2012, 04-03 Permit: SW-12001052 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12-001052
Permit Issued Date:
04/03/2012
Expiration Date:
Project Description:
Permit Type:
SEWER CONNECTION
SEWER
Primary Contact: HATTENBURG EXCAVATING, INC.
Applicant: HATTENBURG EXCAVATING, INC.
Address: P.O. BOX 248
MEAD, WA 99021
Phone: (509)238-4454
Email:
SITE, INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
1018 S CARNINE LN
45244.3521
Shelley Lake 5th Add
SHELLEY LAKE 5TH ADDITION (AFN 5605530) LT
21 BLK 2
Water District: Vera
Irrigation District #15
Owner:
Address:
Phone:
Email:
SHELLEY LK RES DEV/SHELLEY LK HO
8225 N DIVISION
SPOKANE, WA 99208
Fire District: Fire District 1
Land Area: 0.26 acres / 11325 sqft
CONTRACTOR INFORMATION:
General Contractor
HATTEEI980JT
HATTENBURG EXCAVATING
PO BOX 248
MEAD, WA 99021
509-995-4402
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 04/03/2012 06:30:43
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12-001052 04/03/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/03/2012 06:30:43
Printed by: IIS APPPOOL\ASP.NET v4.0