Loading...
2015, 03-11 Permit: ROW-2015-0114 ROWS�kane 4,0•0Valley. City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter@spokanevalley.org ROW -2015-0114 DE -ROW PROJECT NAME: ISSUED: 03/11/2015 SITE ADDRESS: 13308 E ALKI AVE SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: PLACE BURIED SERVICE WIRE FROM HOUSE AT 13308 E ALKI AVE TO PE CROSS ROAD, SDC WILL BORE ROAD PARCEL: 45154.1013 APPLICANT: SPOKANE DITCH & CABLE OWNER: CLOSE, WALTER J & JILL C PO BOX 6219 SPOKANE, WA99217 PO BOX 20 509-483-1272 MULLAN, ID 83846-0020 GENERAL CONTRACTOR: SPOKANE DITCH & CABLE PO BOX 6219 SPOKANE, WA99217 509-483-1272 License: SPOKADC099LC Expires: 04/23/2015 FEES: Paid Due Right of Way $110.00 $0.00 Totals : $110.00 $0.00 CONDITIONS * * The traffic control plan submitted has been approved for concept only. The Contractor is responsible for determining specific signage and layout as required by the Manual on Uniform Traffic Control Devices (MUTCD), WSDOT specifications and Washington State modifications to the MUTCD. All devices shall conform to the MUTCD and WSDOT specifications. * For all permits that include road obstruction the Contractor shall notify the Spokane Valley Public Information Officer (P10) at 509.720.5411 within 24 hours of receiving this approval. For any changes to the schedule of the road obstruction the Contractor shall notify the PIO of the change with a minimum of 48 hour notice prior to the road obstruction. The Contractor shall provide the location of the work, expected start and end times and dates of the road obstruction. The PIO will notify the newspaper, school districts, Spokane Valley Police Department, or fire dispatch as necessary. * The City of Spokane Valley may request changes as warranted by traffic conditions and motorist behavior. * If the construction zone is open to traffic before completion of final paving the Contractor shall provide warning signs, as required by the MUTCD and WSDOT specifications. * WSDOT Work Zone Traffic Control Guidelines are available at www.wsdot.wa.gov. For future submittals, please use the "Work Zone Traffic Control Plans (TC -1 — TC -18) if applicable to your project. * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. Printed by : Patrick Barclay on: 03/11/2015 08:54 AM Page 1 of 2 *Mime \•� , ••Valley® City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter(lspokanevalley.or g DE -ROW ROW -2015-0114 The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owners expense. Owner/Agent Date: Staff Approval Date: Printed by : Patrick Barclay on: 03/11/2015 08:54 AM Page 2 of 2