Loading...
2012, 03-28 Permit: SW-12000002 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12-000002 Permit Issued Date: 03/27/2012 Expiration Date: 03/28/2012 Project Description: Permit Type: SEWER CONNECTION SEWER Primary Contact: Applicant: Address: Phone: Email: STRAHL CONSTRUCTION INC STRAHL CONSTRUCTION INC 3611 N CALSIPEL ST SPOKANE, WA 99205 509-328-7919 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 422 S CALVIN LN 45232.1805 SP -118-79 MANOS VALLEY ESTATES PUD LT 5 BLK 2 (AFN# 5613158) Water District: Vera Irrigation District #15 Owner: Address: Phone: Email: CONTRACTOR INFORMATION. General Contractor BOB LONG PO BOX 305 VALLEYFORD, WA 99036 509-951-1903 STRAHL CONSTRUCTION INC 3611 N CALISPEL ST SPOKANE, WA 99205 509-328-7919 Fire District: Flre District 1 Land Area: 0.1231 acres l 5363-sgfL_.-- _-- -- _ ------__. __.-- ^A 6icl-IZ-ZYO/Z11i '. 1 DETAILS; Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 FEE DETAIL; Processing - Utilities Utilities Permit $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FORA 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 03/27/2012 10:01:57 Printed by: IIS APPPOOLVISP.NET v4.0 TOOPI 'DOTS 00 HNVHOdS 86TLLLi' 'Ng Lo:TT ZTOZ/L2/£0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12-000002 03/27/2012 Expiration Date: 03/28/2012 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/27/2012 10:01:57 Printed by: IIS APPPOOLWSP.NET v4.0