2008, 10-21 Permit App: 08003954 Pole BldgProject Number: 08003954 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/21/2008 Page 1 of 2
Project Information:
Permit Use: 24 X 30 POLE BLDG
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 005720 Name: SULLIVAN MEADOWS
Contact: DAVE BENSON CONSTRUCTION
Address: E 4 CHATTAROY RD
C - S - Z: COLBERT WA 99005
Phone: (509) 276-8296
Group Name:
Project Name:
District: East
Parcel Number: 45253.0812 Block:
SiteAddress: 2413 S CHERYL CT
Location:: CSV
Zoning: 14-2
Water District:
Area: 10,770 Sq Ft
Nbr of Bldgs: 1
Lot:
Owner: Name: GLAZE, GARY E.
Address: 2413 S CHERYL CT
SPOKANE VALLEY, WA 99037
SF Res Suburban District
Hold: fl
Width: 66 Depth: 144 Right Of Way (ft): 50
Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 10/21/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 10/6/2008 By: MHARNOI
Permits:
Operator: jmm Printed By: JD
Print Date: 10/21/2008
Project Number: 08003954 Inv: /
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/21/2008
Contractor: BENSON CONSTRUCTION
Address: 4 E CHATTAROY RD
COLBERT WA 99005
Description Grp Type
POLE BDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Notes:
Notes
Building Permit
Page 2 of 2
Firm: BENSON CONSTRUCTION CO
Phone: (509) 954-4924
This Application:
Sq Ft Valuation
720 $13,680.00
Total Project:
So Ft Valuation
720 $13,680.00
Totals: 720 $13,680.00
Units Unit Desc
1 SELECT
I SELECT
1 SELECT
Permit Total Fees:
720 $13,680.00
Fee Amount
$237.25
$59.31
$4.50
$301.06
OK TO ISSUE SEWER PERMITS PER BILLY 6/20/95
Issued home occupation Affidavit of Exemption 5/5/2008 - Gary E Glaze, "G.E.G. Enterprises" - Safety
consultant, home office for consulting business
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $301.06 $301.06 $0.00 $301.06
$301.06 $301.06
$0.00 $301.06
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances. '
Signature:
Operator: jmm Printed By: .ID Print Date: 10/21/2008
Spokan
mosersValley.
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenteraspokaneva Iley. orq
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
g-:*) ?it/
RECEIVED BY
CITY OF SPOKANE VALLEY
OCT 0 r 2008
rp t& CENTER
RESIDENTIAL CONSTRI-)CT- -N PERMIT APPLICATION
❑ NEW CONSTRUCTION ❑ ADDITION/REMODEL ACCESSORY BUILDING
❑ DECK / ❑/ OTHER
SITE ADDRESS: /I � S .Ch eL �e r-9i�i�C-/,/�- /1 /-/ 037
ASSESSORS PARCEL NO.: 1/5-; ft 0 /), LEGAL DESCRIPTION:
SPS Z'; %GJ A) "or e71y
BUILDING OWNER NAME:
NAME:
£T arC - �� 7/ a
471/"?
1
ADDRESS: 42. 7
CITY: S;%�pr.(pi. /: STATE: lj� ZIP:
� 9 O 77
PHONE: �j'- �%[i 'a �2- FAX. �/
CELL: .42, 4.
CONTACT NAME: , G- 64' 7 &
PHONE:
4,8—o3�2
FAX: CELL:
CONTRACTOR NAME: /%(le_ advfp,J (moo na-71
MAILING ADDRESS: er y
CITY: �/f llll
¢v0 ri /<sr—
PHONE: 3r4Q— 2- 7.c—
/ STATE: A4Z1 //' ZIP: 99aor"
FAX: 4-09,- 27(v/' 2-aC CELL:
<779 9'r,'
CONTRACTOR LICENSE No.: Sen,socc?jo cc EXPIRES: %-09 CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
ev/- & ,71-€74-0436.' 9c /P- '
PROPOSED USE: gi-c, arca r.-414
_%
Effective October 28, 2007 Page 1 of 2
C:\DOCUMEru1\David\LOCALSna1\Temp\Residential Construction Permit App.1.doc
****YOU MUST COMPLETE THE FOLLOWING****
MARK NIA IF NOT APPLICABLE
Height to Peak:
/C ®
Dimensions:
P-17r04-r.�/ /
No. of Stories:
/
Total Habitable
Space:
Main Floor SQ
FT:
Upper Floor SQ
FT: ��
Unfinished Base nt
SQ FT: Qr
Finished Base nt
SQ FT: Al 1
Garage SQ FT:
—' 20
Deck/Covered, atio
SQ FT: 0`--7,
Impervious Surface
Area:
30% Slopes on
Property:
No. of
Bedrooms: G+,/�
Construction
Type: 1/,e,.
Heat Source:Sewer
4/1/41
or
Septic: A 1
TOTAL COST OF PROJECT: $
/g Gr
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date:
Method of payment: ❑Cash
Bankcard #:
❑ Check D Visa
D Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
C:\DOCUME-1\David\LOCALS•v1\Temp\Residential Construction Permit App.l.doc
Spokane
400#Valley®
For City Use Only
PLUS Project Numbers 3 V 33
Project Address o9.yl.S 5 C/L¢-r .'C.
11703 E Sprague Ave Suite B-3 4' Spokane Valley WA 99206
509.688.0036 4 Fax: 509.688.0037,1;permitcenter@spokanevatley.org
As part of our on-going commitment to customer service during the review'process`of your project
application, we are providing you with a TARGET DATE for the initial' technical application review. if for
any reason we cannot meet this date, we will contact you with a revised target' date.
Your application review TARGET DATE is /Oh
The TARGET DATE is the date we estimate your project application will have had its initial technical.
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review,
i Submit complete, accurate plans and documents. .
E-vf-a time may be required for re -submittals as project application reviewers work on rnuftiple applications and.it
may be .several dais before they can look at your new or revised infbrination.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can he .changed. ohne-inclividual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.'
i Call stall regarding the status of your project only after the target -date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your targer date. Staff may contact' you before the target date if the initial review. is complete. BY following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of 'the required
documents, as indicated on your Pre -Application Checklist have been submitted .or have been approved for : deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality checkto make sure that the application is reviewable and free.
from substantive flaws that would prevent technical staff from completing the technical review once it is.started. When
this step is complete, your application will be routed to the appropriate staff and renlain.in their review .queue until it
comes up for review. .•
3. Technical Compliance. Once an application is administratively complete, it is routed to technical stall' for compliance
review. Depending on the type of project, technical staff may include multiple reviewers: You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review iscomplete.
4. Permit Issuance. When the technical compliance review of the application is.complete, including any 'subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center -.When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK -BUILDING FILE
REV 9/07
I N
/r
1
0
a
-t
s
1-)-
g
^J
o.
�J ��
i