2005, 02-16 Permit: 05000484 MHs�1m
I°Va11ey
BUILDING DIVISION
11707 E Sprague Avenue Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 7610 E BUCKEYE AVE
Parcel Number: 45072.1102
Subdivision:
Block:
Lot:
Zoning: UR -3 Urban Residential 3.5
Owner: BEITEY, KEVIN J & LINDA
Address: 7610 E BUCKEYE AVE
SPOKANE VALLEY, WA 99212
Building Inspector: BARRY HUSFLOEN
Water Dist:
Project Number: 05000484 Inv: 1 Issue Date: 02/16/2005
Permit Use: TRIPLE WIDE MANUFACTURED HOME
Applicant: MOBILE CORRAL
15906 E SPRAGUE
VERADALE WA 99037
Contact: MOBILE CORRAL
15906 E SPRAGUE
VERADALE WA 99037
Phone: (509) 928-3003
Phone: (509) 928-3003
Setbacks - Front: 60 Left: 17 Right: 17 Rear: 50
Group Name:
Project Name:
Permits
Approach
Contractor: UNKNOWN
License #: UNKNOWN
APPROACH INSPECTION
1 $25.00 CONST IN ROW - APPROACH 1 $25.00
Total Permit Fee:
FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING
$50.00
Manufactured Home
Contractor: MOBILE CORRAL HOMES INC
License #: MOBILC109306
INSPECTION FEE 3
$150.00
Total Permit Fee:
$150.00
Payment Summary
Total Fees AmountPaid AmountOwing
$200.00 $200.00 $0.00
Tran Date
02/16/2005
Receipt #
395
Payment Amt
$200.00
Notes / Conditions of Approval
SEWAGE SYSTEM DESIGNED FOR A MAXIMUM OF 3 BEDROOMS OR 360 GALLONS PER DAY. OCCUPANCY
NOT ALLOWED UNTIL SYSTEM INSTALLATION HAS SRHD APPROVAL. - LANCE HALSEY 2/16/05
Processed By: KATHY CUMMINGS
Printed By: MIKE TURBAK
Page 1 of 1
PERMIT
NOTICE
�
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly Iocate the structure may require its relocation at the owner's/permittee's e
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a perrnit/site plan which must be
completed prior to final apval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OFMAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require pemiits and inspections from more than one agency.
Building, pluinterior reversals for sewer) and
mechanical, City of Spokane Vafley Building Division 088-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Depof Transportation
324-6000
Permits and inspections for electrical wiri���o=��mm�� ��s=*=������c��=��ec�*��o��
And 477-3604
Permits and inspections on-site septic systems, Spokane Regional Fire sprinklerand alarm systems and povate accessroad inspections, Spokane Valley
Health District 324-1560 Fire Departrnent 892-4122
State law RCW 19.122 requires that pnor to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work 5 not started is
abandoned for 180 days or more aftebeginning work, or c) after twa years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the va!ue of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permitfee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner Agent
Staff Approval Date