2012, 08-27 Permit: SW-12002034 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002034
Permit Issued Date:
08/27/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: PAVEL BURLAKOV
Project Name: WHITE BIRCH Applicant: PAVEL BURLAKOV
Permit Type: SEWER Address: 18902 E 2ND AVE
SPOKANE, VALLEY, WA 99016
Phone: (509)892-0381
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
805 N COACH LN
55182.2503
SP -941-93
TR "C" OF SP 93-941 BEING A PTN OF TR 25 OF
BACON'S ADD TO GREENACRES
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 23748 Square Feet
Owner:
Address:
Phone:
Email:
HOPKINS, DENNIS E
PO BOX 861
GREENACRES, WA 99016-0861
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
POULCC*932BQ
POUL CONSTRUCTION
18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
509-979-5872
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 08/27/2012 10:47:42
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002034 08/27/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/27/2012 10:47:42
Printed by: IIS APPPOOL\ASP.NET v4.0