2013, 04-19 Energy Compliance CertInspector Copy
Property
Conditioned
Builder
Strahl Construction,
Address: _, Spokane Valley, WA
Noor Ar, 2554 Date 04 / 19 / 2013
or registered design professional :
Inc H-owc.e Einer, Aw Lt Yeah
stnature:
Ceiling:
Walls_
Below.
Below_
NFRC rating
Defaultrating
Lille 'grown 50 280 O321_
R-.
Vaulted R=- Floors Over unconditioned space R- 30
Attic R- 50 _ j Slab on grade floor R -
Above grade R- 21 Doors metal R- 5.3
int_ R- R-
ext. R- 21 R
U -Factors andSHGC:
(or) Windows U- .30 SHGC- .32
(.Chapter 10 VICE!OO?) Skylights LT- SHCIC -
ter -9 n(HVAC Total C.bpL: 9 [ tll v
Hating,Cool &-DomesticHot Water
m
Type
Effidency
Heating
Gas forced air condensing
QS" 2d
cooling
Electric central
I3 Scck
DHW
Gas yo gal
All ducts
Test Method;
Test Target
Building air
System' type:
pact A-Oalitift Air Ler e
& HVAC in conditioned space ( - - no . Insulation
Tota! Ieak(ve Leakage to exrterior Air- handler
R- 5
present.
CFM{r4.25Pa
.OUB 7.2.-
CFM(4).2SPa Test Result
leakage target: SLA 0.00030 - Tested leakage: SLA=
- OnsiteRenewable Energy Elect,* Power Symms.
Rated annual generation
Kwh