Loading...
2012, 12-06 Permit App: BLD-2012-2222 Finish Basement010#\... Spokane Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 Dermitcenter@spokanevallev.ora (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION I NEW CONSTRUCTION /X ADDITION/REMODEL d ACCESSORY BUILDING Q DECK f OTHER `1 SITE ADDRESS: 1(44N- Cr7� ILLI VO\\f.Q �� ( qq z i L ASSESSORS PARCEL NO.: V LEGAL DESC zi?TION. BUILDING OWNER NAME: Upper Floor SQ FT: Unfinished Basement SQ FT: Project #..BW I �-'-7-z '_ Garage SQ FT: NAME: 119P -�- +0-1-hRECEIVED 30% Slopes on Property: No. of Bedrooms: ADDRESS: 1—tE - (\an Heat Source: Sewer or Septic: CES' 012 CITY: (QV \b` L STATE: L_ ZIP: 4._E -,CSV PHONE: -L135- ` 3 ) 1 FAX: FERMIR CELL: .)9 VI SUB # REV. CONTACT NAME:: APIC -7 0 n12 PHONE: rym' 5 - 3-70 I CONTRACTOR NAME: Our Or MAILING ADDRESS: FAX: CELL: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE QF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: FntSh ****YOU MUST COMPLETE THE FOLLOWING**** A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: FinishedB sement SQ FT: 40 O Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ /4000 - DISCLAIMER / )T' DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be ubmitte and subsequently approved before this application can be processed. Signature Date: Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_=Residential_11-11-11.doc oane Valley. 11 iuj h Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenter( :anevalley.org Community Development Plumbing Permit Application PERMIT NUMBER: PERMIT FEE: SITE ADDRESS: ai AS La 1. Commercial J'Residentia1 Zito CURRENT FEES AVAILABLE AT: http://www.spokanevailey.orq/ under the quick links for Farms, Master Fee Schedule. http://www.spokanevalley.org/up loads/Community _Development/Documents/Forms/Building/PlumbingPermitApplication040309. doe Building Owner Name: T.f n 19 p \ , D Xa �C.1 lYa 'ls I h Phone: G _ Lar,_ 42,-7 t Fax: // jam,, Address: - FA. %I City: 1� 7 i ,.tate: Zip: % L V Contractor )Los v�t p.- Name: Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: �(� ( r L �7( Name: ti4o u \ Y�(� 1 Phone: 5M l 3� ^ 3 Z -n # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS URINALS TUBS SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS — — -Project o-, -----» # az_':zzZ __5 RECEIVED ❑CASH O CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: 0" 0 6 2012 CSV PERMIT CENTER SUB # ` REV. # CURRENT FEES AVAILABLE AT: http://www.spokanevailey.orq/ under the quick links for Farms, Master Fee Schedule. http://www.spokanevalley.org/up loads/Community _Development/Documents/Forms/Building/PlumbingPermitApplication040309. doe Silolane jValley� Target Date sheet For City Use Only PLUS Project Bt6.1- zc'2-ZZZZ� Project Address I![ t iJZ e tZ ('' rr) 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 1Z -13-1Z_ The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. _I 11 1 &I. 1 111 LI/A _ Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1