2015, 04-09 Permit: SW-15000315 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000315 Permit Issued Date: 04/09/2015
Expiration Date: 04/09/2016
Project Description: SEWER
Project Name: GREEN HAVEN
Primary Contact: RICK MILES CONSTRUCTION LLC
Phone: 509-991-6745
Applicant: RICK MILES CONSTRUCTION LLC
Address: 17414 E ALKI AVE
GREENACRES, WA 99016
Phone: 509-991-6745
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description:
Inspection Area:
Zoning:
17501 E ALKI AVE
55183.0103
CORBIN ADD TO GREENACRES L3 B16 INC 20'
VAC CANAL R/W N 0 F & ADJ
: (509)-477-3675
Owner:
Address:
Phone:
Email:
MILES, RICK L & BEVA L
17501 E ALKI AVE
SPOKANE VALLEY, WA 99016
922-1129
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Land Area: 5.12 Acre(s)
CONTRACTOR INFORMATION:
RICKMMC961NT, Exp. 08/25/2015
RICK MILES CONSTRUCTION LLC
17414 E ALKI AVE GREENACRES, WA 99016
509-991-6745
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
Inside Public Transit Benefit Area
SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well)
from DOE prior to permit issuance.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 04/09/2015 12:42:33 Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000315
Permit Issued Date: 04/09/2015
Expiration Date: 04/09/2016
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/09/2015 12:42:33 Project Coordinator: Susan Clark