2014, 04-28 Permit: SW-14000520 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000520
Permit Issued Date: 04/28/2014
Expiration Date: 04/28/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
ELECTRIC RR U-061
J L HAWKINS EXCAVATING
509-924-9025
Applicant:
Address:
Phone:
Email:
J L HAWKINS EXCAVATING
9722 E NORA AVE
SPOKANE, WA 99206-0000
509-924-9025
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description:
Inspection Area:
Zoning:
7808 E BUCKEYE AVE
45072.1017
ELEC RY SUB HOME B10 BEG AT NE COR OF
B10 TH S2OFT TH W125FT TO TRUE POB TH
CONT W77.3FT TH S155FT TO PT 202.72FT W OF
E LN OF B10 TH E77.3FT TH N155FT TO POB
: (509)-477-3675
Owner:
Address:
Phone:
Email:
Water District: Orchard Avenue Irrigation
District #6
JONES, JOANN KAY
7808 E BUCKEYE AVE
SPOKANE, WA 99212
Fire District: Spokane Valley Fire
Land Area: 11981 Square Feet
CONTRACTOR INFORMATION:
JLHAWE*222LE, Exp. 05/31/2014
J L HAWKINS EXCAVATING
9722 E NORA AVE SPOKANE, WA 99206-0000
509-924-9025
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 04/28/2014 12:44:12 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000520 Permit Issued Date: 04/28/2014
Expiration Date: 04/28/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/28/2014 12:44:12
Project Coordinator: Dawn Dompier