Loading...
2013, 08-14 Permit App: APR-2013-0045 Approach4 Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 permitcenternaspokaneval ley.org APPROACH PERMIT APPLICATION PROJECT ADDRESS: START DATE:/`_iS" /3 l BUILDING OWNER NAME: 5 A % ANTICIPATED COMPLETION DATE: 7/Z2 j /3 FiPt(1 4 I((4 MAILING ADDRESS: CITY: 2LO ^ ).9)-- 1l 2,? f:`- // -73 STATE: ZIP: CONTACT PERSON NAME: PHONE: FAX: CELL: CONTRACTOR NAME: AAA, j 4 7 ✓-a (/'-,'C/ �( MAILING ADDRESS: /7 Z -- i ,' ti -c L. c? y f r1 V i' % CITY:*esi<1. tit e /4/4'4/ p STATE: /1 J ZIP: q�� % t� PHONE: (5.--C7 `/ y le- O �0 ► . ,! O' U 4,7 CONTRACTOR LICENSE #: El Residential Driveway ID Existing Curb & Gutter El Culvert Installation ❑ Other Conditions: FAX: CELL: CITY BUSINESS LICENSE #• i_Concx 3ci a - PROJECT DESCRIPTION (Please Provide Site Sketch) b �7S 4 IDCommercial/Industrial Driveway KS ElRural Road Section tJQe.w Sidewallate'pnstructi-- air/Coon---� -- F i ��E D 4 2f3 Bond/Insurance certification must be on file with the City. PERMIT CENTER DISCLAIMER f The permitted verifies, acknowledges and agrees by their signature that: 1) iff thrtlnt is r obstruction orio I a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit intoe to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature DE -001: V-1 Date: 2/1 Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: EtSidewalk ft wide ft from back of curb OStreetside Swale I rainage Ditch I� rywell (show location on sketch) Other (please describe below) wi z' n. tat CURB J w z w n. DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH 1-4'4—THROAT WIDTH a FT ----1--4' WING (SEE TABLE) WING STREET NAM E Qi of o_� v kt STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH CURB RETURN `‘IF CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) RETURN 15 RADIUS RADIUS RETURN EDGE OF J ASPHALT I THROAT WIDTH n FT ---I (SEE TABLE) STREET NAME STREET WITH ASPHALT EDGE !F CORNER LOT, DISTANCE FROM RADIUS RETURN Q FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. enol IULaL WILLUI v. app.va....w ,,.... �.. ......��.. ....... ... .................__.. Residential Approaches. Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' cam4x4 / C ' ( CC --°4 o A 62-.0 . : C 1--4-= DE -001: V-1 loll aQ p . (i,P 10-0 �zz� Page 2 of 2