2005, 04-15 Permit: 05001164 ResidenceBUILDING DIVISION
1 1707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
1
Site Address: 14710 E CROWN AVE
Parcel Number: 46353.9123
Subdivision:
Block: 27 Lot: 7
Zoning: UR -3 Urban Residential 3.5
Owner: LANZCE G DOUGLASS INC
Address: 8510 N CRESTLINE ST
SPOKANE, WA 99217
Building Inspector: NIK BENTLEY
Water Dist:
Project Number: 05001164 Inv: 1 Issue Date: 04/15/2005
Permit Use: NEW RESIDENCE W/ATTACHED GARAGE - NATURAL
GAS
Applicant: LANZCE G DOUGLASS INC
8510 N CRESTLINE ST
SPOKANE, WA 99217 Phone: (509) 483-6532
Contact: LANZCE G DOUGLASS INC
8510 N CRESTLINE ST
SPOKANE, WA 99217 Phone: (509) 483-6532
Setbacks - Front: 34 Left: 9 Right: 10 Rear: 20+
Group Name:
Project Name: ROW
Permits
Approach
Contractor: LANZCE G DOUGLASS, INC License #: LANZCGD072P5
APPROACH INSPECTION 1 $25.00 CONST IN ROW - APPROACH
FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING
Building Permit
Group: R-3
Contractor: LANZCE G DOUGLASS, INC
Type: VB
Total Area
Building Height
Stories
Dwelling Units
2600
19
1
BASEMENT U
DECK
GARAGE
RESIDENCE
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
R-3 VB
R-3 VB
U-1 VB
R-3 VB
1,300
120
696
1,300
$131,608.00
Mechanical Permit Contractor: LANZCE G DOUGLASS, INC
GAS WATER HEATER
GAS PIPING
CLOTHES DRYER
HOOD -TYPE 11
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
1
3
1
1
Total Permit Fee:
License #: LANZCGD072P5
RESIDENTIAL PERMIT FEE
STATE SURCIIARGE
RESIDENTIAL PLAN REVIEW
Total Permit Fee:
License #: LANZCGD072P5
$10.00 GAS APPLIANCE<=100,000BT
$3.00 VENTILATING FANS
$10.00 GAS LOG OR GAS INSERT
$10.00
Total Permit Fee:
1 $25.00
$50.00
51,172.95
$4.50
$469.18
1
4
1
$1,646.63
$12.00
$40.00
$10.00
$95.00
Processed By: KATHY CUMMINGS
Printed By: MIKE TURBAK Page 1 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility ef the
applicantlpermittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLIJMBING — alter rough -in, before covering, and f,nal.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. Alt perrnits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this perrnit. Items such as the installation of fire hydrants, fire departrnent access,
on-site drainage ('208' owa/en), road improvemonts, parking and landscaping are common requirements pra permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, »and,ai|e, oNning, etc. msm||ed, and prior to occupancy;
completed inspection record card must be available on site,
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel ppp,oacn, after completion.
In addition tome auuvo, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Buitding, plumbing (inctudes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of SpokValley
Public Works 688-0195 or State Depof Transportation
324-6000
Permits and inspections for electrical State Department *Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and inspections for On -Site Septic systems, Spokane Regional Fire snk^er=*w"rm"yst°"s and pnv"maccess road inspections. Spokane Valley
Health Distnct 324-1560 Fire Department 892-4122
State law RCW 19 122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified Call before you dig al least 2 working days in advance. 456-8000.
PERMIT EXPIRATION AND REFUNDS
Alt permits shall expire by limitation and be declared void 1 a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, rdless of whethethe work is
finished. If a perrnit is expired for time, a new permit may be obtained for half the perrnit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original perrnittee to the Building Official no later than 180 days afterthe date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdr norcancelled prior tothe plan review being completed.
Owner / Agent
Date
Staff Approval Date
c.„0F
Spokane
.Valley
BUILDING DIVISION
1 1707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 14710 E CROWN AVE
SPOKANE VALLEY, WA 99216
Parcel Number: 46353.9123
Project Number: 05001164 Inv: 1 Issue Date: 04/15/2005
Permit Use: NEW RESIDENCE W/A1 I ACHED GARAGE - NATURAL
GAS
Permits
Plumbing Permit
Contractor: LANZCE G DOUGLASS, INC
TOILETS/BIDETS
TUBS
GARBAGE DISPOSAL
FLOOR DRAINS
WATER USING DEVICES
FOR PLUMBING INSPECTIONS CALL (509) 688-0054.
License #: LANZCGD072P5
3 $18.00 SINKS
3 $18.00 DISH WASHERS
1 $6.00 CLOTHES WASHER
1 $6.00 CROSS CONNECTION DEVICE
3 $18.00
4
1
$24.00
$6.00
$6.00
$6.00
Total Permit Fee: $108.00
Payment Summary
Total Fees AmountPaid AmountOwing
$1,899.63 $1,899.63 $0.00
Tran Date
04/15/2005
Processed By: KATHY CUMMINGS
Printed By: MIKE TURI3AK Page 2 of 2
Receipt # Payment Amt
1013 $1,899.63
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for electrical winng, State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and inspections for on-site septic systems, Spokane Regional Fire spnnkter and alarm systems and private access road inspections, Spokane Valley
Health District 324-1560 Fire Department 892-4122
State law RCW 19 122 requires that prior to any excavation the "CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance, 45g-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected, Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrQn or cancelled prior to the plan review being completed.
Owner / Agent
\f7J\
Date Lt 16
Staff Approval Date