2015, 02-24 Permit App: APR-2015-0015 ApproachCommunity Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
permitcenter@spokanevalley. org
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APPROACH PERMIT APPLICATION
PROJECT ADDRESS:
START DATE:
/5e/ S, d3.C.141//sh
-�seP/s
ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME: /3p (A, ,3)7 2 c
MAILING ADDRESS: , //) -25
CITY: VA/ ygral
CONTACT PERSON NAME: AO
STATE: tii» ZIP:
f?93S
f,IA(A,��%�,
PHONE: 5r.f 95) t/a FAX: CELL:
CONTRACTOR NAME:
MAILING ADDRE
CITY: r/E C
PHONE:
STATE: ZIP: 8-3 (O
CONTRACTOR LICENSE #:
FAX: CELL:
EXPIRES: CITY BUSINESS LICENSE #:
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway ❑ Commercial/Industrial Driveway
O Existing Curb & Gutter 0 Rural Road Section
❑ Culvert Installation
O Other Conditions:
0 Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved
before this application can be .rocessed.
Signature /'� / Date:
DE -001: V-1
FES
'9 P GG/5
Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
['Sidewalk
ft wide
ft from back of curb
['Streetside Swale
['Drainage Ditch
❑Drywell (show location on sketch)
['Other (please describe below)
DISTANCE FROM
NEAREST PROPERTY LINE
MAYBE LEFT OR RIGI-(T SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
CURB
1
THROAT WIDTH OFT4' -I•
WING (SEE TABLE) WING
STREET NAME
EDGE OF -/
ASPHALT
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
THROAT WIDTH nIFT -1
(SEE TABLE)
STREET NAM E
CURB
RETURN
IF CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
15' RADIUS RADIUS
RETURN
Ns_
CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
DE -001: V-1
Page 2 of 2
Residential Approaches
Commercial
Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured from centerline to centerline of
each approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line (@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
DE -001: V-1
Page 2 of 2