2013, 09-09 Permit: SW-13001586 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001586 Permit Issued Date: 09/09/2013
Expiration Date: 09/09/2014
Project Description: SEWER CONNECTION REPAIR
Project Name: CARNAHAN
Primary Contact: H & R COMPLETE
Phone: 509-218-8336
Applicant: H & R COMPLETE
Address: PO BOX 749
NEWMAN LAKE-, WA 99025
Phone: 509-218-8336
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description:
5604 E EASTWOOD AVE
35231.1125
23-25-43; (ADMINISTRATIVE) EASTWOOD ADD
PT OF L2 B13 ALL L2 B13 EASTWOOD ADD PT
OF L11 IN B2 OF REPLAT OF B12&PTN OF
B11&13 BEG AT NWCOR TH S TO SWCOR TH NE
ALG SL 17FT TH NWLY TO POB; TOGETHER
WITH
Inspection Area: : (509)-477-3675
Owner:
Address:
Phone:
Email:
GRAYBEAL, SUSAN C / JOHNSON,
MARTIN M
3024 E 15TH AVE
SPOKANE, WA 99223-5108
Water District: Spokane County Water Fire District: Spokane Valley Fire
District #3
Zoning: Land Area: 12565 Square Feet
CONTRACTOR INFORMATION:
HRCOMI*972DD, Exp. 03/04/2015
H & R COMPLETE
PO BOX 749 NEWMAN LAKE-, WA 99025
509-218-8336
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER REPAIR 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 09/09/2013 08:24:42 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001586 Permit Issued Date: 09/09/2013
Expiration Date: 09/09/2014
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/09/2013 08:24:42
Project Coordinator: Kathy Cummings