Loading...
2010, 12-20 Permit App: 10004059 ResidenceProject Number: 10004059 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: STRAHL CONSTRUCTION, INC. Address: 3611 N. CALISPEL C - S - Z: SPOKANE, WA 99205 Setbacks: Front Left: Right: Rear: Phone: (509) 951-1903 Group Name: Project Name: Site Information: Plat Key: Name: Range Date: 12/20/2010 Page 1 of 3 District: East Parcel Number: 45232.1720 Block: SiteAddress: 411 S CALVIN LN Location:: CSV Zoning: R-3 SF Res District Water District: 010 VERA Area: 5,646 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: STRAHL CONSTRUCTION INC Address: 3611 N CALISPEL ST SPOKANE, WA 99205 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 12/20/2010 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Sewer Review Permits: Originally Released: 12/16/2010 By: kkendall Released By: Originally Released: 12/20/2010 By: JLMain Operator: JD Printed By: jmm Print Date: 12/20/2010 Project Number: 10004059 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/20/2010 Page 2 of 3 Contractor: Address: STRAHL CONSTRUCTION, INC 3611 N CALISPEL ST SPOKANE, WA 99205 Description Grp Ing Notes 1&2 FAMILY R-3 VB BASEMENT F R-3 VB BASEMENT U R-3 VB DECK OPEN R-3 VB GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Contractor: Address: Building Permit Firm: STRAHL CONSTRUCTION Phone: (509) 328-7919 This Application: Total Project: Sq Ft Valuation Sa Ft Valuation 2,129 $210,664.55 2,129 $210,664.55 1,323 $26,460.00 1,323 $26,460.00 777 $11,655.00 777 $11,655.00 156 $2,340.00 156 $2,340.00 560 $10,640.00 560 $10,640.00 Totals: 4,945 $261,759.55 4,945 $261,759.55 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT STRAHL CONSTRUCTION, INC 3611 N CALISPEL ST SPOKANE, WA 99205 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING HEAT PUMP OR A/C 0-3 TONS VENTILATING FANS 1 DUCT GAS LOG OR GAS INSERT HOOD -TYPE II Permit Total Fees: Mechanical Permit Fee Amount $1,900.95 $4.50 $760.38 $2,665.83 Firm: STRAHL CONSTRUCTION Phone: (509) 328-7919 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 3 # OF UNITS 1 NUMBER OF 4 NUMBER OF 1 NUMBER OF 1 NUMBER OF Operator: JD Printed By: jmm Permit Total Fees: Fee Amount $11.00 $13.00 $3.00 $13.00 $44.00 $11.00 $11.00 $106.00 Print Date: 12/20/2010 Project Number: 10004059 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/20/2010 Contractor: Address: STRAHL CONSTRUCTION, INC 3611 N CALISPEL ST SPOKANE, WA 99205 Item Description TOILETSBIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER MISCELLANEOUS FIXTURES Notes: Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Plumbing Permit Page 3 of 3 Firm: STRAHL CONSTRUCTION Phone: (509) 328-7919 Units Unit Desc 3 NUMBER OF 6 NUMBER OF 3 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF Permit Total Fees: Fee Amount Invoice Amount $2,665.83 $2,665.83 $106.00 $106.00 $108.00 $108.00 Fee Amount $18.00 $36.00 $18.00 $6.00 $6.00 $6.00 $18.00 Amount Paid $753.66 $0.00 $0.00 $108.00 Amount Owing $1,912.17 $106.00 $108.00 $2,879.83 $2,879.83 $753.66 $2,126.17 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 12/20/2010 Spokane 40•0Valley CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcentei@spokane.valley.org PERMIT NUMBER: PERMIT FEE: (Staff Use Only) iDEC N ii l i e -__- Suhriti ai RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ® NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ DECK 0 OTHER SITE ADDRESS: 411 S. CALVIN LN. ASSESSORS PARCEL NO.: 45232.1720 LEGAL DESCRIPTION: BLOCK 1 LOT 20 BUILDING OWNER NAME: NAME: STRAHL CONSTRUCTION, INC. ADDRESS: 3611 N. CALISPEL ST. CITY: SPOKANE STATE: WA ZIP: 99205 PHONE: 328-7919 FAX: 328-7919 CELL: 951-1903 CONTACT NAME: JASON PHONE: 951-1903 Fax: 328-7919 CELL: 951-1903 CONTRACTOR NAME: STRAHL CONSTRUCTION, INC. MAILING ADDRESS: 3611 N. CALISPEL ST. CITY: SPOKANE STATE: WA ZIP: 99205 PHONE: 328-7919 CONTRACTOR LICENSE No.: STRAHCI969LD NO.: FAX: 328-7919 CELL: 951-1903 EXPIRES: 6/4/12 CITY BUSINESS LICENSE DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: NEW CONSTRUCTION OF A SINGLE FAMILY HOME. PROPOSED USE: HOUSE , SINGLE FAMILY Fffartiva nrtnhar 752 7nn7 Dana 1 of ****YOU MUST COMPLETE THE FOLLOWING**** MARK N A IF N • T APPLICABLE No. of Stories: 1 Height to Peak: 20 Dimensions:44' x68' 49- 4,5". Total Habitable Space:4272 Main Floor SQ FT: 24; Upper Floor SQ FT: N/A Garage SQ FTzbet Deck/ overed Patio SQ FT: /5G Unfinished Basement SQ FT:783 7 7 7 mpervious Surface Area: N/A Finished Basement SQ FT: 1232'(3 23 30% Slopes on Property: N/A No. of Bedrooms:4 Construction Type: WOOD FRAME Heat Source: GAS FORCED AIR Sewer or Septic: SEWER TOTAL COST OF PROJECT: $200,000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature AH -k( %in ,Ph Q ) 14 tm Method of payment: ['Cash ❑ Check Bankcard #: Date: 1 2 - t7 ❑ Visa ❑ Mastercard EXP: VIN#: Authorized Signature: Permit Center 11703 E Sprague Ave, Suite B-3 riA` Spokane Valley, WA 99206 ' j Vatter (509)688-0036 FAX: (509)688-0037 Community Development m"`_._ ',,,,I Mechanical Permit Application PERMIT NUMBER: PERMIT FEE: ❑ Commercial ® Residential SITE ADDRESS: 1 /) 3 • am....v 14 L. ki . Building Owner Name: Phone: Fax: Address: City: State: Zip: Contractor Name: Strahl Constriction, Inc. Phone: 328-7919 Fax: 328-7919 Address: 3611 N. Calispel St. City: Spokane State: WA Zip: 99205 License No: STRAHCI969LD City Business Lic: Contact/Project Manager: Name: Jason Strahl Phone: 951-1903 ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE C:\Users\Heather\Documents\Strahl Construction, Inc. Forms\Permit Forms\MechanicalPermitApplication040309.doc VIN: #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU 1 FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON 1 AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER 1 GAS PIPING SYSTEM (each outlet) 3 GAS LOG, FIREPLACE, & GAS INSERT 1 APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100,000 BTU or Tess BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 -15 hp —100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp —1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 dm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 4 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Instalkaion or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type 1 HOOD Type II 1 L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE C:\Users\Heather\Documents\Strahl Construction, Inc. Forms\Permit Forms\MechanicalPermitApplication040309.doc VIN: Spokane 41 . Valley Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 t116'. ,,1 Community Development Plumbing Permit Application PERMIT NUMBER: PERMIT FEE: ❑ Commercial ® Residential SITE ADDRESS: 4411 3• (`, Lv I AJ LN • Building Owner Name: Phone: Fax: Address: City: State: Zip: Contractor Name: Strahl Construction, Inc. Phone: 328-7919 Fax: 328-7919 Address: 3611 N. Calispel St. City: Spokane State: WA Zip: 99205 License No: STRAHCI969LD City Business Lic: Contact/Project Manager: Name: Jason Strahl Phone: 951-1903 # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 3 URINALS TUBS 3 SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Uldily, Janitor, Photo, X-ray, Food, Prep/Culinary Meat 6 DISHWASHER t CLOTHES WASHER t GARBAGE DISPOSAL t WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer prooter, carbonator, swamp cooler 3 PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER It Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent ling ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑ CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT: http c;,_:v spokane, a;!ey or under the quick links for Forms, Master Fee Schedule. Spokane jUalley° For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. D Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE —APPLICANT PINK— BUILDING FILE REV 9/07 ..9 3 RECEIVED CSV PERMIT CENTER DEC 1 5 2010 Project # U) = O IName Submittal # -.9 -9 00 1411 S • Ca.JIN W. w