Loading...
2012, 10-10 Permit: SW-12002368 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002368 Permit Issued Date: 10/10/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: MR ROOTER PLUMBING INC Project Name: SUMMERFIELD EAST Applicant: MR ROOTER PLUMBING INC Permit Type: SEWER Address: PO BOX 3364 HAYDEN LAKE, ID 83835 Phone: 509-747-5006 Email: SITE INFORMATION: Site Address: Parcel Number: 5013 N CALVIN RD 46353.2102 Subdivision: SUMMERFIELD EAST Assessor's Description: SUMMERFIELD EAST LT 2 BLK 3 Inspection Area: Owner: GUSZREGAN, D J Address: 5013 N CALVIN RD SPOKANE, WA 99216-1484 Phone: Email: Water District: Trentwood Fire District: Spokane Valley Fire Irrigation District #3 Zoning: Land Area: 13362 Square Feet CONTRACTOR INFORMATION: General Contractor MRROOPI051J6 MR ROOTER PLUMBING INC PO BOX 3364 HAYDEN LAKE, ID 83835 509-747-5006 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Possible FEMA Flood Zone Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 10/10/2012 13:48:10 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT J Permit Issued Date: Application Number: SW -12002368 10/10/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/10/2012 13:48:10 Printed by: IIS APPPOOL\ASP.NET v4.0