2010, 09-28 Permit App: 10001787 ResidenceProject Number: 10001787 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: SFR W/ ATT GAR Contact: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD
C - S - Z: SPOKANE WA 99206
Setbacks: Front Left: Right: Rear: Phone: (509) 892-0454
Group Name:
Site Information: Project Name:
Plat Key: Name: Range District: East
Date: 9/28/2010 Page 1 of 3
Parcel Number: 55182.4105
SiteAddress: 1522 N COACH LN
Location:: CSV
Zoning: R-4
Water District:
Block: Lot:
SF Res Urban District
Area: 7,020 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Owner: Name: HOMESTEAD CONSTRUCTION, I
Address: 212 S FARR RD
SPOKANE, WA 99206
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released: 9/27/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:1
Sewer Review
Permits:
Originally Released: 9/24/2010 By: mpalaniuk
Released By:
Originally Released: 9/24/2010 By: jdavis
Operator: JD Printed By: JD Print Date: 9/28/2010
Project Number: 10001787 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/28/2010 Page 2 of 3
Building Permit
Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD Phone: (509) 892-0454
SPOKANE, WA 99206
This Application: Total Project:
Description Grp km Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB 1,189 $117,651.55 1,189 $117,651.55
COV DECK R-3 VB 160 $2,400.00 160 $2,400.00
GAR WOOD U-1 VB 471 $8,949.00 471 $8,949.00
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
HOURLY REVIEW FEE
Totals: 1,820 $129,000.55 1,820 $129,000.55
Units Unit Desc Fee Amount
1 SELECT $1,161.75
1 SELECT $4.50
1 SELECT $464.70
2 # OF HOURS $122.00
Permit Total Fees:
Mechanical Permit
$1,752.95
Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD
SPOKANE, WA 99206
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
VENTILATING FANS 1 DUCT
Phone: (509) 892-0454
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
4 NUMBER OF
Permit Total Fees:
Plumbing Permit
Fee Amount
$11.00
$13.00
$44.00
$68.00
Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD Phone: (509) 892-0454
SPOKANE, WA 99206
Item Description
TOILETS/BIDETS
SINKS
TUBS
DISH WASHERS
CLOTHES WASHER
FLOOR DRAINS
MISCELLANEOUS FIXTURES
Units Unit Desc
2 NUMBER OF
4 NUMBER OF
2 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
3 NUMBER OF
Fee Amount
$12.00
$24.00
$12.00
$6.00
$6.00
$6.00
$18.00
Permit Total Fees: $84.00
Operator: JD Printed By: JD Print Date: 9/28/2010
Project Numbers 10001787 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/28/2010 Page 3 of 3
A 6 -FOOT HIGH SIGHT -OBSCURING FENCE MUST BE INSTALLED AROUND PERIMETER
OF VALLEY COACH ESTATES SUBDIVISION PRIOR TO ANY BUILDING PERMITS -MH
THE FENCE HAS BEEN INSTALLED. BUILDING PERMITS FOR VALLEY COACH ESTATES
ARE OKAY -MH
Payment Summary:
Permit Type
Building Permit
Mechanical Permit
Plumbing Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$1,752.95 $1,752.95 $480.38 $1,272.57
$68.00 $68.00 $0.00 $68.00
$84.00 $84.00 $0.00 $84.00
$1,904.95 $1,904.95 $480.38 $1,424.57
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 9/28/2010
cn
cw
SpOkane
VaHey
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037 •
www.spokanevalley.org
PERMIT NUMBER:
of 787
PERMIT FEE:
gNew Construction
D Addition/Remodel
E Other:
Accessory Bldg
Deck
SITE ADDRESS:
ASSESSORS PARCEL NO: s \6 LEGAL DESCRIPTION: \,,__c,"T c4\
Building Owner:
• x ... 41, ..
Name: \\c...t.„.....,.\ .,,....,,_
c,,c,
Address:
2Nu FLOOR SQ. FTG:
City: ‘
State \ . Zip•
'\ c\IA,l3
Phone:
Fax:
':\r•lk- '55'\--NsL
Contact Person
Name:
Phone: r-ylt•\.. \c:\
Describe the scope of work in detail:
- —
ContractOri
DIMENSIONS:
# OF STORIF:
Name:\_.,\
\ \ -..c--,......t...,\N -,
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
Address:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
City:
State:
Zip:
Phone:
Fax:
H .
. si"s-..
Contractor Lic NO:
Exp Date:
City Business Lic. No: , ‘
VC(\
—
Cost of Project: $
\L'.*::N • C%" -"'N
Proposed Use:
**************The followingMUST be complete: (write N/A if not a licable **********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIF:
TOTAL HABI SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
...
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGELT. TG:
DEC OV. PATI SQ. FTG:
i 6re,
30% SLOPES ON
PROPERTY:
# QF BEDROOMS:
CONSTRUCTION TYPE:
H .
. si"s-..
SEWER OR SEPTIC?
''•\e..•..--4-C-
The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) Ail construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit Is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently Approved before
this application can be processed.
SIGNATURE:
Method of Payment:
Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
Check
o Mastercard
Expires:
DATE: c\
o VISA
VIN#:
r u<1.0.al i
COnuf:unity D,cvelopmalt
Permit Center
11707 E Sprague Ave, Suits 106
-Spokane Valley, WA 99206
(509)688-0036 FAX (509)688.0037
www.sookanevallev.org
Mezaanic.al Permit Application
PERMIT NUMBER:
PERMIT FEE:
0 Commercial 12:1 Residential
srrx ADDR:-SS:
\ `)---)-
Bull.._...4 ,.
. , .
Nam,:
•
?haw:
Fax:
City:
State: -
Zip:
Coe
.....,..-
Narrk•:
Pl*:oc
Fax:
Add,
Lice.
.:
Citi:
State:Zip:
..,:
at/ :.
•
Lac
.,*....,1,444,44,749#
• ,
„ „
L ..1-915:tkfk. .
...,
1 ,
,s.;, . , • .:41-,..'" „
•
. •
Nam-
:RIPTION OF WORK
FULL BURNING APPLIANCE
I FUEL BURNING APPLIANCE
-
0 Of WITS
X COST
- TOTAL AMOUNT
E oxlip or Me then 100)100
*mew 100,000
X
512.00
$15.00
:_,LIr.TED APPLIANCE (Additional Fel)
t ;51ED APPLIANCE (Add)tionel FOO
APPLIANCE (WSEC min, AFUE 'rating)
APPLIANCE (WSEC min. AFUE 'feting)
EQUela0crl.s. ton 400,000
$50.00
lAw• then 40=0
$100.00
Iostry 400.000
• Mom ft/1400,000
X
$50.00
$100.00
-'REFRIGERATION
•
L ER -REFRIGERATION t
ERl(ER.ATION
REFRIGERATION
G, GAS INSERT, GAS FIREPLACE
1 WOMJ5TU
1O1.S00UBTU
X
$12.00
X
$20.00
501 - 1,0101 BTU
X
825.00
1421 -inam amy
$35.00
IAD. then 1.750M BTU
860.00
510.00
x
510.00
X
uurzt,ING WATER HEATER
i-UEL BURNING APPLIANCE
,f1:3ING (each outiet)
l'3TEk•LS
x
110.00
$10.00
$10.00
$1.00
$10.00
GFAN5
LER
DOES NOT Indlit100011,11) •
I.. ER ,DOES NOT IncludiSIIX:en01
„k7r. E COOLERS
X
$10.00
tOA11011410111en 1Q. M
X
$12.00
Chostillion tOrCK4cu
X .
815.00
X
x
.110.00
550.00
IOC°
x
510.00
.VP/AIR CONDITIONER -
-0 TON
X
$12.00
:D ,TIONER
..„D; tIONER
rGE TANK.
.•R PELLET STOVE/INSERT'
:TcNE - FREE STANDING
•
.DLITIONS
ON SYSTEMS
.,TION MECHANICAL EXHAUST
A. OR - RESIDENCE •
. 0 - COMMERCIAL.
L.0 PAYMENT:
C.-IECI< 0 VISA DUC
.:,I0.1ATURE: •
3-15 TN
X
$20.00
' 1840 TON
X
$25.00
12:10TON
X
835.00
%Whim 50 TCE4
X
180.00
X
$10.00
X
810.00
X
825.00
X
115.00
X
$12.00
X
812.00
X
$19.30
X
$22.00
jii.TOTAL
0510=531NC ru
$35.00
TOTAL MINT PU DuE:
Punt Cantor
11707 8'Sprague Ave. Suit. 106
'Spokane Valley. WA 99206
(509)68E-0036 FAX (509)618-0037
moity Development www.sookanevallev.orq,n
'lambing Permit Application
PERMIT NUMBER:
PERMIT FEE:
0 Commercial [Residential
1TZ ADDRESS: N . \:». C t",
•
DESCRIPTION OF WORK
Il OF UNITS
X
COST
•
TOTAL AMOUNT
1
TOILETS
Ione
Th...
Phone:
Fax:
•
2
URINALS
ddroat:
City: Sate
10.00
Zip:
S
TUBS
O •..
. . ... .+e .k.'LY '`•r:;••%t.'d.Mt••:• • .. .... , ,7,'ai: .• ak0l:rfi. Y`Ii g(.''h.,r;
.
10.00
,.
-.
.line
t
Phone:
Fax:
11.00
is
6
ddrau
1
City : State
X
Zip:
•
9
Leake No:
City Business License No:
X
10.00
■
7
�Oialt..,.X
•.-il. , ."4.,%9:11:•...-;.,='•,..,
.'.Lri.P., •,-� :.?.M•AI�r l�':k{i'�:�tw.�'�
�«p•!�"•�.e'�iii• y•tf: 1s1I'��,i..,:1+P�,:•�ei�!•1"
'?q:; •.Y:\•..;".7..4,-::,:;!1::
� :.rte•:
L .., ..._.
.. „����..
;ri
.1111111C
Phone:
X
18.00
•
9
•
AVIiio11IZBD SIGNATURE:
aavtsaD 112005
DESCRIPTION OF WORK
Il OF UNITS
X
COST
•
TOTAL AMOUNT
1
TOILETS
WATER CLOSET, BIDETS
Th...
X
18.00
•
2
URINALS
X
10.00
•
S
TUBS
1r
X
10.00
■
4
SHOWERS (PER TRAP)
BATH. STALL. QN-S(TE BUILT
X
11.00
is
6
SINKS
LAVSIBASINS, BAR FLOOR KITCHEN,
LAUNDRY. UT1UTY. JANITOR PHOTO.
X-RAY. FOOD. PREPIC UUNARY MEAT
Qc '
X
10.00
•
9
DISHWASHER
i
X
10.00
■
7
CLOTHES WASHER
\
X
10.00 •
■
•
GARAGE DISPOSAL
X
18.00
•
9
WATER SOFTENER
•
X
80.00
■
10
ELECTRIC HOT WATER TANK
NOTE: IF t $. SEE b1ECVLMIICAI
X
18.00
No
11
r{�pQ!Ifpj�IN>p
AE.a, CASE. Cali TRENCH. CONDENSATE
\
X
10.00
•
12
r D0RA3NS l�VERFLgN
GRAINS
I
,
X
00
.
13
KtINl'(IN S. DRINKING
1
X
10.00
■
•
14
WATER PIPINGIORAri•INWASTE.
VENT. PLUISING. REVERSAL
NSTALLATION.ALTERATION. REPAIR.
REALS
X
10,00
■
16
SEWAGE EJECTOR '
' GRINDER SUMP PUMP
X
80.00
•
19
•ICE
WATER USING DEVKE
AN/OR COFFEE MAKER HOSE BIB,
STEAMER
PROOFER CARBONATOR, SWAMP COOLER
X
80.00
■
17
CROSS CONNECTION DEVICE
VACUUM BREAKER CHECK VALVE
ANO R,P.B.P ATSLABOILERS
X
10.00
■
11
INTERCEPTORS
CHEMICAL HOLDING TANKf
X
80.00
• is
19
TICAL GAB berou6et)
NITROUS. OXYGEN
X
10,00
•
20
MISCELLANEOUS PW&MING
MORE
X
x•00
21
PRIVATE SEWAGE DISPOSAUSYS
X
120.00
•
22
INDUSTRIAL WASTE
_ INTERCEPTOR.
116,00
toAL
METHOD OF PAYMENT:
0 CASH 0 CHECK . p VISA 0 MASTERCARD
• Car*, EXPIRES:
Si
PROCESSING FEE
835.00
TOTAL mar FEE DUE:
AVIiio11IZBD SIGNATURE:
aavtsaD 112005
Spokane
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
•
J`1/4
.S
S d.. 3
S• \ \od. • Le.w
4.
PLANNING DEPT. APPROVp
BY: 74
DATE:
9�y%z�ry