Loading...
2012, 04-26 Permit: SW-12001216 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001216 Permit Issued Date: 04/26/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: SCHELLENBERG EARTHWORKS Applicant: SCHELLENBERG EARTHWORKS Permit Type: SEWER Address: PO BOX 3271 SPOKANE, WA 99220 Phone: 509-999-3694 Email: SITE INFORMATION: Site Address: Parcel Number: 505 S CARNAHAN RD 35231.1403 Subdivision: CAROLINE ADDITION Assessor's Description: Inspection Area: CAROLINE S75FT OF W150FT &E5OFT OF W150FT OF N75FT L2 B3 Owner: ANEST, RUBY Address: 505 S CARNAHAN RD SPOKANE, WA 99212-0343 Phone: Email: Water District: Carnhope Fire District: Fire District 1 Irrigation District #7 Zoning: Land Area: 0.3444 acres / 15000 sqft CONTRACTOR INFORMATION: General Contractor SCHELE*973D4 SCHELLENBERG EARTHWORKS PO BOX 3271 SPOKANE, WA 99220 509-999-3694 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/26/2012 09:39:02 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT 4 Permit Issued Date: Application Number: SW -12001216 04/26/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/26/2012 09:39:02 Printed by: IIS APPPOOL\ASP.NET v4.0