Loading...
1984, 03-19 Permit: 84A-2359 Finish BasementPLAN NUMBER APPLICATION/PERMIT SPOKANE COUNTY — DEPARTMENT OF BUILDING & SAFETY NORTH 811 JEFFERSON / SPOKANE, WASHINGTON 99260 / (509) 456-3675 APPLICANT: COMPLETE NUMBERED SPACES - PRESS HARD TO MAKE 3 COPIES STREET ADDRESS St 2 zO( CON KUIQ1 LOT 2. BLOCK SUBDIVISION OWNER 3. SU D F kttir R -ice. MAILING ADDRESS AYY) E PHONE CONTRACTOR 4. t 50/145 ta'� A� �=H1 M ADDRESS . DESIGNER Llj tE�N$ /51 FCF�IES, Z u 1.46(1eE WA • 5. ADDRESS CHANGE OF USE FROM PHONE 9Z4=' ZIP 'k �. cI go, PHONE ZIP TO TYPE ❑ NEW O ALT. ❑ AD' N. ❑ RPL. ❑ MVE. 7. OF WORK .BLD. ❑ PLMB. 17 MECH. El M.H. 17 POOL THER 8. DESCRIBE WORK R ,ff_ ,. `ar `ts( 1k)& VALUATION 9. SOURCE UTILITIES GAS ELECTRIC WATER PUBLIC ❑ PRIVATE E SEWAGE SEPTIC E SEWER ❑ PARCEL NO. LEGAL DESCRIPTION: Actual Set Backs in Feet to: North South East Size of Parcel Type Const. New Const. Valuation Main Floor West Zone Classification Residential ❑ Commercial ❑ Spr'nklered ❑Yes ❑No Req 'd. Remode ed Valuation s eCt C> .Ci Upper Floors Cover Deck No. Baths Uncv. Deck Total Bldg. Floor Area Garage/Storage No. Floors Greenhouse Fin. Basement No. Fin. Rooms Required YesE No❑ Received Yes Non Shorelines/Flood Hazard Yes❑ Not Applic. ❑ Ownership Public E Private ❑ I hereby certify that I have read and examined this application and have read the "NOTICE" provisions included on reverse side, and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give au- thority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. SEE REVERSE SIDE FOR REQUIRED INSPECTIONS SIGNATU OWNER t R AGENT SPECIAL APPROVALS PREL4M. FINAL DATE APPLICATION DATE Y--/9.-631 Env. Health Planning Fire Prevent. Engineer Utilities SEPA Plans Exam. Building Tech. SPECIAL CONDITIONS: (SEE REVERSE SIDE FOR NOTICE) PERMIT IS NONTRANSFERABLE PERMIT IS NULL AND VOID IF WORK HAS NOT COMMENCED IN 180 DAYS Unfin. Basement No. Dwellings Number Plans Required ❑ Received E FEES COLLECTED Building Plumbing Mech. Plan Check SEPA Modular/ MFG. Home Other (Specify) TOTAL $ PERMIT NUMBER 844- 13S9 J2* *82.00 *82006 A *000 ?35.8 03-19-84 g 6479, WHEN MACHINE VALIDATED IN THIS SPACE, THIS BECOMES A PERMIT. DATEYSSUEDL 9 -8 4 PERMIT2N.5, 9 z * 82, 0 TOTAL