04-055.00 Mooney & Pugh: CenterPlaceLETTER ~.~ TRANSMITTAL
Mldsen 216 N. Howard, S!: calk, Level - S okane, WA 99201 P: (y09} 624-6800 F: (509) 624-6262
Mitchel I Y~^ P
&C~nr~ad 49332 Sobek f2d. East, PO Box 182 Edwall, WA 9900$ P: (509) 236-2311 F: (509) 236-2451
~~-
TO: City of Spokane Valley DATE: 12/9/2004
ATTN: Joel Molander
ADDRESS: - 11707 E• S~~~Cs~U~
FROM: )eff Lane
RE: CCD-4
Q Dated Items Sent:
1 12/9/2004 CCD-4 (mechanical e ui ment)
Remarks:
Jael,
1-lere is a copy of CCD-4 which authorizes ~~Ioaney & Pugh to proceed with COR-54 (Mechanical
changes}. Jerry Potter and Doug have already signed this, so if you could sign this and f onward the signed copy
to both of our offices that will save some time. Let me know if you have any questions.
Jeff Lane
~dv- ~s
~`'~
Madsen
Mitchell
Evenson
&Gonrad
~~
__. _.
CONTRACT ADMINIS'. ,TION
Construction Change Directive
THE PROJECT:
Centerplace At Mirabeau Point Park
2426 N. Discovery Place
Spokane Valley, WA. 99216
TO CONTRACTOR
Mooney & Pugh Contractors, Inc.
P.O. Box 11737
Spokane, WA. 99211-1737
DIRECTIVE NUMBER: CCD-04
DATE: 12!812004
CONTRACT FOR:
CONTRACT DATE: 411!04
ARCHITECT'S PROJECT NUMBER: 02.20
You are hereby directed to make the following changes) in this contract:
(t?escribe brreny any proposed changes or list eny attached tnfonnation in the atternetive}
-Commence Installation of Mechanical equipmentlductwork as outlined in RFI's 092, 113, 105,
130, and 141, that are grouped together in COR-54. Mechanical sub will re-evaluate price quotes
given to General Contractor per site meeting discussion and walk through. Architect will review
estimate again once it is made available.
PROPOSED ADJUSTMENTS
1. The original proposed estimate of adjustment to the Contract Sum or Guaranteed
Maximum Price was:
"Lump Sum (increase) of $8499.00 .
When signed by the Cromer and Architect and received by the Gontrador, this Contractor signature indicates
document becomes effective IMMEDIATELY as a Construction Change agreement with the proposed
Directive (CCD), and the Contractor shall proceed with the change(s) described adjustments in the Contract
Above. Sum and Contract Time set
Forth in this CCD.
Tan Moore Architects Spokane Valley (city) 'L~ooney & Pugh Contractors
ARCHITECT (Firm name) OWNER (Firm name) CONTRACTOR (Firm name)
416 W. Sprague Ave. 11707 E. Sprague Ave. P.O. Box 11737
ADDRESS ADDRESS
/ ~~
~ 1~~~ .
BY (Si nature) ~( "nature) BY (Signature)
Doug Mitchell
(typed name) (typed name) (typed name)
12/9/2004 i ti~~ I G
DATE DATEt ' ~ DATE
Distribution List: Owner
Architect
Consultant
Contractor
Field
Other