Loading...
2011, 11-07 Permit: 11005815 SewerSPoo CoUKrY Site Information SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 J Project Information Site Address: 1009 S CALVIN RD Parcel Number: 45233.1407 Subdivision: HELSTROMS SUB #3 VERA Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: AILEEN JONES TRUST Address: 1009 S CALVIN RD SPOKANE, WA 99206 Building Inspector: None Water Dist: Project Number: 11005815 Inv: Permit Use: SEWER CONNECTION Applicant: KALIN EXCAVATION 9229 E WOOLARD RD COLBERT, WA 99003 Contact: KALIN EXCAVATION 9229 E WOOLARD RD COLBERT, WA 99003 Setbacks - Front: Left: Group Name: Project Name: 1 Issue Date: 11/7/2011 Phone: (509) 238-9437 Phone: (509) 238-9437 Right: Rear: Permits Sewer Connection Permit Contractor: KALIN EXCAVATION License #: KALINE*0431B SEWER CONNECTION 1 $125.00 PROCESSING FEE 1 $25.00 Total Permit Fee: $150.00 **FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. **INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. **SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. **THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. **CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Payment Summary Total Fees AmountPaid AmountOwing $150.00 $150.00 $0.00 Tran Date Receipt # Payment Amt 11/7/2011 5120 $150.00 Processed By: SHATTO, JULIE Printed By: Force, Faith Page 1 of 1 PERMIT NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zon- ing regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - all permits - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final ap- proval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - foundation inspections prior to pouring pads, inspection of blocking/tie-downs, when completed per manufacturers installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINS Tag(s) must be affixed to the home, completed inspection record card and manufacturer's installation instructions must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TC' INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . :ARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections -Department of Building & Planning 477-3675 • Construction in a flood plain - Division of Engineering & Roads 477- 3600 • Electrical wiring - State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways - Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 • Sewer connection, Division of Utilities- 477-3604 or City Pub- lic Works Department 625-6300 • Asbestos, Renovations, and Demolitions - Spokane Regional Clean Air Agency 477-4727 PERMIT EXPIRATION & EXTENSION Building permits shall automatically expire and become invalid by limitation of time three (3) years from the date of permit issuance. Other permits not issued in conjunction with the construction or completion of a building or structure shall automatically expire and become invalid by limitation of time 18 months from the date of permit issuance. The Director is authorized within his/her discretion to grant one (1) extension of time, for a period not to exceed 180 days. A request for an extension shall be made by the permit holder in writing and shall be submitted to and received by the Spokane County Building and Planning Department prior to the expiration date of the permit and shall demonstrate just cause for the requested extension. REFUNDS The building official may authorize refunding: (1) Any fee paid which was erroneously paid or collected; or, (2) Not more than 80% of a permit fee paid when no work has been done under the permit; or, (3) Not more than 80% of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done; or, (4) Any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment. Please note that application processing fees are nonrefundable unless the application was erroneously processed. MISTAKE? If you think we've made an error in processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at: Spokane County Department of Building & Planning 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 REVISED 12/10 BLDG PERMIT