Loading...
2009, 07-06 Letter from EngineerIElam' 'wrtbwcst `IBngiiiceri.q, Inc. Tapio Office Center, Green Flag Building 104 South Freya Street, Suite 110-F Spokane, WA 99202 (509) 532-1532 Voice, Fax and Cell July 3, 2009 Alexey Florianovich 14121 East 23RD Avenue Spokane Valley, WA 99037 RE: Florianovich Remodel, 14121 East 23RD Avenue, Spokane Valley, Washington Project Number. 2006235 Dear Alexey Florianovich, We have reviewed the completed framing of the above referenced structure on July 2, 2009. The two story conventionally framed single family residence is constructed over a finished basement with concrete perimeter walls and wood posts and beams interior supports. A second story addition has been constructed using pre-engineered trusses on bearing walls and beams over a post and beam floor structure with individual footings. An enlarged opening in the existing rear wall is supported by a beam on posts to the original foundation. The exterior walls of the addition consist of 2x4 framing with furring as required to accommodate insulation. The completed construction is structurally adequate for applicable design criteria. The construction conforms to our design drawings dated March 11, 2009 for the roof framing and July 31, 2008 for the floor framing and foundation. We have not fully analyzed the original structure or investigated all aspects of the original construction. Defects and weaknesses may exist within the original structure that did not come to our attention during our limited investigation. We shall not be held responsible for original conditions not addressed in this project. If you have any questions or need any additional information, please call. Sincerely, Brett Danielson, P. E. Inland Northwest Engineering Incorporated enclosure BCD/bcd BEG -., P BY .LE )UL 0 6 2009