Loading...
2012, 11-05 Permit: SW-12002507 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002507 Permit Issued Date: 11/05/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION WHITE BIRCH SEWER Primary Contact: SWANSON'S CONSTRUCTION Applicant: SWANSON'S CONSTRUCTION Address: Phone: Email: 11205 E EMPIRE AVE SPOKANE VALLEY, WA 99206 509-981-0852 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessors Description: Inspection Area: Zoning: 602 N CONKLIN RD 45134.0411 VERA 64 PT S OF RR R/W EXC E394.7FT ALSO PT OF ABAN SCD A&P RY R/W<BEG AT SWCOR TR4 TH N ALG E R/W LN OF CONKLIN RD 44.4F T TO POB TH CONT N ALG E R/W LN SD RD 21FT TH AT R/A TO RT 38.75 FT TO SELY R/ Water District: Vera Irrigation District #15 Owner: Address: Phone: Email: NAPIER INVESTMENTS, LLC 11118 E 9TH AVE SPOKANE, WA 99206 Fire District: Spokane Valley Fire Land Area: 29934.6 Square Feet CONTRACTOR INFORMATION General Contractor SWANSC*893D9 SWANSON'S CONSTRUCTION 11205 E EMPIRE AVE SPOKANE VALLEY, WA 99206 509-981-0852 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Date Printed: 11/05/2012 09:36:37 Printed by: IIS APPPOOL \ASRNET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002507 11/05/2012 Expiration Date: CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/05/2012 09:36:37 Printed by: IIS APPPOOUASP.NET v4.0