Loading...
2012, 07-17 Permit: SW-12001757 SewerSPOKANE COL NTY' 1UILDING AND PLANNING PERMIT Application Number: SW -12001757 Permit Issued Date: 07/17/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION SUTTERS PH III SEWER Primary Contact: KALIN EXCAVATION Applicant: KALIN EXCAVATION Address: Phone: Email: 9229 E WOOLARD RD COLBERT, WA 99005 509-954-9101 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: 1120 S BURNS RD 45234.4902 SNOOPY'S FIRST ADDITION SNOOPYS 1ST ADD L2 B1 Owner: Address: Phone: Email: GEORGE, DEANNA J & DARRELL J JR 1120 N BURNS RD SPOKANE VALLEY, WA 99037 Water District: Vera Fire District: Spokane Valley Fire Irrigation District #15 Zoning: Land Area: 10125 Square Feet CONTRACTOR INFORMATION: General Contractor KALI NE"0431B KALIN EXCAVATION 9229 E WOOLARD RD COLBERT, WA 99005 509-954-9101 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 • Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 07/17/2012 08:36:39 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY'3UILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001757 07/17/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/17/2012 08:36:39 Printed by: IIS APPPOOLWSP.NET v4.0