Loading...
2008, 08-26 Permit App: 08003249 ResidenceProject Number: 08003249 Inv: 1 Application Date: 8/26/2008 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW SFR SEWER Contact: DIAMOND ROCK CONSTRUCTION Address: 2602 N SULLIVAN RD C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 924-8964 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 55073.2819 Block: SiteAddress: 1921 N COACH DR Location:: CSV Lot: Owner: Name: DIAMOND ROCK CONSTRUCTIO Address: 2602 N SULLIVAN RD SPOKANE VALLEY, WA 99216 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Area: 8,659 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 8/20/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: SUB -04-05 PUD -02-05 Sewer Review Permits: Originally Released: 8/25/2008 By: mbasinger Released By: Operator: jmm Printed By: JD Print Date: 8/26/2008 Project Number: 08003249 Inv: I Application Date: 8/26/2008 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: DIAMOND ROCK Address: 2602 N SULLIVAN SPOKANE VALLEY WA 99216 Description Grp Type Notes 1&2 FAMILY R-3 VB BASEMENT U R-3 VB GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Contractor: Address: Building Permit Firm: DIAMOND ROCK CONSTRUCTIO Phone: (509) 924-8964 This Application: Total Project: Su Ft Valuation Su Ft Valuation 1,373 $130,421.27 1,373 $130,421.27 1,373 $20,595.00 1,373 $20,595.00 393 $7,467.00 393 $7,467.00 Totals: 3,139 $158,483.27 3,139 $158,483.27 Units Unit Desc COMFORT CENTRAL HEATING PO BOX 28924 SPOKANE WA 99228 Item Description DUCT SYSTEMS GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS CLOTHES DRYER HOOD -TYPE II SELECT SELECT SELECT Fee Amount $1,324.15 $4.50 $529.66 Permit Total Fees: $1,858.31 Mechanical Permit Firm: COMFORT CENTRAL HEATING Units 1 1 1 2 3 1 1 Operator: jmm Printed By: JD Phone: Unit Desc NUMBER OF NUMBER OF NUMBER OF # OF UNITS NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: (509) 216-1223 Print Date: Fee Amount $10.00 $10.00 $12.00 $2.00 $30.00 $10.00 $10.00 $84.00 8/26/2008 Project Number: 08003249 Inv: 1 Application Date: 8/26/2008 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: MIKE & SONS PLUMBING Address: 8521 E KNOX AVE SPOKANE WA 99212 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS CLOTHES WASHER MISCELLANEOUS FIXTURES Notes: Plumbing Permit Units 2 4 2 1 1 2 Page 3 of 3 Finn: MIKE & SONS PLUMBING Phone: (509) 362-2362 Unit Desc NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Fee Amount $12.00 $24.00 $12.00 $6.00 $6.00 $12.00 FLORA ESTATES -REFER TO ADE -19-06 FOR LOT WIDTH/FRONTAGE-MH FLORA ESTATES -SEE FILE ADE -19-06 FOR LOT FRINTAGE/WIDTH-MH Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount Invoice Amount $1,858.31 $1,858.31 $84.00 $84.00 $72.00 $72.00 Amount Paid $0.00 $0.00 $0.00 $72.00 Amount Owing $1,858.31 $84.00 $72.00 $2,014.31 $2,014.31 $0.00 $2,014.31 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 8/26/2008 Permit CjtCi 11707 0 Sprague Ave, Suite 14 Spohane Valley, WA 992(011'1' (509)688-0036 FAX: (509)30L -l--0 Community Development v, ww.spokancvallcy.org_.cont Residentia-A Cantiructlioicil 2.)ennit Appikadun /cwt q U?, - VALLEY PERMIT NUMBER: PERMIT FEE: Mew Collygtructkim AddtttundRemodell LI Other.' AccemcNry RUH i=1 Deck SITE ADDRESS CM/ M Car...LA Or ASSESSORS PARCEL NO: LEGAL DESCRIPTION: L©� z_ Ficr4 Ate4 wilding oilraer- - .,.- _._ Name: 0;4rvuzytt) go 4. C % • Address: Von Ai. S ti col City: Spa L0,14 V Fax: Zip: 9 j I, Phone:4„tt Fax: 9ze-ntli Contact Person Name: au] Phone: •-41.. Describe the scope of work in detail: 13v,' Id a ii.&t,/ Pie CObtrOtOt-- .,.- Name: 1)/-4.0.14r,4 &c k CdS 7`; Address: 2Mu FLOOR SQ. FTG: City: Zip: Phone: Fax: LicNo: -xp. Da e: City Business Lic No: CONSTRUCTION TYPE: Mu/ Cost of Project: 70 air) **************The followingMUST be complete: (write N/A if not a licable ********************** HEIGHT TO PEAK:i 17 DIMENSIONS: 5D X 4/0i . # OF STORIES: TOTAL HABITABLE SPACE: Z -6-77:r 27Y-4 MAIN FLOOR TO SQ. FTG: t 2Mu FLOOR SQ. FTG: UNFIN BASEMENT SQ, FTG: ta-31" /3 7,3 IMPERVIOUS SURFACE AREA: FINISHED BASEMENT BASEMENT SQ. FTG: „0C GARAGE SQ. FTG: . 3- 7. 5 - .313 DECK/COV. PATIO SQ. FTG: 30% SLOPES ON , PROPERTY: 04 # OF BEDROOMS: 3 CONSTRUCTION TYPE: Mu/ HEAT SOURCE: Alatw-4, 6s Furnace SEWER OR SEPTIC? DISCLAIMER The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application c be processed. Signature Date? --/Z41/6171 Method of Payment: (Faxed permit applications will only be accepted with major bankcard) 0 Cash Check rj Mastercard 0 VISA Bankcard Expires: Vi Authorized Signature: REVISED 8/25/2005 LI Cttitis' 72- 11707 1 a<_aw Ave. S. ; 0', :03; Spokane Valley, WA 9)206 (509)688-0036 FAN: (50))MS-007,7 Community 1X...velopment alley on: l'sAlechani;call fienrnk AppEication sliTE ADDREss IY Z1 it/. aNpz, A Or: D COM PERMIT NUMBER: PERMIT FEE: tuildino o • ...___ . ._ __._ Name: Dies n4.0". t svi f Phone: q 2 v7ij cLc-/ _goc, Address: City State Zip . Contractor ......_ Name: 0 4 NO i Address: _ Phone: Fax: City State Zi License No: City Business Liccnse No: Contact Namc: G4, ( Phone: - 4/ DESCRIPTION OF WORK # OF UNITS X COST = TOTAL AMOUNT FUEL BURNING APPLIANCE Equ I to or less than 100,000 1 X $12.00 /0 FUEL BURNING APPLIANCE More than 100,000 X $15.00 = UNLISTED APPLIANCE Additional Fee E.ual to or less than 400,000 X $50.00 = fl UNLISTED APPLIANCE (Additional Fee) More than 400,000 Mil $100.00 USED APPLIANCE (WSEC min. AFUE rating) Equal to or less than 400,000 0$50.00 USED APPLIANCE SEC min. AFUE ratin. More than 400,000 EN 11.11 .1. II.III $100.00 $12.00 $20.00 $25.00 $35.00 $60.00 $10.00 IN III = BOILER/REFRIGERATION BOILER/REFRIGERATION 1 - 100M BTU 101 - 500M BTU NIIIIMI." 501 - 1,000M BTU 9 BOILER/REFRIGERATION 10 BOILER/REFRIGERATION BOILER/REFRIGERATION 1,001 - 1,750M BTU More than 1,750M BTU GAS LOG, GAS INSERT, GAS FIREPLACE RANGE $10.00 II DRYER 11111111•11111111 $10.00 $10.00 co FUEL BURNING WATER HEATER MISC. FUEL BURNING APPLIANCE 1111 $10.00 GAS PIPING (each outlet DUCT SYSTEMS $1,00 $10.00 7- - lo VENTILATING FANS $10.00 3o AIR HANDLER DOES NOT include ductin ) Equal to or less than 10,000 CFM $12.00 AIR HANDLER DOES NOT include ductin. EVAPORATIVE COOLERS TYPE 1 HOOD Greater than 10,000 CFM 1.11111.1111111MINNIMMNI. $15.00 $10•00 $50.00 = II TYPE II HOOD 111111 HEAT PUMP/AIR CONDITIONER 0-3 TON $12.00 Is 26 AIR CONDITIONER 3-15 TON 'NUMMI."' $20.00 El= AIR CONDITIONER 15-30 TON 111 $25.00 EI AIR CONDITIONER 30-50 TON $35.00 $60.00 $10.00 ii El = 29 AIR CONDITIONER More than 50 TON 30 LPG STORAGE TANK 31 WOOD OR PELLET STOVE/INSERT 11111 $10.00 = 32 WOOD STOVE - FREE STANDING $25.00 III REPAIR & ADDITIONS Will MI Inn $15.00 $12.00 $12.00 $19.00 $22.00 I VENTILATION SYSTEMS 35 VENTILATION MECHANICAL EXHAUST _ 6 INCINERATOR - RESIDENCE 37 INCINERATOR - COMMERCIAL METHOD OF PAYMENT: DATE: OCASF-I 0 CHECK 0 VISA []MC E XPIRES: CARD# SUBTOTAL V - S35.00_,_ PROCESSING FEE ._ TOTAL PERMIT FEE DUE: AUTHORIZED SIGNATURE: REVISED h;.7 6Th 5 ' • a I ICY Community Development rkitigtg Pennq S ADINIEss PC11111t. 1707 rjdIc A\ C. ..';11‘1',' 10(.• SpOkalle Valley. WA 0I)201.') (50))0SS-0036 FAX- (.5n9K,ss-1)03-/ V\\ !,nokancv:itic, pplica .71 Cszikix 0.n Cci; oxr.r.a it' a a PERMYI NUMBER: PERMIT FEE: HudinJL DESCRIPTION OF WORK # OF UNITS X Name: -). GCkt— . Phone: qzy-vi_ 4 ei Fax Ci-Zt —5-Q q q -_—__L. _ _ .44.__.• — — Address: WATER CLOSET, BIDETS City State Zip Contractor 11- 2 —_—_, --. NarreLtd 4'ffw...1._._ Phone: Fax: Address: TUBS City StateZi X X License No: =/ City Business License No: 4 SHOWERS (PER TRAP) Contact 5 SINKS LAVS/BASINS, BAR, FLOOR, KITCHEN, LAUNDRY, UTILITY, JANITOR, PHOTO, X-RAY, FOOD, PREP/CULINARY MEAT Name: Phone: $6.00 -141 AUTHORIZED SIGNATURE: REVISED DESCRIPTION OF WORK # OF UNITS X COST = TOTAL AMOUNT 1 TOILETS WATER CLOSET, BIDETS 2- X $6.00 = 11- 2 URINALS X $6.00 = 3 TUBS X X $6.00 $6.00 =/ t 4 SHOWERS (PER TRAP) BATH, STALL, ON-SITE BUILT 5 SINKS LAVS/BASINS, BAR, FLOOR, KITCHEN, LAUNDRY, UTILITY, JANITOR, PHOTO, X-RAY, FOOD, PREP/CULINARY MEAT X $6.00 -141 6 DISHWASHER -1 X $6,00 . 7 CLOTHES WASHER I X $6.00 = _ GP 8 GARBAGE DISPOSAL X $6.00 = 9 WATER SOFTENER X $6.00 = _ 10 ELECTRIC HOT WATER TANK NOTE: IF GAS, SEE MECHANICAL X $6.00 = 11 FLOOR DRAINS AREA, CASE, COIL, TRENCH, CONDENSATE X $6.00 = 12 ROOF DRAINS/OVERFLOW DRAINS X $6.00 = 13 FOUNTAINS, DRINKING X $6.00 = 14 WATER PIPING/DRAIN-IN WASTE, VENT, PLUMBING, REVERSAL NSTALLATION, ALTERATION, REPAIR, REVERSALS X $6.00 = 15 SEWAGE EJECTOR GRINDER, SUMP PUMP X $6.00 = 16 WATER USING DEVICE ICE AN/OR COFFEE MAKER, HOSE BIB, STEAMER PROOFER, CARBONATOR, SWAMP COOLER X $6,00 = i 7, 17 CROSS CONNECTION DEVICE VACUUM BREAKER, CHECK VALVE, AND R.P.B.P.D. FOR: VATS, TANKS, BOILERS X $6.00 = 18 INTERCEPTORS GREASE TRAP, SAND TRAP, CHEMICAL HOLDING TANK X $6.00 = 19 MEDICAL GAS (per outlet) NITROUS, OXYGEN X $6.00 . 20 MISCELLANEOUS PLUMBING FIXTURE X $6.00 = 21 PRIVATE SEWAGE DISPOSAUSYS X $20.00 = 22 INDUSTRIAL WASTE INTERCEPTOR X $15.00 = METHOD OF PAYMENT: 0 CASH 0 CHECK DATE: SUBTOTAL 71 0 VISA 0 MASTERCARD PROCESSING FEE $35.00 EXPIRES: TOTAL PERMIT FEE DUE: AUTHORIZED SIGNATURE: REVISED Spok'axe Valley® For City Use Only PLUS Project Number g '732-99 Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 J I co g Sl s APPROVED BY Scat " = 5 Loi-lt 31KZ Flora wte&doc.1S 1921 N, Coach Dr. Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project 0 Previous pre -app meeting 0 Plan revisions 0 Transmittal Date: Tuesday, August 19, 2008 Site Address: 1921 N COACH DR Project Number: 08003249 Parcel Number: 55073.2819 Zoning: R-3 Water District: CONSOLIDATED ID #19 Fire District: FD 01 Applicant: DIAMOND ROCK CONSTRUCTION 2602 N SULLIVAN RD SPOKANE VALLEY, WA 99216 (509) 924-8964 e-mail: Contact: DIAMOND ROCK CONSTRUCTION 2602 N SULLIVAN RD SPOKANE VALLEY, WA 99216 (509) 924-8964 e-mail: Owner: DIAMOND ROCK CONSTRUCTION 2602 N SULLIVAN RD SPOKANE VALLEY, WA 99216 e-mail: Occupant: e-mail: Contractor: DIAMOND ROCK CONSTRUCTION Arch I Engineer: 2602 N SULLIVAN SPOKANE VALLEY WA 99216 (509) 924-8964 e-mail: 11 Project NEW SFR SEWER Description: Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION CONSTRUCTION PLAN SITE PLAN TD Please send all plan review and project comments via e-mail to the highlighted individuals.