Loading...
2010, 04-13 Permit App: 10000960 AdditionProject Number: 10000960 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/13/2010 Page 1 of 2 Project Information: Permit Use: 24 Ft x 24 FTRESIDENTIAL ADDITION Contact: LUCAS, DANIEL L & LORRAINE M Address: 2420 S CHERYL CT C - S - Z: SPOKANE VALLEY, WA 99037 Setbacks: Front Left: Right: Rear: Phone: (509) 891-0277 Group Name: Site Information: Project Name: Plat Key: 005720 Name: SULLIVAN MEADOWS District: East Parcel Number: 45253.0805 Block: SiteAddress: 2420 S CHERYL CT Location:: CSV Lot: Owner: Name: LUCAS, DANIEL L & LORRAINE Address: 2420 S CHERYL CT SPOKANE VALLEY, WA 99037 Zoning: 14-2 SF Res Suburban District Water District: 010 VERA Hold: ❑ Area: 10,011 Sq Ft Width: 95 Depth: 106 Right Of Way (ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: „ Review Building Plan Review Released By: Originally Released: 4/13/2010 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 4/13/2010 By: Ibarlow Operator: jmm Printed By: jmm Print Date: 4/13/2010 Project Number: 10000960 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/13/2010 Contractor: OWNER Description Grp Type Notes RES ADD R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW <7999 SQ FT Notes • Building Permit Page 2 of 2 Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Sq Ft Valuation Su Ft Valuation 576 $56,995.20 576 $56,995.20 Totals: 576 $56,995.20 576 $56,995.20 Units Unit Desc I SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $692.75 $4.50 $277.10 $974.35 OK TO ISSUE SEWER PERMITS PER BILLY 6/20/95 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid $974.35 $974.35 $277.10 $974.35 Amount Owing $697.25 $974.35 $277.10 $697.25 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 4/13/2010 Spokane jValley� Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave Spokane Valley, (509)688-0036 F www- .s.okanevalle , or 99206 : (509)d -TJp37 ew Constructn dn/Remodel Accessory Bldg Deck SITE ADDRESS: .24 ZO S. C hs..tv/19-h c 19/&if GL1,// 9f0d 7 ASSESSORS PARCEL NO: 4612.5:3 d 8' C5 LEGAL DESCRIPTION: ,S///j/ #(t M41946 ./17 - Building Owner: Name:, / 1, _ C S D Rn % erL Lc,��z.�/w Address:.24.210 s- . C,4 EQ7 L e.,f City:vaki,-nk- .(.1/6. y State: Aid Zip :5;5.Q j- Few Cr[L Phone/5i4) '9/-0,1.77 C,52 )2-9c"Jz55 Contact Person Name: I)19 /1; Phone:( ) e / -e;2.7 7 cell(55,),../9o3zs.� Contractor: DIMENSIONS: / '1'/24- f Name: )�AYI ice s (®Caren) Address:. 0- fit S . l k, e./. City: �� /C G/ te. /�- Zip:Iga3 7 Phone:0_2'^) .P,/,0,z77 C( ) w290-32-575- Contractor tic No: ^ Exp Date: FINISHED BASEMEN SQ. FTG: V/9- City Business Lic. No: _ /014/10 #4el DEC OV. PATIO SQ. FTG: 1 Describethe scope of wprk in dg et l: Loit,V.Zoject:$A d an-�, �t - .Z 4 A 24fe- cculd ay %' :e- tv/ lam.- e.--- ‘' Jx,,q/. ..?Xi- , 4'/414 2 / a'e a4a- i- .5'X 5' Y 51$11—e—e4 4.--- Proposed Use: f., . ia.,-).2.,,,,L5Ae« , )z_ 644- 4444. 4,44Z, ,2te0 **************The followinw MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: / 6 ` - DIMENSIONS: / '1'/24- # OF STORIES: / TOTAL HABITABLE SPACE: (6.--°(--8 {t - MAIN FLOOR TOS �%6, FTG: /D S' -� �5 /� t 2"" FrOR OR SQ. FTG: � 1 z� / UNFIN BASEMENT SQ. FTG_ : , 7i1� IMPERVIOUS S RFACE AREA: ,: i FINISHED BASEMEN SQ. FTG: V/9- ,. A RAGE SQ. FTG: 50i, ct)4''517"n DEC OV. PATIO SQ. FTG: 1 30% SLOPES ON PROPERTY: i7/// L rn✓/ilq Zye,', # OF BEDROOMS: 7 / /9- CONSTRUCTION TYPE: WO D HEAT SOURCE: / .f -i--- SEWER OR SEPTIC? S Lc1.11?-i The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: LI Cash Bankcard #: Authorized Signature: REVISED 2115!07 (Check DATE: 4-C! ,/6 ❑ Mastercard ❑ VISA Expires: VIN#: Spokane Valley® For City Use Only PLUS Project Number Q; (E Project Address 2g9_0 .11.703 E Sprague Ave SuiteB-3.♦ Spokane Valley WA 99206. 509.688.0036.1 Fax 509:688:0037 4 permitcenter®spokanevalley:org',•. As part of our on-going commitment to customer service dialing `.,the review process offyoun.project; application, we are providing you with a TARGET DATE for the initial 'technical application review: if:for • any reason we cannot meet this date, we will contact you with a revised target date,, , '; Your application review. TARGET'DATE is 1111-4211 H ` • •The TARGET DATE is :the date we estimate your;:project application.'will have had tis inittal'technical review. It is not the date for approval or permit issuance: Tips fora Smoother Project Application Review.;:. Submit complete; accurateplans and -documents:• atm dime May be required fbr rei-suhnritta/.s as project application'revten en- ii'ork on nniltiple 'apphcattons unci it may be.several dad -s bejbre they can look at your nen' or revised information; . ' Vie.. .... Designate a specific contact person to'cornmunicate with the City.' • 11/bile the pets on. designated U.S the applicant's contact person ninth die -Citi can'he changed,'one ntdividual'withahe expertise.for dealing with reviewer comments would be the best choice fo,rihe entjre)_eriew:process. • %: Call staff regarding the status of your project only after the target date shown at the„trip of the page: • Alihoitgh _rot should be contacted on :or by the target date. please fee/ free Io co_ ivaeriis if you/mierheard fi-bin us • -by your targei date: Sttff,niar contact you before die: tcirget date if the initial teviety is contplete.:Big jo/lowing,i/iis procedre, you wilt save time and allow -the reviewers to complete the work more eapediliouslr. ' Steps in the Permit Process'. 1.' Counter Complete. Your application has been accepted .as counter complete This Means.'al! of the- required documents, as indicated on your•Pre-Application Checklist have been submitted icor have been , approved -for- deterred submittal. This does not prevent technical staff from requesting additional information as a result oftheir,technicalreView.:'- 2. Quality Check. The next step in the process is a.qutility check to make sure th it:thc application is reviewable'and free from substantive ilaws'i lm would preventaechnical staff from completing the technical review once it is started. When' : this step is coniplcte,your application will-be're conics up for review. ' ..• - 3. Technical Compliance. Once_ an application is administratively complete it is'routed'to technical staff for compliance review. Depending on the type of project,,technical stall miy'include:multiple;:revieters.,• You' should be contacted.by phone, fax, email, or mail by your TARGET DATE once the initial' technical compliance review is,cornplete: 4. Permit Issuance. Whenithe technical compliance review. of the.•applic<ihon is complete nc!udtng any silbsequenhre- ; submittals; each reviewer Will approve thcif section ofthe application and route'i1to the Permit Center. When all sections i_: of the application are received; a Permit Specialist 'will'process`the ain pplicon•and contact"the'person'specified on' yolk - application fo(permit pick-up.'Information regarding lecs:and pre construction meetings (ifrequired) will be provided by '_ the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 ' Untitled Page 22 .to pO .1-4° • Fr G rage 1 oi i• r--10 10-1 1 Wd Dk i Wd Dk 1 8 , i (80) (16) I 40 25 5E-AAJ eft_ EloiititiC By. ID2( 161.0 Acf, , 2-010 http://www.spokanecounty.org/pubpadal/ParcelSketchbookImage.aspx DATE. 2/20/2010 5 2 2: 1 s Fr 3 0 Nia E2 10 16 1 RECE CSV PERMIT C Project Norne Submittal 41; LO NTER 2010 tA ft 13) C ct, ,Yrittir1,/ PLANNING DEPT. APPROVED /31..!