2015, 04-20 Permit App: APR-2015-0034 ApproachWane
4,005Valley.
pot ane
Valley.
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite 13-3
Spokane Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
permitcenternspokanevalley.org
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APPROACH PERMIT APPLICATION
PROJECT ADDRESS:
START DATE:
M /703 SS'H6: ga
Y/23/tC
BUILDING OWNER NAME: eicli
ANTICIPATED COMPLETION DATE:
MAILING ADDRESS:
CITY:
STATE:
CONTACT PERSON NAME:
PHONE:
FAX: CELL:
CONTRACTOR NAME: C‘&,4.7' ! £i , s /6 4 e r
MAILING ADDRESS:
/76 /y 4-E, 3-ono4
CIT,': S�ZjKQ, t / /4` STATE: Gr„ --47 ZIP: 0/6
PHONE: SC 9 — 7/ �/ — / 3 00
FAX: CELL:
CONTRACTOR LICENSE #: c'14WR lC cc/g04,EXPIRES: g/f,51 , -5 CITY BUSINESS LICENSE #:
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway _ -❑ Commercial/Industrial Driveway
D Existing Curb & Gutter ❑ Rural Road Section
❑ Culvert Installation - ❑ Sidewalk Repair/Construction
❑ Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: I) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved
before this application can be processed.
DE -001: V-1
Date
RECEIVED
CS'/ PERMIT CENTER
APR 2 G 2Qt
Projxt# /f 1\D-70162-co3
Name 720
Submittal i
Pagel of2--
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑Sidewalk
ft wide
ft from back of curb
❑Streetside Swale
['Drainage Ditch
❑Drywell (show location on sketch)
['Other (please describe below)
0
al
CURB
EDGE OF
ASPHALT
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
NG OAT (EETABLE) • EJ ��NG NIF CORNER LOT,
DISTANCE FROM
RB RETURN
FT (SEE TABLE)
STREET NAME
d/ gut, 5
STREET WITH CURB
D STANCE FROM
NEAREST PROPERTY LINE
MAY E LEFT OR ROHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
15' RADIUS
THROAT WIDTHLE) UFT
(EE TAB
STREET NAME
STREET WITH ASPHALT EDGE
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
RADIUS
RETURN
Approach Requirements:
Maximum 2 approaches per property frontage: one on arterials.
• 'Total width of approaches not to exceed 50% of frontage width.
-
Residential Approaches
Commercial
Approaches
Distance from Curb/Radius Return - -
15' minimum
75' minimum
Separation between Approaches (measured from centerline to centerline of
each approach) -
None specified -
See Page 7-27.
in City Street Standards
Throat Width (Flat portion) - -
16' min., 30' max.
30' nein., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line (@ r/w) -
- 5.0'
Minimum Distance from Crosswalk
5'
5'
DE -001: V-1
Page 2 of 2