2014, 04-07 Permit: SW-14000329 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000329
Permit Issued Date: 04/07/2014
Expiration Date: 04/07/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
ROCKWELL
KALIN CONSTRUCTION
(509) 238-9469
Applicant:
Address:
Phone:
Email:
KALIN CONSTRUCTION
PO BOX 102
COLBERT, WA 99005
(509) 238-9469
SITE INFORMATION:
Site Address:
Parcel Number:
4611 N CALVIN RD
45022.2430
Owner:
Address:
Phone:
Assessor's Description: TRENTWOOD ORCH-THROOP & FITZPATRICK PT Email:
OF LTS 7&8 BLK 4; LT7 EXC BEG AT MOST NLY
COR TH SELY ON NELY LN 72.1' TH NWLY TO W
LN 15' S OF POB TH N TO POB; LT 8 BEG MOST
SLY COR TH NWLY ON SWLY LN 25' T
Inspection Area: : (509)-477-3675
Zoning:
GAGNIER, JEREMY & HEIDI
4611 N CALVIN RD
SPOKANE, WA 99216-1315
Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire
#3
Land Area: 5462.66 Square Feet
CONTRACTOR INFORMATION:
KALINE*0431B, Exp. 03/31/2015
KALIN EXCAVATION
9229 E WOOLARD RD COLBERT, WA 99005
509-954-9101
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 04/07/2014 14:08:29 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000329 Permit Issued Date: 04/07/2014
Expiration Date: 04/07/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/07/2014 14:08:29 Project Coordinator: Dawn Dompier