2008, 03-07 Permit App: 08000602 Pole BuildingProject Number: 08000602 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 24 X 40 POLE BLDG Contact: SPOKANE POST FRAME
Address: 7001 E 2ND
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 926-0865
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
Date: 3/7/2008 Page 1 of 2
District: East
Parcel Number: 45021.0806 Block:
SiteAddress: 4615 N BURNS RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 001 TRENTWOOD
Lot:
Owner: Name: GODIN, MARILYN J
Address: PO BOX 1025
VERADALE, WA 99037 -
Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Septic Sys Review
Originally Released: 2/27/2008 By: tmelbourn
Released By:
no conflict - dry bldg only.
Originally Released: 2/29/2008 By: PWARNE
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 2/29/2008 By: cjjanssen
Operator: JD Printed By: JD Print Date: 3/7/2008
Project Number: 08000602
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 3/7/2008 Page 2 of 2
Contractor: SPOKANE POST FRAME
Address: 7001 E 2ND AVE
SPOKANE, WA 99212
Building Height 14
Building Permit
Firm: SPOKANE POST FRAME
Phone: (509) 926-0865
Building Characteristics
Description Grp Type Notes
POLE BDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Notes:
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
960 $18,240.00 960 $18,240.00
Totals: 960 $18,240.00 960 $18,240.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$307.25
$76.81
$4.50
$388.56
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $388.56 $388.56 $0.00 $388.56
$388.56 $388.56 $0.00 $388.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information.
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD
Print Date: 3/7/2008
Permit Center
11707 E Sprague Ave, Suite 106
Spokane Valley, WA 99206
• (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction
Permit Application
PERMIT NUMBER: DCr 0
• PERMIT FEE:
❑ New Construction ❑ Accessory Bldg
❑ Addition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS: -1 co t i/A raA ; S clp 1�"'
/
ASSESSORS PARCEL NO: S 0 t , 0 Q l� LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS:
Name: rid__ U.4%1 �1�
TOTAL HABITABLE SPACE:
Address: 9. i s^ * «1A 5 (LO
2''7D FLOOR SQ. FTG:
City:p
Zip:
State'N4
Phone: ri ei _ col I Fax:
GARAGEQ. FTG:
'&U Or-
Contact Person ((�� r
Name: 4 9r� e' 1 ,AA.12/1_
Phone: <Tel. - 2(0-06Cec- 7/C -S780
Describe the scope of work in detail:
Contractor:
DIMENSIONS:
Name: t) PO)--F141riq.. L
TOTAL HABITABLE SPACE:
Address: l.E 2 -AM -1A
2''7D FLOOR SQ. FTG:
City: S 6 U 0 Q x State: 64,14 Zip
s 2
Phone: o s Cv c Fax:efig_v61
GARAGEQ. FTG:
'&U Or-
Cont> tir L�c_Nef:p Film g 4 �/7cp Date:,..', iv _ 0 8
30% SLOPES ON
PROPERTY:
City Business Lic. No:
CONST UCTIO TYPE:
Cost of Project: $ l Z oa a
avx�vR�o si--ef�G,�.,
Proposed Use:i �l V tt, ' -
**************The followin MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/'1'
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2''7D FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGEQ. FTG:
'&U Or-
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONST UCTIO TYPE:
HEAT SOURCE: 1
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their sighature that 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATUR
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15107
0 Check
❑ Mastercard
Expires:
DATE: '2 2`°
RECEIVE[) 3y
CITY OF SPOKANE \j I y
❑ VISA
VIN#:
FEB 2 6 200R
PER CEN -r r_ f.:
BY _--
Spokane
_.fl Valley
For City Use Only
PLUS Project Number 6/00(..) (302.—
Project Address L4(pl p„,t-t"',-i`_..
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
zJ�sl��
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE
REV 9/07
SPOKANE POST FRAME, INC.
Engineered Pole Buildings
Jeff Palmer
shops
garages
storage buildings
cabins
kits -cost plus
7001 1. 2nd Ave •
Spokane, WA 99212
509-926-0865 • Fax 509-924-5161
or 1-866-926-0865
Visit us at
www.spokanepostframe.com
Site Plan
9.10W
Horth
Show streets/alley
Show septic/sewer/dralnfleld
Show existing buildings
Show proposed building
Show setbacks - front, rear, sides.
Show lot size
ZONING CRITERIA — SPOKANE
JOB NAM
PHONE * 114 -(.r `7 r- 1
ADDRESS (a I N . % •414 --.<FS
LEGAL DESCRIPTION
L 3Th) t �(JTiV�
Phi Q.o7t
1 v r[1im - a k MT - �t
i
z1
s !foe
q
WD
QHE Pt
1 � Nit a.nd ._
le,
PLANNING DEPT APPROVED
B
DATE:.. a/ I08
:fly_
r c loser than 5' to property line - need firewall and parapet
)ut of rear 30' and closer than 5' - need waiver from neighbor
an't cover more than 503 of rear 25'
:orner lot - building must be 20' from property line
30' minimum setback from front property line
Less than 8' from residence - need firewall
r laximum square footage - 10% of lot area (Must be less than 3,000 sq. f t.)
lay not subdivide lot so that building Is more than 10% of residual lot area
;ounty
f closer than 5' to property line - need firewall
10' from septic/dralnfleld
Less than 6' from residence - need firewall
cEJ1ERAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK
11 ID KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE
‘LSO CHANGES WITH DIFFERENT ZONING.
'i' minimum side yard setback
minimum rear yard setback
1llnimum front and side street setback - 25' from -property line or 55' from
center of road - whichever Is areater
C9
CuO
RECEIVED BY
CITY OF SP0KA.NF \/ALLEY
FEB 2 6 2006
PERM !(11 CENTbh
BY.
41, I
Tc
14V
ai I
1
s' i ' s'
1
CI i,6r
1 1
140' Nkk,
1)
642.72
permanently, nor shall any structure of o temporary character be used as a residence.
No front yard of any lot shall be fenced along the front lot line nor bock to the bulldlrq set -bock line,
The grantor reserves the easement,rlght and privilege on a strip of lond six (6)feet in width along and parallel to
-the back tot Ilne of each 101 for telephone, gos, water, electric service and other utilities.
No lots in this addition will be sold until domestic water is mode available.
irsetuted of
Washington, this 2 day of `, �-r ,1957