2012, 04-26 Permit: SW-12001216 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001216
Permit Issued Date:
04/26/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: SCHELLENBERG EARTHWORKS
Applicant: SCHELLENBERG EARTHWORKS
Permit Type: SEWER Address: PO BOX 3271
SPOKANE, WA 99220
Phone: 509-999-3694
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
505 S CARNAHAN RD
35231.1403
Subdivision: CAROLINE ADDITION
Assessor's Description:
Inspection Area:
CAROLINE S75FT OF W150FT &E5OFT OF
W150FT OF N75FT L2 B3
Owner: ANEST, RUBY
Address: 505 S CARNAHAN RD
SPOKANE, WA 99212-0343
Phone:
Email:
Water District: Carnhope Fire District: Fire District 1
Irrigation District #7
Zoning: Land Area: 0.3444 acres / 15000 sqft
CONTRACTOR INFORMATION:
General Contractor
SCHELE*973D4
SCHELLENBERG EARTHWORKS
PO BOX 3271
SPOKANE, WA 99220
509-999-3694
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 04/26/2012 09:39:02
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
4
Permit Issued Date:
Application Number: SW -12001216 04/26/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/26/2012 09:39:02
Printed by: IIS APPPOOL\ASP.NET v4.0