Loading...
2015, 03-12 Permit: SW-15000169 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000169 Permit Issued Date: 03/12/2015 Expiration Date: 03/12/2016 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION GREEN HAVEN PH 3 C STONE EXCAVATING 509-599-9280 Applicant: C STONE EXCAVATING Address: Phone: Email: 12921 W SUNNYVALE DR NINE MILE FALLS, WA 99026 509-599-9280 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 18815 E ALKI AVE 55173.0513 CORBIN ADD GRNACRS TR A OF SP84-311 BEING A PTN OF W81 FT OF E201.3FT OF LT 5 BLK 4 8606020262 : (509)-477-3675 Owner: Address: Phone: Email: Water District: Consolidated Irrigation District #19 WELSH, RANDY & SUSAN PO BOX 457 Liberty Lake, WA 99019 Fire District: Spokane Valley Fire Land Area: 14823 Square Feet CONTRACTOR INFORMATION: CSTONSE916JZ, Exp. 05/14/2015 C STONE EXCAVATING 12921 W SUNNYVALE DR NINE MILE FALLS, WA 99026 509-599-9280 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $27.12 $125.00 $152.12 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 03/12/2015 11:51:17 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000169 Permit Issued Date: 03/12/2015 Expiration Date: 03/12/2016 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/12/2015 11:51:17 Project Coordinator: Kathy Cummings