Loading...
2013, 07-10 Permit: SW-13001201 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001201 Permit Issued Date: 07/10/2013 Expiration Date: 07/10/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION W PONDEROSA PH 1 DAVIS, MARK C Applicant: DAVIS, MARK C Address: 10719 E CIMMARON DR SPOKANE, WA 99206-8612 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: 10719 E CIMMARON DR 45333.9145 Assessor's Description: 33-25-44 PTN OF SW1/4 DAF; BEG AT W1/4 COR OF SDSEC 33THS ALG W LN OF SD SW1/4 738.23FT TO TRUE POB TH E353.10FT TH S737 .52FT TO N LN OF PONDRA EAST ADD TH W ALG SD N LN 353.05FT TO W L N OF SD S Inspection Area: : (509)-477-3675 Owner: DAVIS, MARK C Address: 10719 E CIMMARON DR SPOKANE, WA 99206-8612 Phone: Email: Water District: Spokane County Water Fire District: Spokane Valley Fire District #3 Zoning: Land Area: 2.21 Acre(s) CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS: Inside Public Transit Benefit Area Possible FEMA Flood Zone Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/10/2013 13:55:42 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001201 Permit Issued Date: 07/10/2013 Expiration Date: 07/10/2014 SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/10/2013 13:55:42 Project Coordinator: Dawn Dompier