2012, 11-07 Permit: SW-12002525 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002525 Permit Issued Date: 11/07/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: SUMMERFIELD EAST Permit Type: SEWER Primary Contact: BOUCHER CONSTRUCTION LLC Applicant: BOUCHER CONSTRUCTION LLC Address: 10 N HARMONY RD GREENACRES, WA 99016 Phone: 509-953-3274 Email: SITE INFORMATION: Site Address: Parcel Number: 4905 N CALVIN RD 46353.1905 Subdivision: SUMMERFIELD EAST Assessor's Description: SUMMERFIELD EAST LT 5 BLK 1 Inspection Area: Owner: Address: Phone: Email: SVENDSEN, KEVIN 4905 N CALVIN RD SPOKANE VALLEY, WA 99216 Water District: Trentwood Fire District: Spokane Valley Fire Irrigation District #3 Zoning: Land Area: 10850 Square Feet CONTRACTOR INFORMATION: General Contractor BOUCHC*954P5 BOUCHER CONSTRUCTION LLC 10 N HARMONY RD GREENACRES, WA 99016 509-953-3274 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 11/07/2012 15:15:31 Printed by: IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002525 Permit Issued Date: 11/07/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/07/2012 15:15:31 Printed by: IIS APPPOOL\SmartGovProdApp