2012, 06-12 Permit: SW-12001528 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001528
Permit Issued Date:
06/12/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
SUTTER'S PHASE 3
SEWER
Primary Contact: OVERLAND EXCAVATION
Applicant: OVERLAND EXCAVATION
Address:
Phone:
Email:
24811 E WELLESLEY
OTIS ORCHARDS, WA 99027
509-226-1127
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
910 S BURNS RD
45234.4302
SNOOPY'S ADDITION
SNOOPYS ADD L2 B1
Water District: Vera
Irrigation District #15
Owner:
Address:
Phone:
Email:
STEPHENSON, RONALD B & JENNIFER
JR
910 S BURNS RD
VERADALE, WA 99037-9665
Fire District: Spokane Valley Fire
Land Area: 0.2302 acres / 10029 sqft
CONTRACTOR INFORMATION:
General Contractor
OVERLEI951 LE
OVERLAND EXCAVATION INC
24811 E WELLESLEY AVE
OTIS ORCHARDS, WA 99027
509-226-1127
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
$125.00
Total Fee:
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 06/12/2012 08:48:19
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001528 06/12/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/12/2012 08:48:19
Printed by: IIS APPPOOL\ASP.NET v4.0