Loading...
2010, 09-28 Permit App: 10001787 ResidenceProject Number: 10001787 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ ATT GAR Contact: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD C - S - Z: SPOKANE WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 892-0454 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Date: 9/28/2010 Page 1 of 3 Parcel Number: 55182.4105 SiteAddress: 1522 N COACH LN Location:: CSV Zoning: R-4 Water District: Block: Lot: SF Res Urban District Area: 7,020 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Owner: Name: HOMESTEAD CONSTRUCTION, I Address: 212 S FARR RD SPOKANE, WA 99206 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 9/27/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By:1 Sewer Review Permits: Originally Released: 9/24/2010 By: mpalaniuk Released By: Originally Released: 9/24/2010 By: jdavis Operator: JD Printed By: JD Print Date: 9/28/2010 Project Number: 10001787 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/28/2010 Page 2 of 3 Building Permit Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509) 892-0454 SPOKANE, WA 99206 This Application: Total Project: Description Grp km Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,189 $117,651.55 1,189 $117,651.55 COV DECK R-3 VB 160 $2,400.00 160 $2,400.00 GAR WOOD U-1 VB 471 $8,949.00 471 $8,949.00 Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT HOURLY REVIEW FEE Totals: 1,820 $129,000.55 1,820 $129,000.55 Units Unit Desc Fee Amount 1 SELECT $1,161.75 1 SELECT $4.50 1 SELECT $464.70 2 # OF HOURS $122.00 Permit Total Fees: Mechanical Permit $1,752.95 Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD SPOKANE, WA 99206 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU VENTILATING FANS 1 DUCT Phone: (509) 892-0454 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 4 NUMBER OF Permit Total Fees: Plumbing Permit Fee Amount $11.00 $13.00 $44.00 $68.00 Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509) 892-0454 SPOKANE, WA 99206 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS CLOTHES WASHER FLOOR DRAINS MISCELLANEOUS FIXTURES Units Unit Desc 2 NUMBER OF 4 NUMBER OF 2 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF Fee Amount $12.00 $24.00 $12.00 $6.00 $6.00 $6.00 $18.00 Permit Total Fees: $84.00 Operator: JD Printed By: JD Print Date: 9/28/2010 Project Numbers 10001787 Inv: 1 Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/28/2010 Page 3 of 3 A 6 -FOOT HIGH SIGHT -OBSCURING FENCE MUST BE INSTALLED AROUND PERIMETER OF VALLEY COACH ESTATES SUBDIVISION PRIOR TO ANY BUILDING PERMITS -MH THE FENCE HAS BEEN INSTALLED. BUILDING PERMITS FOR VALLEY COACH ESTATES ARE OKAY -MH Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount Invoice Amount Amount Paid Amount Owing $1,752.95 $1,752.95 $480.38 $1,272.57 $68.00 $68.00 $0.00 $68.00 $84.00 $84.00 $0.00 $84.00 $1,904.95 $1,904.95 $480.38 $1,424.57 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 9/28/2010 cn cw SpOkane VaHey Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 • www.spokanevalley.org PERMIT NUMBER: of 787 PERMIT FEE: gNew Construction D Addition/Remodel E Other: Accessory Bldg Deck SITE ADDRESS: ASSESSORS PARCEL NO: s \6 LEGAL DESCRIPTION: \,,__c,"T c4\ Building Owner: • x ... 41, .. Name: \\c...t.„.....,.\ .,,....,,_ c,,c, Address: 2Nu FLOOR SQ. FTG: City: ‘ State \ . Zip• '\ c\IA,l3 Phone: Fax: ':\r•lk- '55'\--NsL Contact Person Name: Phone: r-ylt•\.. \c:\ Describe the scope of work in detail: - — ContractOri DIMENSIONS: # OF STORIF: Name:\_.,\ \ \ -..c--,......t...,\N -, MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: Address: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: City: State: Zip: Phone: Fax: H . . si"s-.. Contractor Lic NO: Exp Date: City Business Lic. No: , ‘ VC(\ — Cost of Project: $ \L'.*::N • C%" -"'N Proposed Use: **************The followingMUST be complete: (write N/A if not a licable ********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIF: TOTAL HABI SPACE: MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: ... IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGELT. TG: DEC OV. PATI SQ. FTG: i 6re, 30% SLOPES ON PROPERTY: # QF BEDROOMS: CONSTRUCTION TYPE: H . . si"s-.. SEWER OR SEPTIC? ''•\e..•..--4-C- The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) Ail construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently Approved before this application can be processed. SIGNATURE: Method of Payment: Cash Bankcard #: Authorized Signature: REVISED 2/15/07 Check o Mastercard Expires: DATE: c\ o VISA VIN#: r u<1.0.al i COnuf:unity D,cvelopmalt Permit Center 11707 E Sprague Ave, Suits 106 -Spokane Valley, WA 99206 (509)688-0036 FAX (509)688.0037 www.sookanevallev.org Mezaanic.al Permit Application PERMIT NUMBER: PERMIT FEE: 0 Commercial 12:1 Residential srrx ADDR:-SS: \ `)---)- Bull.._...4 ,. . , . Nam,: • ?haw: Fax: City: State: - Zip: Coe .....,..- Narrk•: Pl*:oc Fax: Add, Lice. .: Citi: State:Zip: ..,: at/ :. • Lac .,*....,1,444,44,749# • , „ „ L ..1-915:tkfk. . ..., 1 , ,s.;, . , • .:41-,..'" „ • . • Nam- :RIPTION OF WORK FULL BURNING APPLIANCE I FUEL BURNING APPLIANCE - 0 Of WITS X COST - TOTAL AMOUNT E oxlip or Me then 100)100 *mew 100,000 X 512.00 $15.00 :_,LIr.TED APPLIANCE (Additional Fel) t ;51ED APPLIANCE (Add)tionel FOO APPLIANCE (WSEC min, AFUE 'rating) APPLIANCE (WSEC min. AFUE 'feting) EQUela0crl.s. ton 400,000 $50.00 lAw• then 40=0 $100.00 Iostry 400.000 • Mom ft/1400,000 X $50.00 $100.00 -'REFRIGERATION • L ER -REFRIGERATION t ERl(ER.ATION REFRIGERATION G, GAS INSERT, GAS FIREPLACE 1 WOMJ5TU 1O1.S00UBTU X $12.00 X $20.00 501 - 1,0101 BTU X 825.00 1421 -inam amy $35.00 IAD. then 1.750M BTU 860.00 510.00 x 510.00 X uurzt,ING WATER HEATER i-UEL BURNING APPLIANCE ,f1:3ING (each outiet) l'3TEk•LS x 110.00 $10.00 $10.00 $1.00 $10.00 GFAN5 LER DOES NOT Indlit100011,11) • I.. ER ,DOES NOT IncludiSIIX:en01 „k7r. E COOLERS X $10.00 tOA11011410111en 1Q. M X $12.00 Chostillion tOrCK4cu X . 815.00 X x .110.00 550.00 IOC° x 510.00 .VP/AIR CONDITIONER - -0 TON X $12.00 :D ,TIONER ..„D; tIONER rGE TANK. .•R PELLET STOVE/INSERT' :TcNE - FREE STANDING • .DLITIONS ON SYSTEMS .,TION MECHANICAL EXHAUST A. OR - RESIDENCE • . 0 - COMMERCIAL. L.0 PAYMENT: C.-IECI< 0 VISA DUC .:,I0.1ATURE: • 3-15 TN X $20.00 ' 1840 TON X $25.00 12:10TON X 835.00 %Whim 50 TCE4 X 180.00 X $10.00 X 810.00 X 825.00 X 115.00 X $12.00 X 812.00 X $19.30 X $22.00 jii.TOTAL 0510=531NC ru $35.00 TOTAL MINT PU DuE: Punt Cantor 11707 8'Sprague Ave. Suit. 106 'Spokane Valley. WA 99206 (509)68E-0036 FAX (509)618-0037 moity Development www.sookanevallev.orq,n 'lambing Permit Application PERMIT NUMBER: PERMIT FEE: 0 Commercial [Residential 1TZ ADDRESS: N . \:». C t", • DESCRIPTION OF WORK Il OF UNITS X COST • TOTAL AMOUNT 1 TOILETS Ione Th... Phone: Fax: • 2 URINALS ddroat: City: Sate 10.00 Zip: S TUBS O •.. . . ... .+e .k.'LY '`•r:;••%t.'d.Mt••:• • .. .... , ,7,'ai: .• ak0l:rfi. Y`Ii g(.''h.,r; . 10.00 ,. -. .line t Phone: Fax: 11.00 is 6 ddrau 1 City : State X Zip: • 9 Leake No: City Business License No: X 10.00 ■ 7 �Oialt..,.X •.-il. , ."4.,%9:11:•...-;.,='•,.., .'.Lri.P., •,-� :.?.M•AI�r l�':k{i'�:�tw.�'� �«p•!�"•�.e'�iii• y•tf: 1s1I'��,i..,:1+P�,:•�ei�!•1" '?q:; •.Y:\•..;".7..4,-::,:;!1:: � :.rte•: L .., ..._. .. „����.. ;ri .1111111C Phone: X 18.00 • 9 • AVIiio11IZBD SIGNATURE: aavtsaD 112005 DESCRIPTION OF WORK Il OF UNITS X COST • TOTAL AMOUNT 1 TOILETS WATER CLOSET, BIDETS Th... X 18.00 • 2 URINALS X 10.00 • S TUBS 1r X 10.00 ■ 4 SHOWERS (PER TRAP) BATH. STALL. QN-S(TE BUILT X 11.00 is 6 SINKS LAVSIBASINS, BAR FLOOR KITCHEN, LAUNDRY. UT1UTY. JANITOR PHOTO. X-RAY. FOOD. PREPIC UUNARY MEAT Qc ' X 10.00 • 9 DISHWASHER i X 10.00 ■ 7 CLOTHES WASHER \ X 10.00 • ■ • GARAGE DISPOSAL X 18.00 • 9 WATER SOFTENER • X 80.00 ■ 10 ELECTRIC HOT WATER TANK NOTE: IF t $. SEE b1ECVLMIICAI X 18.00 No 11 r{�pQ!Ifpj�IN>p AE.a, CASE. Cali TRENCH. CONDENSATE \ X 10.00 • 12 r D0RA3NS l�VERFLgN GRAINS I , X 00 . 13 KtINl'(IN S. DRINKING 1 X 10.00 ■ • 14 WATER PIPINGIORAri•INWASTE. VENT. PLUISING. REVERSAL NSTALLATION.ALTERATION. REPAIR. REALS X 10,00 ■ 16 SEWAGE EJECTOR ' ' GRINDER SUMP PUMP X 80.00 • 19 •ICE WATER USING DEVKE AN/OR COFFEE MAKER HOSE BIB, STEAMER PROOFER CARBONATOR, SWAMP COOLER X 80.00 ■ 17 CROSS CONNECTION DEVICE VACUUM BREAKER CHECK VALVE ANO R,P.B.P ATSLABOILERS X 10.00 ■ 11 INTERCEPTORS CHEMICAL HOLDING TANKf X 80.00 • is 19 TICAL GAB berou6et) NITROUS. OXYGEN X 10,00 • 20 MISCELLANEOUS PW&MING MORE X x•00 21 PRIVATE SEWAGE DISPOSAUSYS X 120.00 • 22 INDUSTRIAL WASTE _ INTERCEPTOR. 116,00 toAL METHOD OF PAYMENT: 0 CASH 0 CHECK . p VISA 0 MASTERCARD • Car*, EXPIRES: Si PROCESSING FEE 835.00 TOTAL mar FEE DUE: AVIiio11IZBD SIGNATURE: aavtsaD 112005 Spokane For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 • J`1/4 .S S d.. 3 S• \ \od. • Le.w 4. PLANNING DEPT. APPROVp BY: 74 DATE: 9�y%z�ry