Loading...
2012, 04-03 Permit: SW-12001052 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12-001052 Permit Issued Date: 04/03/2012 Expiration Date: Project Description: Permit Type: SEWER CONNECTION SEWER Primary Contact: HATTENBURG EXCAVATING, INC. Applicant: HATTENBURG EXCAVATING, INC. Address: P.O. BOX 248 MEAD, WA 99021 Phone: (509)238-4454 Email: SITE, INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 1018 S CARNINE LN 45244.3521 Shelley Lake 5th Add SHELLEY LAKE 5TH ADDITION (AFN 5605530) LT 21 BLK 2 Water District: Vera Irrigation District #15 Owner: Address: Phone: Email: SHELLEY LK RES DEV/SHELLEY LK HO 8225 N DIVISION SPOKANE, WA 99208 Fire District: Fire District 1 Land Area: 0.26 acres / 11325 sqft CONTRACTOR INFORMATION: General Contractor HATTEEI980JT HATTENBURG EXCAVATING PO BOX 248 MEAD, WA 99021 509-995-4402 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/03/2012 06:30:43 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12-001052 04/03/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/03/2012 06:30:43 Printed by: IIS APPPOOL\ASP.NET v4.0