2009, 06-22 Permit App: 09001800 Stick Frame ShopProject Number: 09001800 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW 24 X 28 STICK FRAME SHOP Contact: TRADITIONAL HOMES NW INC
Address: 9120 N SIMPSON RD
C - S - Z: NEWMAN LAKE, WA 99025
Setbacks: Front Left: Right: Rear: Phone: (509) 998-7488
Group Name:
Site Information: Project Name:
Plat Key: 002218 Name: RIDGEMONT EST District: East
Date: 6/22/2009 Page 1 of 2
Parcel Number: 45255.0310 Block: Lot:
SiteAddress: 2215 S CONKLIN CT Owner: Name: KLESCH, DAVID M
Address: 2215 S CONKLIN CRT
Location:: CSV SPOKANE VALLEY, WA 99037-902
Zoning: R-2 SF Res Suburban District
Water District: 010 VERA Hold:
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 6/22/2009 By: tmelbourn
LReleased By: _
Landuse/Zoning/HE Conditions
Permits:
Originally Released: 6/18/2009 By: mpalaniuk
Operator: jmm Printed By: jmm
Print Date: 6/22/2009
Project Number: 09001800 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/22/2009
Contractor: TRADITIONAL HOMES NW INC
Address: 9120 N SIMPSON RD
NEWMAN LAKE, WA 99025
Description
GARAGE
Grp Type Notes
U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes:
Payment Summary:
Permit Type
Building Permit
Building Permit
Firm: TRADITIONAL HOMES NW INC
Phone: (509) 998-7488
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
912 $17,328.00 912 $17,328.00
Totals: 912
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
$17,328.00 912 $17,328.00
Permit Total Fees:
Fee Amount
$293.25
$73.31
$4.50
$371.06
Fee Amount Invoice Amount Amount Paid Amount Owing
$371.06 $371.06
$73.31 $297.75
$37L06 $371.06 $73.31 $297.75
Page 2 of 2
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 6/22/2009
C"trry or
ey-
Community Development
Residential Con
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA
(509)688-r6rIAJC: (509)6-Q
vvvvw.sa Ervalley.org
struction
Permit Application
PERMIT NUMBER: 7700
PERMIT FEE:
New Construction
rddition/Reinode1
Other:
SITE ADDRESS: 2-2— 1 5 3, Ccerkticli. i/k C+
Accessory Bldg
Deck
ASSESSORS PARCEL NO: /52 5 5. 0 3 /0 LEGAL DESCRIPTION: L. /0 33 k "ler?! f
Building Owner:
Name: 0— 6 --t-LIACia- 1/065C -ii --
Address:
citY: V era dak State: k )./.--- Zip:
Pheffl- 9c1(1 --)/s2(0 Fax:
Contact Person
Name: 0-14
Phone n6 9,57- -7y 8e
Describe the scope of work in detail:
Contractor:
Name:. --Fra fj or ai iirvvits Ai?)
Address: 9/z6 Ai , 5 i-110,567.1
citYfiewniaati Lai& tate: Zip725
Phone(50c0 9 7s, --NAT FX() 7.224,_ 5/403
Con actor Lic No: Exp Date:
I RA Dx-i-/A(ciLi0C A / .0/C
City Business Lic. No:
Cost of Project: $
c•/''3' 5#;41 Eowie S'\0()
Proposed Use:
**************The following MUST be complete: (write N/A if not a licable **********************
HEIGHT TO PEAli:
/ 8
DIMENSIQNS: ,
c;2 4-) )( 3
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
-
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
t:142 A5/4.
DECK/COV, PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCT19A TYPE:
‘4..af:6) -1'"Ic-k Fairnt
HEAT sowzFE:
/ 6/0 rl
SE E R SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be pro essed.
SIGNATURE:
Method of Paymen
0 Cash
Bankcard #:
DATE:
o C eck 0 Mastercard 0 VISA
Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
For City Use my
CITY OF PLUS Project Number --/ '�
Project Address 4:.- :� / ` " `" ��
p
t k� ne
••000 Val l
e °
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is /C9! "
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal.This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax,email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete,including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV9/07
. • 1
t_or ,- r1/4/ 20,500 91 . • .
, ...:-..'
, •
' ....., ,, .
. ,
,........... .
,1 .
if
I
((pai
?\\3°
t .
..,.„. .
w"-
?
‘ r)
n i
6141 1 ,,14 :
--t. -• 6 -- -_____, -
r
' al /
- 3(0(
4 ,
• 1.
5
3‘4. -
_• , .'\, -'4). g I i
i
- • ri-5 , i X /
•-•,„4
. , .
, .
PLANNING DEPT. APPROVED
. .
, .
1 BY:__7112gksdizi-- .. , _
*.,
DATE: • .
......4
/..•
-..,
....."
,-.
. 7 . .....•
Ole
--
,