2010, 02-05 Permit App: 10000292 FoundationProject Number: 10000292 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/5/2010 Page 1 of 2
Project Information:
Permit Use: FOUNDATION FOR HOUSE MOVE Contact: JRLED CORP
Address: 2011 S EARLY DAWN
C - S - Z: SPOKANE VALLEY WA 99037
Setbacks: Front Left: Right: Rear: Phone: (509) 216-4986
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
District: East
Parcel Number: 55192.9029 Block:
SiteAddress: 17418 E COACH RD
Location:: CSV
Lot:
Owner: Name: FORD, STEPHEN H
Address: 120 S TSCHIRLEY RD
SPOKANE VALLEY WA 99206
Zoning: MF -1 MF MDR District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
2/5/2010 By: tmelbourn
Released By:
Sewer Review
Permits:
Originally Released:
2/4/2010 By: mpalaniuk
Released By:
Originally Released: 2/4/2010 By: jdavis
Operator: JD Printed By: JD Print Date: 2/5/2010
Project Number: 10000292 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/5/2010 Page 2 of 2
Building Permit
Contractor: JRLED CORP Firm: JRLED CORP
Address: 2011 S EARLY DAWN Phone: (509) 216-4986
SPOKANE VALLEY WA 99037
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
FOUNDATION R-3 VB FOUNDATI 0 $14,225.00 0 $14,225.00
ON
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes:
Totals: 0 $14,225.00 0 $14,225.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$251.25
$4.50
$100.50
Permit Total Fees: $356.25
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $356.25 $356.25 $100.50 $255.75
$356.25 $356.25 $100.50 $255.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 2/5/2010
JRLED Corp
P.O. Box 1907
Veradale, WA 99037
2-25-10
RE: Removal of responsibility from permit.
City of Spokane Valley,
Please remove JRLED Corp from Permit # 10000292, as I am no longer the General Contractor on this
property at 17418 East Coach and have no further responsibility for this project. This home is incomplete.
Thank You,
Spokane
jValleyy
Community Development
Residential Construction [(New Construction
Permit Application Addition/Remodel
Other:
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: (OCC)01
PERMIT FEE:
Accessory Bldg
Deck
SITE ADDRESS: / 7 //.,?
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS: `/
# OF STORIES:
``
Name: e-, t .C: C..�
icp
2"D FLOOR Q F G:
OU%�K
Name:
19 O 7
FINISHED BASEMENT
SQ. FTG: /17,4
City: r � .re
Zip:
Phone: z t L, it?. o
Address:
HEAT SOURCE: i-�r
Contractor Lic No:
Exp Date:
City Business Lic. No:
City:Fi
%'•
•�?
. M ._
State: OA
Zip:
Phone:
Fax:
Contact Person
Name:
Phone: Z - y 4.245
Describe the scope of work in detail:
Proposed Use:
Contractor:
DIMENSIONS: `/
# OF STORIES:
``
Name: e-, t .C: C..�
icp
2"D FLOOR Q F G:
OU%�K
Address: 2 pL /
19 O 7
FINISHED BASEMENT
SQ. FTG: /17,4
City: r � .re
State: 14,44
Zip:
Phone: z t L, it?. o
Fax:
HEAT SOURCE: i-�r
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ Li
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:/s` /�
DIMENSIONS: `/
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG: g1-1.._ K0
2"D FLOOR Q F G:
OU%�K
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACEe9,-----or
AREA: ...6. ----
FINISHED BASEMENT
SQ. FTG: /17,4
GARAGE SQ. FIG:
/v(%
DECK/COV. PATIO Q. FTG:
/1/04
30% SLOPES ON�-
PROPERTY:
# OF BEDROOMS:
2
CONSTRUCTION TYPE:
.F -, -te
HEAT SOURCE: i-�r
SEWER OR SEPTIC?
1, i--
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATUR
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
Check
❑ Mastercard
Expires:
DATE: �-' ' 1.0
❑ VISA
VIN#:
Spokane
jUalley�
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target.. date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
r Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heardfi-omus
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE REV 9/07
•••
Cr-
cr- 99Z 55 r7"-
N
„
Pg ; Wtre Ro#Ic
11141 *NI, 5a -wet!,
Witre)( 47-4-5Envey./T-
6-6 do'
'PAW
/14-r -5 044-1 e
tur41P -b
MVO Etor eoeta
e )41141
ikri*E677411:
PLANNING DEPT. APPROVED
BY Wi //4-44
DATE.