Loading...
2008, 03-07 Permit App: 08000602 Pole BuildingProject Number: 08000602 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 24 X 40 POLE BLDG Contact: SPOKANE POST FRAME Address: 7001 E 2ND C - S - Z: SPOKANE, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 926-0865 Group Name: Site Information: Project Name: Plat Key: Name: Range Date: 3/7/2008 Page 1 of 2 District: East Parcel Number: 45021.0806 Block: SiteAddress: 4615 N BURNS RD Location:: CSV Zoning: R-3 SF Res District Water District: 001 TRENTWOOD Lot: Owner: Name: GODIN, MARILYN J Address: PO BOX 1025 VERADALE, WA 99037 - Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Septic Sys Review Originally Released: 2/27/2008 By: tmelbourn Released By: no conflict - dry bldg only. Originally Released: 2/29/2008 By: PWARNE Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 2/29/2008 By: cjjanssen Operator: JD Printed By: JD Print Date: 3/7/2008 Project Number: 08000602 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/7/2008 Page 2 of 2 Contractor: SPOKANE POST FRAME Address: 7001 E 2ND AVE SPOKANE, WA 99212 Building Height 14 Building Permit Firm: SPOKANE POST FRAME Phone: (509) 926-0865 Building Characteristics Description Grp Type Notes POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 960 $18,240.00 960 $18,240.00 Totals: 960 $18,240.00 960 $18,240.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $307.25 $76.81 $4.50 $388.56 Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $388.56 $388.56 $0.00 $388.56 $388.56 $388.56 $0.00 $388.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information. contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 3/7/2008 Permit Center 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 • (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction Permit Application PERMIT NUMBER: DCr 0 • PERMIT FEE: ❑ New Construction ❑ Accessory Bldg ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: -1 co t i/A raA ; S clp 1�"' / ASSESSORS PARCEL NO: S 0 t , 0 Q l� LEGAL DESCRIPTION: Building Owner: DIMENSIONS: Name: rid__ U.4%1 �1� TOTAL HABITABLE SPACE: Address: 9. i s^ * «1A 5 (LO 2''7D FLOOR SQ. FTG: City:p Zip: State'N4 Phone: ri ei _ col I Fax: GARAGEQ. FTG: '&U Or- Contact Person ((�� r Name: 4 9r� e' 1 ,AA.12/1_ Phone: <Tel. - 2(0-06Cec- 7/C -S780 Describe the scope of work in detail: Contractor: DIMENSIONS: Name: t) PO)--F141riq.. L TOTAL HABITABLE SPACE: Address: l.E 2 -AM -1A 2''7D FLOOR SQ. FTG: City: S 6 U 0 Q x State: 64,14 Zip s 2 Phone: o s Cv c Fax:efig_v61 GARAGEQ. FTG: '&U Or- Cont> tir L�c_Nef:p Film g 4 �/7cp Date:,..', iv _ 0 8 30% SLOPES ON PROPERTY: City Business Lic. No: CONST UCTIO TYPE: Cost of Project: $ l Z oa a avx�vR�o si--ef�G,�., Proposed Use:i �l V tt, ' - **************The followin MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: /'1' DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2''7D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGEQ. FTG: '&U Or- DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONST UCTIO TYPE: HEAT SOURCE: 1 SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their sighature that 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATUR Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15107 0 Check ❑ Mastercard Expires: DATE: '2 2`° RECEIVE[) 3y CITY OF SPOKANE \j I y ❑ VISA VIN#: FEB 2 6 200R PER CEN -r r_ f.: BY _-- Spokane _.fl Valley For City Use Only PLUS Project Number 6/00(..) (302.— Project Address L4(pl p„,t-t"',-i`_.. 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. zJ�sl�� Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 SPOKANE POST FRAME, INC. Engineered Pole Buildings Jeff Palmer shops garages storage buildings cabins kits -cost plus 7001 1. 2nd Ave • Spokane, WA 99212 509-926-0865 • Fax 509-924-5161 or 1-866-926-0865 Visit us at www.spokanepostframe.com Site Plan 9.10W Horth Show streets/alley Show septic/sewer/dralnfleld Show existing buildings Show proposed building Show setbacks - front, rear, sides. Show lot size ZONING CRITERIA — SPOKANE JOB NAM PHONE * 114 -(.r `7 r- 1 ADDRESS (a I N . % •414 --.<FS LEGAL DESCRIPTION L 3Th) t �(JTiV� Phi Q.o7t 1 v r[1im - a k MT - �t i z1 s !foe q WD QHE Pt 1 � Nit a.nd ._ le, PLANNING DEPT APPROVED B DATE:.. a/ I08 :fly_ r c loser than 5' to property line - need firewall and parapet )ut of rear 30' and closer than 5' - need waiver from neighbor an't cover more than 503 of rear 25' :orner lot - building must be 20' from property line 30' minimum setback from front property line Less than 8' from residence - need firewall r laximum square footage - 10% of lot area (Must be less than 3,000 sq. f t.) lay not subdivide lot so that building Is more than 10% of residual lot area ;ounty f closer than 5' to property line - need firewall 10' from septic/dralnfleld Less than 6' from residence - need firewall cEJ1ERAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK 11 ID KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE ‘LSO CHANGES WITH DIFFERENT ZONING. 'i' minimum side yard setback minimum rear yard setback 1llnimum front and side street setback - 25' from -property line or 55' from center of road - whichever Is areater C9 CuO RECEIVED BY CITY OF SP0KA.NF \/ALLEY FEB 2 6 2006 PERM !(11 CENTbh BY. 41, I Tc 14V ai I 1 s' i ' s' 1 CI i,6r 1 1 140' Nkk, 1) 642.72 permanently, nor shall any structure of o temporary character be used as a residence. No front yard of any lot shall be fenced along the front lot line nor bock to the bulldlrq set -bock line, The grantor reserves the easement,rlght and privilege on a strip of lond six (6)feet in width along and parallel to -the back tot Ilne of each 101 for telephone, gos, water, electric service and other utilities. No lots in this addition will be sold until domestic water is mode available. irsetuted of Washington, this 2 day of `, �-r ,1957