Loading...
2008, 04-03 Permit App: 08001016 DeckProject Numbbr: 08001016 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/3/2008 Page 1 of 2 Project Information: Permit Use: INSTALL NEW 16 X 21 DECK Contact: GORDEYEV, VLADIMIR A & NADEZHD Address: 16416 E EASTLAND CT C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 496-2588 Group Name: Site Information: Project Name: :'IM 6F°-.Ao Pn'ta;.,,i';' "T'c%°i '`m:+:': R ,. •F."" .s --,,d'."tr,'N';'':77"vt': 74 Plat Key: 005426 Name: CHINOOK NO 2 ADD District: East Parcel Number: 46364.0604 Block: Lot: SiteAddress: 16416 E EASTLAND CT Location:: CSV Zoning: R-3 SF Res District Owner: Name: GORDEYEV, VLADIMIR A & NAD Address: 16416 E EASTLAND CT SPOKANE VALLEY, WA 99216 Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 12,265 Sq Ft Width: 80 Depth: 144 Right Of Way (ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: 4,s,„..((3.,zwyryirtr.,,n.5hf,,sroa,„ Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions Permits: 4/3/2008 By: tmelbourn Released By: Originally Released: 3/24/2008 By: mpalaniuk Operator: jmm Printed By: jmm Print Date: 4/3/2008 Project Number: 08001016 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/3/2008 Page 2 of 2 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation DECK OPEN R-3 VB DECK 340 $5,100.00 340 $5,100.00 Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes: Totals: 340 $5,100.00 340 $5,100.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $125.25 $4.50 $50.10 Permit Total Fees: $179.85 .4,7,4. 4.7'+it 4.-'2 0 14/3111 .RR ' �ti'i`1�i111':'KiYn,#.Y.l'i;; er-': ;Y.eL:w.,'�`r, t:.: wt`:oi':-r;:.b.<: g.::,i•':,..:';R:?'•.:LX=+F.i is 4:4,n0 tin APt /III'.S IAAft 46.10. MAXIMUM OF 30 RESIDENCES UNTIL WATER SYSTEM COMPLETE PER FIRE DISTRICT 1 - JEF 11/18/94 Issued home occupation Affidavit of Exemption 1/15/2008 - Vladimir Gordeyev, "Tile Works" (mjp) PaymentSummarV: /az47:. Ft.raiA• A,,.�*.,._ , •Au. ...,�: w.w ..:-.,._ .�: �;;s �4.arc. Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $179.85 $179.85 $0.00 $179.85 $179.85 $179.85 $0.00 $179.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 4/3/2008 ne Valley - Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 9ui.CEtVED BY (509)688-0036 FAF1 _WANE VALLEY www. spokanevalley. org MAR 2 1 2008 P ER T PERMIT NUMBER:S? , /0 PERMIT FEE: NiArvitonstruction 1 Ion/Remodel Other: Accessory Bldg Deck SITE ADDRESS: /6 4 /6 e -i/ Y,c')oica._,e /2... y 14' 4 99 6, ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: DIMENSIONS: . /.,X 2 r " # OF STORIES: Name: (7/a_0/ii.4.4 iia MAIN FLOOR TO SQ. FTG: 211u FLOOR SQ. FTG: Address: /6 4 / (,,, E E 0._ d e City: 0 /-30 7e v , / /le y State:WA Zip: 91.2 IL Phone: (c 0 9).i/cit_ a.s.---e? Fax: # OF BEDROOMS: Contact Person Name: Phone: Describe the scope of work in detail: Contractor: DIMENSIONS: . /.,X 2 r " # OF STORIES: Name: // d #.,/ i. c...f ; E C., oe ch ye.-' MAIN FLOOR TO SQ. FTG: 211u FLOOR SQ. FTG: Address: /6 4 /6 E E_-„. fri? dc _ / IMPERVIOUS SURFACE AREA: City: s,ei„, e fre y State: a/4 Zip:, ..z. j.,4 Phone: (r) 4 y 6, _ -z s-pir Fax: # OF BEDROOMS: CONSTRUCTION TYPE: Contractor Lic No: Exp Date: SEWER OR SEPTIC? City Business Lic. No: Cost of Project: $ / Sc0 Proposed Use: **************The followingMUST be c ********************** HEIGHT TO PEAK: DIMENSIONS: . /.,X 2 r " # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 211u FLOOR SQ. FTG: (JNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DEC(' COV. PATIO S.. FTG: 390 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEA OURC • SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be proces ed. SIGNATURE. Method of Payment: Cash Bankcard #: Authorized Signature: REVISED 2/15/07 El Check o Mastercard Expires: DATE: ED VISA VIN#: kane °#1\111Iallk SlU11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦ 509.688.0036 ♦Fax: 509.688.0037 4,0 Valle Y Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. ❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details ❑X Furnace and hot water heater location ❑X All header locations: type, size and connections ❑X Foundation plan ❑X Insulation information Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage Spokane Valley Project Transmittal City of -Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting J Plan revisions D Transmittal Date: Friday, March 21, 2008 Site Address: 16416 E EASTLAND CT Project Number: 08001016 Parcel Number: 46364.0604 Zoning: R-3 Water District: CONSOLIDATED ID #19 Fire District: FD 01 Applicant: GORDEYEV, VLADIMIR A & NADEZ 16416 E EASTLAND CT SPOKANE VALLEY, WA 99216 (509) 496-2588 e-mail: Contact: GORDEYEV, VLADIMIR A & NADEZ 16416 E EASTLAND CT SPOKANE VALLEY, WA 99216 (509) 496-2588 e-mail: Contractor: OWNER ( ) - 0 Owner: GORDEYEV, VLADIMIR A & NADE 16416 E EASTLAND CT SPOKANE VALLEY, WA 99216 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: IECENW/ED Project INSTALL NEW 16 X 21 DECK Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO N CONSTRUCTION PLAN SITE PLA N TD Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane Valley® For City Use Only PLUS Project Number / v Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 2 s"1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 • Job Truss ---- _ - Truss Type Qty Ply 080608 Al SCISSORS 9 1 PRO -BUILD, SPOKANE,WA., BJ A-64-0-0-0-0 5-8-10 5+10 4-10-14 10,7-8 4-10-14 15,6-6 5-8-10 21,34:0482,3-8 Scale = 1:3 Job Reference (optional) 7.030 s Jan 3 2008 MiTek Industries, Inc. Wed Apr 02 14:44:27 2008 Pa 4x6 = 4 3x9 • 0.9-0 5-8-10 5.8-10 4-10-14 10,7-8 4-10-14 15,6-6 5-8-10 3x9 Sq-Ck:21-3-1 Plate Offsets (X,Y): [2:0-2-11,0_1-8],[5:0-0-0,0-0-0], [6:0-2-11,0-1-8), [8:0-0-0,0-0-0[, 19:0-4-8,0-3-01 LOADING(psf) TCLL 30.0 (Roof Snow=30.0) TCDL 7.0 BCLL 0.0 BCDL 10.0 LUMBER SPACING 2-0-0 CSI DEFL in (loc) I/defl Ud PLATES GRIP Plates Increase 1.15 TC 0.43 Vert(LL) -0.35 8-9 >719 240 MT20 185/148 Lumber Increase 1.15 BC 0.64 Vert(TL) -0.65 8-9 >381 180 Rep Stress Incr YES WB 0.87 Horz(TL) 0.51 6 n/a n/a Code IRC2006/TP12002 (Matrix) Weight: 74 Ib TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X 4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 3-4-1 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 2 = 1071/0-5-8 6 = 1071/0-5-8 Max Horz 2 = 51(LC 7) Max Uplift 2 = -19(LC 7) 6 = -19(LC 8) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/51 2-3 = -3752/0 3-11 = -2828/0 4-11 = -2757/0 4-12 = -2757/0 5-12 = -2828/0 5-6 = -3753/0 6-7 = 0/51 BOT CHORD 2-10 = 0/3403 9-10 = 0/3410 8-9 = 0/3410 6-8 = 0/3403 WEBS 3-10 = 0/201 3-9 = -954/86 4-9 = 0/1980 5-9 = -954/97 5-8 = 0/201 NOTES 1) Wind: ASCE 7-05; 90mph; h=25ft; TCDL=4.2psf; BCDL=6.0psf; Category II; Exp B; enclosed; MWFRS (low-rise); cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33. 2) TCLL: ASCE 7-05; Pf=30.0 psf (flat roof snow); Category II; Exp B; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16 0 psf or 2.00 times flat roof load of 30.0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads 6)' This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Bearing at joint(s) 2, 6 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 19 Ib uplift at joint 2 and 19 Ib uplift at joint 6. 9) This truss is designed in accordance with the 2006 International Residential Code sections R502 11.1 and R802.10.2 and referenced standard ANSI/TPI 1 LOAD CASE(S) Standard 21,3-0 Sq-Ck:21: • Job ' ' • . Truss Truss Type Qty Ply 080608 Al SCISSORS 9 1 _ Job Reference (optional) PRO -BUILD, SPOKANE,WA., BJ 7.030 s Jan 3 2008 MiTek Industries, Inc. Wed Apr 02 14:44:27 2008 P: -1.04-0-8+0 5-8-10 5-8-10 4-10-14 10,7-8 4-10-14 15,6-6 5-8-10 21,34-0482,34 Scale = 1:3 4x6 = 4 3x9 . 0+0 5-8-10 5-8-10 4-10-14 10,7-8 4-10-14 15,6-6 5-8-10 3x9 Sq-Ck:213-1 Plate Offsets (X,Y_)- [2_0-2-11,0-1-8] [5:0-0-0,0-0-0j, [6:0-2-11,0-1-8], [8:0-0-0,0-0-0], [9:0-4-8,0-3-0] LOADING(psf) TCLL 30.0 (Roof Snow=30.0) TCDL 7.0 BCLL 0.0 BCDL 10.0 LUMBER SPACING 2-0-0 CSI DEFL in (loc) Ildefl Lid PLATES GRIP Plates Increase 1.15 TC 0.43 Vert(LL) -0.35 8-9 >719 240 MT20 185/148 Lumber Increase 1.15 BC 0.64 Vert(TL) -0.65 8-9 >381 180 Rep Stress Incr YES WB 0.87 Horz(TL) 0.51 6 n/a n/a Code IRC2006/TP12002 (Matrix) Weight: 74 Ib TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X 4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 3-4-1 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 2 = 1071/0-5-8 6 = 1071/0-5-8 Max Horz 2 = 51(LC 7) Max Uplift 2 = 6 = -19(LC 7) -19(LC 8) FORCES (Ib) - Maximum Compression/MMxj TOP CHORD `'a' A '�� t-�• 1-2 = 0/51 L —��3� 3752 4-11 = -2757/0 4``-�j -2757 5-6 = -3753/0 6-7 = 0/51 BOT CHORD 2-10 = 0/3403 6-8 = 0/3403 WEBS 3-10 = 0/201 3-9 = -954/86 5-9 = -954/97 5-8 = 0/201 9-10 = 0/3410 = -2828/0 5-12 = -2828/0 8-9 = 0/3410 4-9 = 0/1980 NOTES 1) Wind: ASCE 7-05; 90mptk h=25R; TCDL=4.2psf; BCDL=6.0psf; Category II; Exp B: enclosed; MWFRS (low-rise); cantileve(,Ieftand nght,exposad ; Lumber DOL=1.33 plate grip DOL=1.33 2) TCLL: ASCE 7-bS;, f-�OtMf'ps1(fiat rodf snow); Category 11; Exp 5; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 30 0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads 6) ' This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide wilt fit between the bottom chord and any other members. 7) Bearing at joint(s) 2, 6 considers parallel to grain value using ANSI/TPI 1 angle to grain formula Building designer should verify capacity of bearing surface 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 19 Ib uplift at joint 2 and 19 Ib uplift at joint 6. 9) This truss is designed in accordance with the 2006 International Residential Code sections R502 11 1 and R802.10.2 and referenced standard ANSI/TPI 1 LOAD CASE(S)— Standard 21,3-0 Sq-Ck:21 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIoNS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FOR CO"E QOMPLIANCE SPOKANE VALLEY ING DIVISION ---PCit 1 -r— 3'-0" maximum —3.5" maximum clear 36" minimum Decking 1 on center. remedge or o center of be Ph" houm Ifgreeter than 4'-0" provide a min. of 4x4 braces at pool - lo -beam connections (Muiroum Post Height shall not be more than 10 feet) Girder /44 74‘ Joist 2 -XI Post 8' min etal bueup 1" min. above concrete or alr provide Treated wood IP 4 rtiinimum if covered 12" min i.].1.: --l: Natural Grade •I4-- 7' min to daylight Minimum 2000 psi fooling 3" minimum Post l'__ 2000 psi concrete (minimum 3' minimum 36" mudmmn i Ifgreater than 4'-0" provide a min. of 4x4 braces at post - lo -beam connections (Maximum Post Height shall not be more than 10 feet) I(.� • / ti.• ,. Glider Decking Waling Dwelling M hist 2 }c! a C• C. Post & Beam Connection detail (interior condition) Post Cep installed per manufacturer's instruction IB" min. 1+ Knevee bbrrace sf) : fi. 1,y 11d Beam 111 rikT 18" min. (4x4) . {, p Two I/2" diameter lag brace �'It Kne1 bolls lop and bottom typical etal buecap I" min. above concrete or provide treated wood ] I 6" minimum Natural Grade 17 24" minimum if covered Y 1 12" minimum ledger attachment must be bolted through - e fk iti/L4Z 00Lr.1 ( tCD°CI e. 14" max - Overhang —41 AZ4ILr'1Sa, Post & Beam Connection detail osi cop imitated per mauufecluner's instruction 18" min. (4a4) Knee brace 4T�BhY,r�1 ��':t�rFY tie 18" min. (4x4 Knee brace Two 112" diameter lag Indic lup and bottom typical 21 '3" o 1 3 bc 0I Tfl—"A I CI 130-s-# 6)(6>e 9 Y: Pot Ile.4 a I Lexeve I— C ie-cci in 0/ 2.40,(2tis 4.0 gie tek6 aki;e a.4" cp RECEIVED BY CITY OF SPOKANE VALLEY APR 0 3 2008 BY: PERMIT CENTER 1•••••••••110 11 3 col • Po -R-1 x- 9 c I - /6/(1, E- a-5 -1 P0 frle l4a../k2X W4 492(17., 1 1 ; 2 .(.5- 8 Lik7OOSSZA Ck5 rr, /64(6Et_=a_-.3-8,34,64-,1-, 3 Po:k ,,e y wa v9216I 1 1 vviz//es /€y, 20 0/ Rc7r'p0/ ' I tr PLANNING DEPT, APPROVED