Loading...
2008, 07-07 Permit App: 08002545 DeckProject Number: 08002545 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/7/2008 Page 1 of 2 Project Information: Permit Use: NEW 12 X 16 DECK Contact: ROUSE, KENNETH D & MICHELE L Address: 16410 E EASTLAND CT C - S - Z: SPOKANE VALLEY WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 891-7758 Group Name: Site Information: Project Name: Plat Key: 005426 Name: CHINOOK NO 2 ADD District: East Parcel Number: 46364.0605 Block: Lot: SiteAddress: 16410 E EASTLAND CT Location:: CSV Zoning: R-3 SF Res District Owner: Name: ROUSE, KENNETH D & MICHELE Address: 16410 E EASTLAND CT SPOKANE VALLEY, WA 99216-154 Water District: 134 CONSOLIDATED ID #19 Hold: L Area: 13,960 Sq Ft Width: 80 Depth: 151 Right Of Way (ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 7/7/2008 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 7/3/2008 By: LBARLOW Operator: JD Printed By: jmm Print Date: 7/7/2008 Project Number: 08002545 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/7/2008 Page 2 of 2 Contractor. OWNER Building Permit — — Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Gra Type Notes Su Ft Valuation Sq Ft Valuation DECK OPEN R-3 VB 192 $2,880.00 192 $2,880.00 Totals: 192 $2,880.00 192 $2,880.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $83.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $33.30 Permit Total Fees: $121.05 Notes: MAXIMUM OF 30 RESIDENCES UNTIL WATER SYSTEM COMPLETE PER FIRE DISTRICT 1 - JEF 11/18/94 Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $121.05 $121.05 $0.00 $121.05 $121.05 $121.05 $0.00 $121.05 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 7/7/2008 SiZkane PERMIT NUMBER: PERMIT FEE: 127S (Staff jise 0 CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenterOspokanevalley.orcl RESIDENTIAL CONSTRUCTION PERMIT APPLICATION El NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING DECK 0 OTHER SITE ADDRESS: EAST 16410 EASTLAND COURT, SPOKANE VALLEY, WA 99216-1549 ASSESSORS PARCEL NO.:46364.0605 LEGAL DESCRIPTION:LoT #5, BLOCK #6, CHINOOK #2 BUILDING OWNER NAME: HUSBAND AND WIFE NAME:KENNETH D. ROUSE & MICHELE L. ROUSE ADDREs5:E. 16410 EASTLAND COURT CrrY:SPOKANE VALLEY STATE:WA Zip:99216-1549 pHoNE:509.891.7758 FAx:N/A cm:509.710.8521 CONTACT NAME:KEN OR MICHELE ROUSE PHoNE509.891.7758 FAx:N/A cELL:509.710.0952 CONTRACTOR NAME:OwNER MAILING ADDRESS:E. 16410 EASTLAND COURT Crry:SPOKANE VALLEY pHoNE:509.891.7758 CONTRACTOR LICENSE NO.:N/A FAx:N/A EXPIRES:N/A STATE:WA Zip:99216-1549 CELL:509.710.8521 CITY BUSINESS LICENSE NO. N/A DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: REPLACING ALL EXISTING ROTTEN BOARDS TO EXISTING DECK WITH COMPOSITE AND PRESSURE TREATED LUMBER AND TO CORRECT SIZE OF LUMBER TO MEET CODE PER INTERNET. ALSO REDUCE SIZE FROM 13x201 TO 12X161. To REPLACE BOARDS ON FRON PORCH. PROPOSED USE: PERSONAL AND ENTERTAINMENT. r.72,Y crry,':----: VALLEY JUL 0 2 2008 BY: ****YOU MUST COMPLETE THE FOLLOWING**** A IF NOT PLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT:192 0 Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $3,000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development • e. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be r ruir o be submitted and suqquently approved before this application can be processed. Method of payment: tJcast Bankcard #: Visa EXP: Date: Method /-7_01-00Pi CI Mastercard VIN#: Authorized Signature: ..., 'I rwr-7 Sitiblane4��r Milley Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting 0 Plan revisions 0 Transmittal Date: Wednesday, July 02, 2008 Site Address: 16417 E EASTLAND CT Project Number: 08002545 Parcel Number: 46364.0609 Zoning: R-3 Water District: CONSOLIDATED ID #19 Fire District: FD 01 Applicant: ROSENBAUM, PAUL D & KATHRYN 16417 E EASTLAND CT SPOKANE, WA 99216 (509) 892-7688 e-mail: e-mail: Contact: ROSENBAUM, PAUL D & KATHRYN Occupant: 16417 E EASTLAND CT e-mail: SPOKANE, WA 99216 (509) 892-7688 e-mail: Owner: ROSENBAUM, PAUL D & KATHRY 16417 E EASTLAND CT SPOKANE, WA 99216 Contractor: OWNER () -0 Arch / Engineer: e-mail: '-= JUL 0 1 Project Description: NEW 12 X 16 DECK Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO AITE PLA PLAN Please send all plan review and project comments via e-mail to the highlighted individuals. Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting 0 Plan revisions Transmittal Date: Wednesday, July 02,2008 Site Address: 16417 E EASTLAND CT Project Number: 08002545 Parcel Number: 46364.0609 C.: K Nk.)z L-61-61 Zoning: R-3 Fire District: FD 01 Water District: CONSOLIDATED ID #19 Applicant: ROSENBAUM, PAUL D & KATHRYN Owner: ROSENBAUM, PAUL D & KATHRY 16417 E EASTLAND CT 16417 E EASTLAND CT SPOKANE, WA 99216 SPOKANE, WA 99216 (509) 892-7688 e-mail: e-mail: Contact: ROSENBAUM, PAUL D & KATHRYN Occupant: 16417 E EASTLAND CT e-mail: SPOKANE. WA 99216 (509) 892-7688 e-mail: Contractor: OWNER () -0 Arch / Engineer: e-mail: Project Description: NEW 12 X 16 DECK Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO AITE PLA PLAN Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane Valley® For City Use Only PLUS Project Number D (V 45 Project Address ((n41O t .(:a`> 4 C 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised t rget date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 CA12Aid:Y36,-(i.OL05- 1_ecAL Dsc.A,,c,--fr14 5; 6Le 4'6) 0)1 pc' 36 C-1 fit7IPC, &14511_A2 fret Ok5i2 ) 5 -t -t -e5 14 f=i- bpg- RECEIVED BY CITY OF SPOKANE VALLEY JUL 02 2008 PERMI- CENTER Decking ri on muter. Dom edge of to owner of be 1 -ifs" dmum 36" minimum 3',0" maximum 111111111111 11\ glider II greater than 4'-0" provide a oda. of 4x4 broom et pod - to -beim iom,ollons (Maximum Post Height shall mot be mar, than 10 feet) Pmt earl basceap 1" min. above concrete or provide trusted wood min mum 2000 psi Noting laimum 19 minimum if covered iii min Natural Grade 7' min to daylight 36" nrinlanten If greeter Own 4'41" meld, ■ aria. of 04 broom et pooh Io -been connections (Maximum Post Height shall not be more ihen 10 feet) Post & Beam Connection detail (interior condition) roil Cap Inslell,d per mmointouan'a Iniuoo4on tel baaecep In. above concrete et ide treated wood minimum 24" minimum if covered 2000 psi concrete (minimum Il )" minimum ji lit mum Two 111" dlam,ler lag bolts lop and baaom typloel 1" min. (4i4) Kae p bice Natural Grade earn Isdger ellaclunsnl meet be bolted through IN Z �� le" man. Overhang 4x4 Knee brow Post & Beater Connection detail ep implied per muiulUitner's instruction 11" min. IMO I1 1 eebr Kwbrie learn Two or diameter lag bolls top and bottom Yokel PAL 33 4.10 GUAM N gµ1 A PER 4.14. SP iefteC Oj PASSI1.0 01414 13434. MAXFO0RHA `OflmL EA E T.t 161 13814 PASS µROUGFI 1401* rivalwAO""" 8 PRESCRIPTIVE RESIDENTIAL DECK CONSTRUCTION GUIDE Figure 8: Post -to -Beam Attachment Requirements (1) 3x or 4x or (2) 2x beam beam must bear fully on 6x6 notch 6x6 min. (2) 1/2" diameter thru- botts with washers notch post to accomodate beam Figure 9: Prohibited Post -to -Beam Attachment Condition RIM JOIST REQUIREMENTS Attach a continuous rim joist to the ends of joists as shown in Figure 11. Attach decking to the rim joist as shown in Figure 11. For more decking attachment requirements, see DECKING REQUIREMENTS. Figure 10: Alternate Approved Post -to -Beam Column Cap Attachment Figure 11: Rim Joist Connection Details joists rim joist secure decking to top of rim joist with #10 x 3" minimum wood screw @ 6" o.c. NAILS NOT PERMITTED attach rim joist to end of each joist with (5) #10 x 3" minimum wood screws; NAILS NOT PERMITTED (the number of screws may be reduced to 3 if there is no guard or, when a guard post is present, its connection is per the GUARD POST ATTACHMENT details) American Wood Council • 16 PRESCRIPTIVE RESIDENTIAL DECK CONSTRUCTION GUIDE GUARD POST ATTACHMENTS Deck guard posts shall be a minimum 4x4 (nominal) No.2 or higher grade (for species listed in Table 1) or with an adjusted bending design value not less than 1,050 psi. GUARD POST TO OUT SIDI?-JOIST: Guard posts I'm guards %vhielt run parallel to the deck joists shall he attached to the outside -joist per Figure 25. Figure 25: Guard Post to Outside Joist Detail guard posts may be located on either side of the outside - joist guard post (2)1/2" dia. thru- bolts and washers outside -joist see FIGURE 24 for guard component attachment requirements at first interior bay, provide 2x blocking at guard posts: toe nail with 10d common nails top and bottom, each side outside -joist -,-.- SECTION GUARD POST TO RIM JOIST: Guard posts for guards that run perpendicular to the deck joists shall be attached to the rim joist in accordance with Figure 26. As shown in Figure 26, hold-down anchors must be installed to attach the guard post and rim joist to the guard post PLAN VIEW deck joists. There shall be a minimum of two bolts at the hold-down anchors' attachment to the joist. Only hold- down anchor models meeting these minimum requirements shall be used. Figure 26: Guard Post to Rim Joist Detail see FIGURE 24 for guard component attachment requirements hold-down anchor minimum (2)1/2" diameter thru- bolts and washers joist rim joist SECTION guard post hold-down anchor joists align guard post at joist locations rim joist hold-down anchor at joist location between joists PLAN VIEWS American Wood Council guard post rim joist DECKS: Ledger board requires'' V2" lag bolt @ 16" o.c. with flashing behind. Guardrail 36 in. high required if floor more than 30 in. above grade. Picket spacing no more than 4 in. apart. Posts require approved base and beam connectors. Min. 24 in. frost protection to finish grade with min. 12 in. footing base. • N 0 M ; L K 3 •I H GF E A. 2x3" composite top rail, 4'3"( L); w/ 2x4" composite bottom rail, 4"5"( L) each section = 3 sections total B. 2x2" composite spindles 2'1" (2.5 spindles per 1' of railing) (8 spindles per sec. = 24 total) C. 4x4" Composite railing posts for 4'4" (h) (4 each) D. 1x8" Composite riser 4' (L) w/ 5/4x6" Composite steps 4' (L) (1.4 steps Total w/ 2 boards each step) E. 2x1.2" Pressure treated stringers, 14' ( L) (4 or 5 each) F. 6x6" Pressure Treated Posts (2 each) G. 2x10" Pressure treated stairbeams 4' (L) (2 each) H. 6x6" Pressure treated posts 7'2" (H) (3 each NOT 6) � I! 2x10" Pressure treated deck beams 15'11"( w) (4 each) 1x12" Composite Fascia board 16'( L) (1 each) 5/4x6" Composite Decking 14'11" ( L) within picture frame look (26 each + 2 for end caps) ►A ►B C D 3. K. L. lel � tJ � Z ,cg F t -o 0-0 IS f i 0 C' 2x3" composite top rail, 4'11"( L); w/ 2x4" composite bottom rail, 4"11"( 2x3" composite top rail, 5'6"( L); w/ 2x4" composite bottom rail, 5'6"( L) 2x3" composite top rail, 3'8"( L); w/ 2x4" composite bottom rail, 3'8"( L) M. 1x12" Composite Fascia board 12'( L) (2 each = both sides) N. House Wall - Exterior (south side) O. 1'(w)x24"(h) Footings dug per 6x6 posts I. V8 iF Pct At0EOc7 z 'i coNcAd,,—& L) each section = 3 sections total (south side) each section = 2 sections total (west side) each section = 2 sections total (east/steps side) NC:dc:h VITC°_I ox of [lotIOTtng Buy SmartDrawl- purchased copies print this document without a watermark. Visit www.smartdraw.com or call 1-800-768-3729. 12FT Hou e Wall Slid 42ft Windows Garage Door' Deck Rail/Posts 16ft 14ft PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD 1NSPECTtON CORRECTIONS REVIEWED FOR CODE C• PLI ' CE SPOKANE VALLEY BUILD! ' G DIV ION til 7 7 6