1991, 12-12 Permit App: 91008575 Residence.i.. ,.11.11Y_ �F
SPOKANE COUNTY DEPARTMENT OF BUILDINGS
W. 1303 BROADWAY AVENUE
SPOKANE, WASHINGTON 99260
(509) 456-3675
I certify that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile said permit/application is true
and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE
provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified
herein or not. I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to
give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local
laws regulating construction.
SIGNATURE OF APPLICATION
OWNER OR AGENT DATE
PROJECTNUMBER= 91008575
APPLICATION DwTF.i 12/12/91 PAGE::: ,::ri
****** THIS IS NOT A PERMIT tie**ri•**
PENALTIES WIL..i... BE:: ASSESSED FOR COMMENCING, WORK WITHOUT A PERMIT
SITE STREET= 314 S CALVIN LN F'ARCF L. »: =: 23542-9075
ADDRESS= SPOKANE. WA 992.06
PERMIT USE= RESIDENCE .... NATUR'A1.. GAS
PLAT;I:= 005028 PLAT NAME= CHERRY GROVE
B J ,;K:.. 1 „OT=.. '? '.ON U._11 - i ' 1 4_.. F
HREA=:: I./Am: F WIDTH= 51 tI-.C' H= 82 R/W::::
4 OF PI_DGS::= :w DWELLINGS= i WATER DIST :
OWNER= GORDON FINCH HOMES INC
STREET=:: 9102 E COLUMBIA DR
ADDRESS= SPOKANE WA 99212
PHONE= 509 926 r0''rr
CONTACT NAME= GORDON FINCH PHONE NUMBER= 509 926 r 1: 1 3
LtI._IIL.I`DING SETBACKS: FRONT= 20 I...EFT:=: 5 RIGHT= 5 REAR= •15
:ni•*tii}(1'i*****************b:******* REVIEW INFORMATION *tii•*..•'n:*tip;*:. *****•***•***•**r:
DEPARTMENT REVIEW COMMENTS APPROVAL COMMENTS
BUILDING PLAN F:EV REVIEW REQUIRED....�%Z'�! .". �.__�...� _ ...
BUILDING SETBACK REVIEW REQUIRED ...P -0R y.._ ...__'..�L/��j.__...._..__...._......
ENGINEER APPROACH/FLOOD PLAIN/DRAINAGE 10:771e2, It ULA`"\ - 2/1
*•*•*******tit•***•H:*******•**tii•******* BUILDING PERMIT *•* •**...**.*....*****•p:*******•***•*
CONTRACTOR= GORDON FINCH HOMES INC PHONE= 509 926 701
STREET== 9102 E COLUMBIA DR
ADDRESS= SPOKANE WA 99212
NEW= X REMODEL= ADDITION=:: CHANGE" OF USE=
DWELL UNITS= 1 OCCUP, LD= BLDG HGT- STORIES=
BLDG W X D ::= X SQ FT= 1470 EPRINKL.ER=:: N
REQ PARKING== : HANDICAP= CRITICAL MAT== N
*********************•N:*****til•*** MECHANICAL. PERMIT ***********•. ****•**********
CONTRACTOR:::: RR HEATING &AIR COND INC
STREET= 1723 E FRANCIS AVE
ADDRESS= SPOKANE WA 99207
PHONE= 509 484 1405
x* **; *:* **•*•***•tic**•**•***:**•** -3 F'L..l.lM%INr; PERMIT **.*•***•*•*tip******* t•****p:*******
CONTRACTOR= GOLD SEA!_. MECHANICAL... INC
STREET= '� 524 E:: BOONE AVE.
ADDRESS= SPOKANE:: 14i 99212
PROCESSED BY: WE::NDEL.., GLORIA
PRINTED BY: WENDEI..., GLORIA
3i•**ii•**3**•)i•******•*•**.****ti•:*********
THANK YOU
PHONE= 509 535 5944
Hi* tic*•* 3***•*3****•*****•***it *3*3*•ki•*•A: a•3*k..*
Bloc E 1 Cr
CA 1V ,
Gbrr.l ►, Fin e►,
9a 1.--70)3
S• « ri /t r
rp
3iy
*VP,'
L,, A N e
(1 c
THEE PLANS HAVE BEEN REVIEWED
RA -too SY sr-
BY
TBY '61 , (
ON (2-2-0 (2-2 o -moi(
oe
1
Radon Vent
•
"' . .
garage
•
•
•
•
•
basement
ANNIMMI
•
•
•
1
•
•
lb
•
•
tuiIitr Lor�oralioa
�o �« sooko�� �a
Phone 509 926-6217 Fax 509 928-8689
Legend For Radon mitigation system
-perforated pipe beneath slab
C solid 9'ABS stack vent pipe
RADON SYSTEM SPECIFICATIONS ATT
S5-) 5
RADON MITIGATION SYSTEM
This radon mitigation system is
designed only for the specific) Job -
site address designated. The system
is not guaranteed unless installed
by Cavalier Corporation
Jab Site oddrow 3l 4 S Calvin
builder
Sq Ft 1 500
y
WarrenDate
Environmental Protection Rgerioy+ RCP 110044
�Iatrnlir Cttgineerittg
._._
radon services
E. 8620 44th a
Spokane, WA 99206
Phone (509) 926-6217 FAX (509) 928-8689
RADON SYSTEM SPECIFICATIONS, SPOKANE COUNTY:
1. Perforated pipe shall be installed within the native soil
or fill (sand, gravel or soil) at a minimum depth of 1"
below the intended slab.
2. The pipe shall be a minimum diameter of 4". meet AASHTO
M252, have perforations no wider than 1/16" and have a
minimum of 2.5 square inches of total perforations per
linear foot of pipe.
3. There shall be a minimum of 10 linear feet of perforated
pipe per hundred square feet of slab floor space.
4. The pipe shall be laid in a continuous loop. connected at
both ends to the solid stack vent pipe.
5. Any slab area, which is larger than 10 square feet, which
is isolated from other slab areas by footings or other
barriers, shall have a perforated pipe installed to the
above specifications. (The pipe can be a single length
rather than a connected loop if the area is too small or
narrow to accomodate a connected loop.)
6. A stack vent of ABS, schedule 40, minimum size 4", shall
be connected to the sub -slab piping and proceed upwards
to an exit location on the roof. and extending 14" above
the roof. The pipe shall be Labeled "radon vent" every
16" or less for its full length. The pipe's attic
location shall allow a minimum of 4' of head room. When-
ever possible this exit location shall be on the backside
of the roof.
7. Any elbows in the stack vent piping shall have a
centerline radius minimum of 1.5 by pipe width.
8. An inline centrifugal fan, minimum 114 cfm @ 3/8" W.C.,
UL listed, manufactured specifically for radon mitigation,
maximum sone level 2.8, shall be installed in the exhaust
Iine, in the attic.
9. Couplings to connect the vent piping to the fan shall be
elastomeric PVC, Fernco series 1056 or equal.
10. The fan shall be hard -wired and the breaker Iabeled "radon
fan".
11. All penetrations and joints in the concrete floor slab
below grade shall be sealed with caulk or grout.
12. A notice shall be permanently attached to the electrical
panel advising the owner or occupant about the radon
system and that he/she shall test the home for radon
annually. The notice shall include Cavalier's name and
phone number.
13. All craftsmanship shall be of high quality.