Loading...
2014, 09-03 Permit: EGR-2014-0016 Swale, Drivewaysi ne .01.0Valley City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter a(�spokanevalley.org EGR-2014-0016 DE -ENG -GRADING PROJECT NAME: ISSUED: 09/03/2014 SITE ADDRESS: 14419 E CROWN AVE SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: CONSTRUCTION OF ROADSIDE SWALE, TWO DRIVEWAYS AND ONE SINGLE BARREL DRYWELL PARCEL: 46353.0106 APPLICANT: SWAN LIVING TRUST OWNER: SWAN LIVING TRUST 14419 E CROWN AVE SPOKANE, WA99216 14419 E CROWN AVE SPOKANE, WA99216 FEES: Paid Due Grading Permit $21.00 $0.00 Totals : $21.00 $0.00 CONDITIONS * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. * Construction of every drywell, including fabric and drainrock, shall be observed by the on-site inspector (Street Standards 9.4.2) to confirm that it meets the design details and specifications. Drywells not observed shall have their performance verified by a full-scale drywell test (SRSM Chapter 4). * Forty-eight (48) hours prior to construction (onsite and/or within the right-of-way), securely post a construction warning sign at each ingress to the project area that is clearly visible from the right-of-way. The sign shall be posted for the duration of the project. See Street Standards Section 9.7. The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's expense. Owner/Agent �cY Date: y'-3 - Staff Approval ' Date: Printed by : Tamara Fauroton: 09/03/2014 08:59 AM Page 1 of 1