to final approval cxubuilding o,issuance cf a Certificate 01 Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by fruming, drywaU, oonu,oue, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. VOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, Division of Engeering & Roads • Sewer connection, County Division of Utilities 456`3600 456-3604 or State Department of Transportation or City Public Works Department 458'3000 625-6300 • On-site waste disposal system, Spokane Regional Health District • Electrical vwring, State Department of Labor and Industries 324'1560 324'2640 • Construction inaflood plain, Division of Engineering & Roads 456-3600 EXPIRATION Unless otherwise nnted, this permit will be considered null and void by limitation 01 the work authorized by the permit if not commenced or 5 stopped for a period of 180 days, unless a written request tor an extension of the permit is received and approved by the Building Official prior 10 expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity 01 the permit. Apermit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations— pease call us if you have any questions. MISTAKES? 8 you think we've made an error in processing this permit or in conducting inspections pertaining mit. or find erroneous information in the pe,mit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. Alt such requests should be directed to the Division of Building and Planning at the address found on the face of this permit. |oertify that 1 haveexamined this permit/application, state that the information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, | have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. | understand that the issuance of this permit/application and any subsequent inspection approvals ar Certificates of Occuparicy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF OWNER OR AGENT APPLICATION DATE '