Loading...
2006, 11-01 Permit: 06004315 ResidenceSj�k'' valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 1506 S CHRONICLE RD Parcel Number: 35233.2703 Subdivision: Block: 27 Lot: 2 Zoning: UR -3 Urban Residential 3.5 Owner: LINDSEY CONSTRUCTION, INC Address: PO BOX 30792 SPOKANE, WA 99223 Building Inspector: BOB BEBOUT Water Dist: Project Number: 06004315 Inv: 1 Issue Date: 11/01/2006 Permit Use: SFR, GAS HEAT, ON SEWER Applicant: LINDSEY CONSTRUCTION, INC PO BOX 30792 SPOKANE, WA 99223 Contact: LINDSEY CONSTRUCTION, INC PO BOX 30792 SPOKANE, WA 99223 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (509) 568-1013 Phone: (509) 568-1013 Rear: Permits Approach Contractor: LINDSEY CONSTRUCTION INC License #: LINDSCI066OW APPROACH -CONST IN ROW 1 FOR RIGHT OF WAY INSPECTIONS CALL (509) 688-0053 ENGINEERING $50.00 Total Permit Fee: $50.00 Building Permit Contractor: LINDSEY CONSTRUCTION INC 1&2 FAMILY BASEMENT F DECK OPEN GAR WOOD Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. License #: LINDSCI066OW R-3 VB 981 R-3 VB 500 R-3 VB 100 U-1 VB 450 $104,778.97 RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT $1,021.75 $4.50 $408.70 Total Permit Fee: $1,434.95 Mechanical Permit Contractor: SARGE'S HEATING & AC License #: SARGEHA946NC GAS WATER HEATER GAS PIPING VENTILATING FANS FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. 1 $10.00 GAS APPLIANCE<=100,000BT 2 $2.00 HEAT PUMP OR A/C 0-3 TONS 4 $40.00 Total Permit Fee: 1 $12.00 1 $12.00 $76.00 Processed By: Blake, Anita M Printed By: Blake, Anita M Page 1 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electrical wiring, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on-site septic systems, Spokane Regional Fire spnnkter and alarm systems and private access road inspections, Spokane Valley Heatth Distnct 324-1560 Fire Department 892-4122 State law RCW 19.122 requires Mat pnor to any excavation the "CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance, 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date 1 Stio°lane BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 1506 S CHRONICLE RD SPOKANE VALLEY, WA 99206 Parcel Number: 35233.2703 Project Number: 06004315 Inv: 1 Issue Date: 11/01/2006 Permit Use: SFR, GAS HEAT, ON SEWER Permits Plumbing Permit Contractor: END PLUMBING INC License #: ENDPLPI960B3 TOILETS/BIDETS 2 $12.00 SHOWERS 1 $6.00 TUBS I $6.00 DISH WASHERS 1 $6.00 GARBAGE DISPOSAL 1 $6.00 CLOTHES WASHER 1 $6.00 WATER PIPING - DWV 3 $18.00 Total Permit Fee: FOR PLUMBING INSPECTIONS CALL (509) 688-0054. $60.00 1 Payment Summary Total Fees AmountPaid AmountOwing $1,620.95 $0.00 $1,620.95 Tran Date 11/01/2006 Receipt # 7561 Payment Amt $1,620.95 1 Notes / Conditions of Approval PER H. ALLEN, SURETY BOND IS TAKEN CARE OF. AB All driveway approaches to be constructed per Spokane County Standards as adopted by the City of Spokane Valley. Flat portion of a residential approach to be minimum of 16' wide, maximum of 30' wide and combined approach width not to exceed 50% of total frontage. Minimum of 7.5' from each property line, 5' from crosswalks or intersection curb and minimum of 15' of separation between any two approaches. Processed By: Blake, Anita M Printed By: Blake, Anita M Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The pem-iit applicant, by definition, is the prpertyo=nerurunouthohzodagentofdhepmpehyownec|tb8`omnpnnoibi|dycfUhe applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a miriimum, the toliowing inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the perrnittee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly loc,ate the structure may require its relocation at the owner's/permittee's FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete, PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. AH permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire depariment access, on-site drainage C208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card rnust be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior lo ptacement of concrete/asphalt or, if gravel approach, after completiofl. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building departrnent for speciaI inspections in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing interior reversais for sewer) and mechanicai, City of Spokane Vailey Building Division 588-0054 Road cuts for utilities or driveways, City of SpokaValley Public Works 688-0195 or State Depof Transportation 324-6000 Perrnits and inspections for electrical wring, Stale Department mLabor Permits and inspections for Sewer Connection. Spokane County Utilities Division And Industries 324a640 477-360 Permits and urispectionsfor on-site septic systems, Spokane Regional Fire spnrikler ond alarm systems arid pnvate access road inspections. Spokane VaIIey Health m,m*z2^-,550 Fire Department 892-4122 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified, Call before you dig at least 2 working days in advance, 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started withiri 160 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) af-ter two years from the date of permit issuance, regardless of whether the work is finished. If a perrnit is expired for time, a new permit may be obtained for half the perrnit fee based on the value of the remainder of the work to finish the original perrnit. Alt refund requests must be made in writing by the original permittee to the Building Official no later than 180 days afterthe date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date