2013, 08-14 Permit App: APR-2013-0045 Approach4
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
permitcenternaspokaneval ley.org
APPROACH PERMIT APPLICATION
PROJECT ADDRESS:
START DATE:/`_iS" /3 l
BUILDING OWNER NAME: 5 A %
ANTICIPATED COMPLETION DATE: 7/Z2 j /3
FiPt(1 4 I((4
MAILING ADDRESS:
CITY:
2LO ^ ).9)-- 1l 2,? f:`- // -73
STATE:
ZIP:
CONTACT PERSON NAME:
PHONE:
FAX: CELL:
CONTRACTOR NAME: AAA, j 4 7 ✓-a (/'-,'C/ �(
MAILING ADDRESS: /7 Z -- i ,' ti -c L. c? y f r1 V i' %
CITY:*esi<1. tit e /4/4'4/ p STATE: /1 J ZIP: q�� % t�
PHONE: (5.--C7 `/ y le- O �0
► . ,! O'
U 4,7
CONTRACTOR LICENSE #:
El Residential Driveway
ID Existing Curb & Gutter
El Culvert Installation
❑ Other Conditions:
FAX:
CELL:
CITY BUSINESS LICENSE #•
i_Concx 3ci a -
PROJECT DESCRIPTION (Please Provide Site Sketch) b �7S 4
IDCommercial/Industrial Driveway
KS
ElRural Road Section tJQe.w
Sidewallate'pnstructi--
air/Coon---� --
F i ��E D
4 2f3
Bond/Insurance certification must be on file with the City. PERMIT CENTER
DISCLAIMER f
The permitted verifies, acknowledges and agrees by their signature that: 1) iff thrtlnt is r obstruction orio I a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit intoe to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved
before this application can be processed.
Signature
DE -001: V-1
Date: 2/1
Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
EtSidewalk
ft wide
ft from back of curb
OStreetside Swale
I rainage Ditch
I� rywell (show location on sketch)
Other (please describe below)
wi
z'
n.
tat
CURB
J
w
z
w
n.
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
1-4'4—THROAT WIDTH a FT ----1--4'
WING (SEE TABLE) WING
STREET NAM E
Qi
of
o_�
v kt
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
CURB
RETURN
`‘IF CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
RETURN
15 RADIUS RADIUS
RETURN
EDGE OF J
ASPHALT
I THROAT WIDTH n FT ---I
(SEE TABLE)
STREET NAME
STREET WITH ASPHALT EDGE
!F CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
enol
IULaL WILLUI v. app.va....w ,,.... �.. ......��.. ....... ... .................__..
Residential Approaches.
Commercial
Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured from centerline to centerline of
each approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line (@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
cam4x4
/
C ' ( CC --°4 o A 62-.0 . :
C 1--4-=
DE -001: V-1
loll
aQ p . (i,P 10-0 �zz�
Page 2 of 2