Loading...
2010, 12-21 Permit App: 10004090 ResidenceProject Number: 10004090 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW SFR - SEWER Contact: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD C - S - Z: SPOKANE WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 892-0454 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Date: 12/21/2010 Page 1 of 3 Parcel Number: 55182.4106 Block: SiteAddress: 1526 N COACH LN Location:: CSV Lot: Owner: Name: HOMESTEAD CONSTRUCTION, I Address: 312 S FARR RD SPOKANE VALLEY, WA 99206 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 7,092 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review I Released By: I Originally Released: 12/21/2010 By: tmelbourn Landuse/Zoning/HE Conditions 1_Released By: Sewer Review Permits: Originally Released: 12/21/2010 By: tschmidt Released By: Operator: jmm Printed By: jmm Print Date: 12/21/2010 Project Number: 10004090 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/21/2010 Page 2 of 3 Building Permit Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD SPOKANE, WA 99206 Phone: (509) 892-0454 This Application: Total Project: DescriptionGtr Type Notes Sq Ft Valuation Su Ft Valuation 1&2 FAMILY R-3 VB 900 $89,055.00 900 $89,055.00 2ND FLOOR R-3 VB 707 $52,466.47 707 $52,466.47 BASEMENT U R-3 VB 496 $7,440.00 496 $7,440.00 DECK OPEN R-3 VB 24 $360.00 24 $360.00 GAR WOOD U-1 VB 422 $8,018.00 422 $8,018.00 Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 2,549 $157,339.47 2,549 $157,339.47 Units Unit Desc Fee Amount 1 SELECT $1,318.55 1 SELECT $4.50 1 SELECT $527.42 Permit Total Fees: Mechanical Permit $1,850.47 Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD SPOKANE, WA 99206 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU VENTILATING FANS 1 DUCT Phone: (509) 892-0454 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 4 NUMBER OF Permit Total Fees: Plumbing Permit Fee Amount $11.00 $13.00 $44.00 $68.00 Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509) 892-0454 SPOKANE, WA 99206 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 3 NUMBER OF $18.00 SINKS 4 NUMBER OF $24.00 TUBS 3 NUMBER OF $18.00 DISH WASHERS 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 FLOOR DRAINS 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00 Permit Total Fees: $96.00 Operator: jmm Printed By: jmm Print Date: 12/21/2010 Project Number: 10004090 Inv: 1 Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/21/2010 Page 3 of 3 A 6 -FOOT HIGH SIGHT -OBSCURING FENCE MUST BE INSTALLED AROUND PERIMETER OF VALLEY COACH ESTATES SUBDIVISION PRIOR TO ANY BUILDING PERMITS -MH THE FENCE HAS BEEN INSTALLED. BUILDING PERMITS FOR VALLEY COACH ESTATES ARE OKAY -MH Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,850.47 $1,850.47 $493.82 $1,356.65 Mechanical Permit $68.00 $68.00 $0.00 $68.00 Plumbing Permit $96.00 $96.00 $0.00 $96.00 $2,014.47 $2,014.47 $493.82 $1,520.65 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 12/21/2010 Spokane Community Development Residential Construe ionor:- Permit Application Permit Center _ -- 11 70,-Spra.- Spok e Va11ey,WA E- k (509) 8-003,,6 www. sokanevallev „ *68870%37 PERMIT NUMBER: PERMIT FEE: New struction L Addition/Remodel L Other: Accessory Bldg Deck SITE ADDRESS: \ \.) ASSESSORS PARCEL NO: LEGAL DESCRIPTION: \4,c1, •N_J Building Owner: DIMENSIONS: l..A i- A,i # OF STORIES: A .• r Name: \c_\...:c,...,......._ \ Cz..,,,..c. Address: ...i..1.;c1-..es...r.%)... IMPERVIOUS SURFACE Address: • City: State: Zip: Phone: City: c . --- , ,-....,.. ,-,, ,.... State: \....P. Zip • e\ -N)_... Phone: , '%c\''.. -.1'.L.',',.'"--PT Fax: C)\--<•••r:Ii)\-\. Contact Person - Name: Phone: Describe the scope of work in detail: Cost of Project: $ Proposed Use: **************The following MUST be c ********************** HEIGHT TO PEAK: DIMENSIONS: l..A i- A,i # OF STORIES: Narne: MAIN FLOOR TO SQ. FTG: q474'AREA: A.., \ei4 2Nu FLOOR SQ. FTG: 707 Address: ...i..1.;c1-..es...r.%)... IMPERVIOUS SURFACE FINISHED BASEMENTid SQ. FTG: -_,..ssc-0 City: State: Zip: Phone: Fax: HEAT SOURCE: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ Proposed Use: **************The following MUST be c ********************** HEIGHT TO PEAK: DIMENSIONS: l..A i- A,i # OF STORIES: TOTAL HABITABLE SPACE: al 03 MAIN FLOOR TO SQ. FTG: q474'AREA: A.., \ei4 2Nu FLOOR SQ. FTG: 707 UNFIN BASEMENT SQ. FTG: "Lb -i G. ...i..1.;c1-..es...r.%)... IMPERVIOUS SURFACE FINISHED BASEMENTid SQ. FTG: -_,..ssc-0 GARAGE SQ. FTG: t-'4t.,e5 422--' DECK/COV. PATIO SQ. FTG: Sie:SZ-1 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done In full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check DATE: 0 Mastercard 0 VISA Expires: VIN#: Permit Center 11707 B Sprague Ave, Suite 106 Spokane Valley. WA 99206 (509)655-0036 FAX (509)611-0037 ' "11m Iy Dewlopmmt 2comialambing Permit Application 0 Commercial la Residential PERMIT NUMBER: PERMIT FEE: ITS ADDRLSS: \'S -/.Li. s. AU HORIZBD SIGNATURE: amsm LWOW •�'LY:K,.�J.•L'. ..:.�.... ,..... ...- - �. ',.y,a� !:`.... 9 OF UNITS - ... COST Yttdli��'MNl�. `\`�C'�w�1s..cc� Iertta: Phone: Fax: WATER CLOSET. BIDETS 3 X 11.00 eare.e City: Sate: Zip: URINALS X �,�.,;•.�.,� ..,, :� O noncar�' .,...•., , ...,.,....„-,,........-••.....(0,,,,-..." :-.a° � .. .. •,. .:''. .v ' .ly. �SL.�" `= :`•n)•'bt�'d.M'r. •. ��, • ,hE +. �": .1v. .ks:rk. ' .,... :'�:•:' .r .. ... , . .n emx I Phone: Fax: 4 SHOWERS (PER TRAP) BATH. STALL, ONSITE BUILT ddresc I City : Stam Tap: - 5 SINKS• tows No: I City Bushiest License No: X 11.00 • 4 �. s:�f1 ,•. �,.. j ientaetn.t.:7"1: i..:•11.;ry- fh. 7t.r>;.-t140.. o,.. ix+r .;.: 1 t� 11���, ,r;, ,N.F.::_'i •••',wwlli1 J --'imk � ;;•,;.,,,'1r: ei3ui:'�''<3'�f. ? I'ji.0 IG::i� N' A,., :,.: y;• :7 w°h:i.''�,�: s,•- 11.00 .�.. .. ;ri'. ame: Phone: \ X 11.00 • - AU HORIZBD SIGNATURE: amsm LWOW DESCRIPTION OF WORK 9 OF UNITS X COST • TOTAL AMOUNT 1 TOILETS WATER CLOSET. BIDETS 3 X 11.00 ■ 2 URINALS X 11.00 - 3 TUBS X 15.00 • 4 SHOWERS (PER TRAP) BATH. STALL, ONSITE BUILT X 11.00 - 5 SINKS• L&V8/BASNS. BAR, FLOOR, KITCHEN. LAUNDRY. UTILITY, JANITOR. PHOTO. X-RAY. FOOD. PREP/CULINARY MEAT -\ X 11.00 - 4 DISHWASHER \ X 11.00 ■ 7 CLOTHES,WASHER \ X 11.00 • - 4 GARBAGE DISPOSAL• X 16.00 - 9 WATER SOFTENER ' . X 14,00 - 10 ELECTWC HOT WATER TANK • NOTE: IF RAs. see MECHANICAL X *600 - 11MTQ AREA. CASE. CDII.1TRENCH. CONDENSATE \ ,. x $0.00 _ - 12 DRAM;$� ERF if , X 14.00 - 1* POUNTeilli DRINKING 1 X *100 - 14 WATSRPIPINGCRAM{.W WASTE. VENT. PU1mP G. REVERSAL NSTALLATION.ALTERATION. REPAIR. REVERSALS X 15,00 • 15 SEWAGE EJECTOR • ' GRINDER SUMP PUMP X 15.00 ■ 14 WATER USING DEVICE ICE AN/OR COFFEE MAKER, HOSE BIB, STEAMER PROOFER. CARBONATO SWAMP COOLER X *0.00 - 17 CROSS CONNECTION DEVICE VACUUM BREAKER, Gi'IECK VALVE. AND D R,P.B.P 0� FQR VATS, TANKS. BOILERS , X, *5.00 - 15 I PTORS We CHEMICAL HOLDING TANK X 5500 . • 14 MEDICAL GAS (per outlet) NITROUS. OXYGEN X *0.00 1' 20 1SSCELIANioUB PUJM G nom x woo - 21 PRNATE BEyIAGE DISPOSAL/SYS : . X *20.00 - 22 MDU$TWALWASTE MEQX 115.00 • METHOD OF PAYMENT: 0 CASH . 0 CHECK . - ❑ VISA ❑ MASTERCARD Cards EXPIRES: • alga& PROCESSING FEE 535.00 TOTAL PERMIT FEE DUE: AU HORIZBD SIGNATURE: amsm LWOW Permit Center 11707 E Sprague Ave, Suite 106 . 1 . Spokane Valley, WA 99206 i ' .� ti lig. j� (509)688-0036 FAX: (509)688-0037 Com.. ._,iy Cr vein meat www.st>okancvallcv.orr Me �ar:i�al l'ermit Application ❑ Commercial gi Residential PERMIT NUMBER: PERMIT FEE: srr-.• : Bulk-, Lie . cr Nam=.: Phone: Fax: Cour Nam. Addy . City: State: Zip: Phone Fax: City: State: Zip: lice City Business La Nun. •1. '411174 : ♦t,w 1 [�J J .. �Civr T10N Of WORK • OF WITT X COST TOTAL AMOUNT F+ EL FCRNING APPLIANCE r. a 51:RNING APPLIANCE .LIS ; D APPLIANCE (Additional Fee) LSl TD APPLIANCE (Additional Fee) Ewell* orAm then 34O.o0o Mme then 100.000 \ x 812.00 ■ X 15.00 ■ Brame t0 4r lea than 400.000 X $50.00 ■ "D "''LIANCE (WSEC'min. AFUE iatln0) PLIANCE (WSEC min. AFUE ra na) ALE: EFRIGERATION JILEi;, EFRIGERATION _ILEI EFRIGERAT1ON t ��tLEF. EFRIGERATION JILEF EFRIGERATION Iazttan 400.000 x 8100.00 Eawet b aristo Mien 400900 X 850.00 Mews then 400.000 X 1100.00 1.144POTU X $12.00 ■ 141.00OM BTU X 820.00 ■ 041-1,04014 BTU X $25.00 j 1.1.764M Fry x 835.00 MVO$ten 1.750M BTU X 860.00 as Lr GAS INSERT, GAS FIREPLACE X $10.00 ■ NG 2YEF JEL E WING WATER HEATER SCJ :.=L BURNING APPLIANCE S P.. , :G (each outlet) fCT TENS NT.. . ,NG FANS ' 2 Ft - LER (DOES NOT ind�ideVtktitV R K- LL" -ER (DOE$ NOT ktidudiductlnp) JAPt. :.TIVE COOLERS ,'PEI OGD ,PE ; DOD AT . +..IPIA:R CONDITIONER ' TIGER C. ,TIC+IER C_ T C ER C ;TIONER O ,1.G;� TANK. - DC•. P '_LET STOVE: NSERT - FREE STA':DING PA. ADJmONS NT . .,l ON SYSTEMS N1 ;ON MECHANICAL EXHAUST .t0r.-RESIDENCE • r0;: - COMMERCEAL iY. JP F' .•.YMENT: 0 CHECK 0 vsA 0 u . SIC -NATURE: X $10.00 X X 110.00 ■ $10.00 ■ x 810.00 x $1.00 x 810.00 ■ 4 810.00 VIII 1Q INS tie 14.044 CPU x $12.00 %Orlin 1uot-CrM 115.00 x 16. x x 110.00 • 00" ■ 810.00 ■ -04 TON x 112.00 ■ S-15 TON x $20.00 Ikao ToN x 125.00 ■ WCTON $35.00 ■ IIhen 00 TON x 860.00 ■ Oa - 810.00 ■ x 810.00 x $26.00 x 115.00 x $12.00 ■ X $12.00 ■ x 819.00 x $22.00 EXPIRES: Vttt ilipTOTAL HROCXS$SiG rets $35.00 TOTAL M1R NT Pita DUE: Spokaiie~ 4.0Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review A Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. A Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. A Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 1 \g• PLANNING DEPT. APPROVED BY. 4-,-2 DATE: -2 DATE: OfrOo •