Loading...
2012, 07-30 Permit: SW-12001867 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT • Application Number: SW -12001867 Permit Issued Date: 07/30/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: GREEN HAVEN PH III Permit Type: SEWER Primary Contact: POUL CONSTRUCTION Applicant: POUL CONSTRUCTION Address: 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 Phone: 509-979-5872 Email: SITE INFORMATION: Site Address: 810 N COACH LN Parcel Number: 55182.2501 Subdivision: SP -941-93 Assessor's Description: TR "A" OF SP 93-941 BEING A PTN OF TR 25 OF BACON'S ADD TO GREENACRES Inspection Area: Water District: Consolidated Irrigation District #19 Zoning: Land Area: 20954 Square Feet Owner: BURCH, GEORGE E & DOROTHY L Address: 833 S 195TH DES MOINES, WA 98148 Phone: Email: Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor POULCC*932BQ POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 07/30/2012 11:16:57 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT * Permit Issued Date: Application Number: SW -12001867 - 07/30/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/30/2012 11:16:57 Printed by: IIS APPPOOLWSP.NET v4.0