Loading...
2005, 04-15 Permit: 05001163 Residence1 .0.Valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 14716 E CROWN AVE Parcel Number: 46353.9123 Subdivision: Block: 27 Lot: 8 Zoning: UR -3 Urban Residential 3.5 Owner: LANZCE G DOUGLASS Address: 8510 N CRESTLINE ST SPOKANE, WA 99217 Building Inspector: NIK BENTLEY Water Dist: Project Number: 05001163 Inv: 1 Issue Date: 04/15/2005 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE - NATURAL GAS Applicant: LANZCE G DOUGLASS 8510 N CRESTLINE ST SPOKANE, WA 99217 Phone: (509) 483-6532 Contact: LANZCE G DOUGLASS 8510 N CRESTLINE ST SPOKANE, WA 99217 Phone: (509) 483-6532 Setbacks - Front: 34 Left: 30 Right: 10 Rear: 20+ Group Name: Project Name: ROW Permits Approach Contractor: LANZCE G DOUGLASS, INC License #: LANZCGD072P5 APPROACH INSPECTION 1 $25.00 CONST IN ROW - APPROACI I FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING Buildin2 Permit Group: R-3 Type: VB Total Area 2264 Building Height 19 Stories I Dwelling Units 1 Contractor: LANZCE G DOUGLASS, INC BASEMENT U DECK GARAGE RESIDENCE Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. Total Permit Fee: License #: LANZCGD072P5 R-3 VB 1,132 R-3 VB 120 U-1 VB 660 R-3 VB 1,132 $115,857.76 Mechanical Permit Contractor: LANZCE G DOUGLASS, INC GAS WATER HEATER GAS PIPING CLOTHES DRYER 1100D -TYPE II FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. RESIDENTIAL PERMIT FEE STATE SURCHARGE RESIDENTIAL PLAN REVIEW 1 $25.00 $50.00 $1,083.35 $4.50 $433.34 Total Permit Fee: $1,521.19 License #: LANZCGD072P5 1 $10.00 GAS APPLIANCE<=100,000BT 3 $3.00 VENTILATING FANS 1 $10.00 GAS LOG OR GAS INSERT 1 $10.00 Total Permit Fee: 1 4 $12.00 $40.00 $10.00 $95.00 Processed By: KATHY CUMMINGS Printed By: MIKE TURBAK Page 1 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy, MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building departrnent for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for elecincal wiring, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on-site septic systems. Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections, Spokane Valley Health DisInct 324-1560 Fire Department 892-4122 State law RCW 19.122 requires that poor to any excavation the 'CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance. 456-8000 PERMIT EXPIRATION AND REFUNDS All perrnits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a perrnit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdr or cancelled prior to the plan review being completed. Owner / Agent iv Date 4K/(k Staff Approval Date 1 yoF •••0%.„ Stiokane 4000%lley BUILDING DIVISION 11707 E. Sprague Avenue. Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 14716 E CROWN AVE SPOKANE VALLEY, WA 99216 Parcel Number: 46353.9123 Project Number: 05001163 Inv: 1 Issue Date: 04/15/2005 Permit Use: NEW RESIDENCE W/A11ACHED GARAGE - NATURAL GAS Permits Plumbing Permit Contractor: LANZCE G DOUGLASS, INC License #: LANZCGD072P5 TOILETS/BIDETS 3 $18.00 SINKS 4 $24.00 TUBS 3 $18.00 DISH WASHERS 1 $6.00 GARBAGE DISPOSAL 1 $6.00 CLOTHES WASHER 1 $6.00 FLOOR DRAINS 1 $6.00 CROSS CONNECTION DEVICE 1 $6.00 WATER USING DEVICES 3 $18.00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Total Permit Fee: $108 00 Payment Summary Total Fees AmountPaid AmountOwing $1,774.19 $1,774.19 $0.00 Tran Date Receipt # Payment Amt 04/15/2005 1013 $1,774.19 Processed By: KATHY CUMMINGS Printed By: MIKE TURI3AK Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this perrnit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a perrnit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eiectncai wrong, State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division And Industries 324-2640 4773604 Permits and inspections for on-site septic systems. Spokane Regional Fire sprinkler and alarm systems and pnvate access road inspections, Spokane Valley Health Distract 324-1560 Fire Department 892-4122 State law RCW 19 122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified Call before you dig at least 2 working days in advance. 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a perrnit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn,gr cancelled prior to the plan review being completed. Owner / Agent Date 4161 Staff Approval Date