Loading...
2007, 04-09 Permit App: 07001181 DeckProject Number: 07001181 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 04/09/2007 Page 1 of 2 Permit Use: 16X14 DECK Contact: DUPONT CONSTRUCTION Address: 622 E DECATUR C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 489-5720 Group Name: Site Information: Project Name: Plat Key: 000147 Name: BARMETTLERS 01ST ADD District: Nort Parcel Number: 45151.0313 Block: Lot: SiteAddress: 13105 E DESMET AVE Location:: CSV Zoning: UR -3.5 Urban Residential 3.5 Water District: Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 60 Owner: Name: SCOTT WALKER Address: 13105 E DESMET AVE SPOKANE VALLEY, WA 99216 Hold: D Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 04/09/2007 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Permits: - Operator: JD Printed By: JD Print Date: 04/09/2007 Project Number: 07001181 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 04/09/2007 Page 2 of 2 Building Permit Contractor: DUPONT CONSTRUCTION INC Firm: CHRIS DUPONT/DUPONT CONST Address: 622 E DECATUR Phone: • (509) 489-5720 SPOKANE, WA 99207 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation DECK OPEN R-3 VB 313 $4,695.00 313 $4,695.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Totals: 313 $4,695.00 313 $4,695.00 Units Unit Desc I SELECT 1 SELECT I SELECT Fee Amount $111.25 $27.81 $4.50 Permit Total Fees: $143.56 Notes: Payment Summary: P Permit Type Building Permit Fee Amount Invoice Amount $143.56 $143.56 Amount Paid $0.00 Amount Owing $143.56 $143.56 $143.56 $0.00 $143.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 04/09/2007 Permit Center San 11703_F-Sprague(Ave;Surte'B-3 pokaDrne Spokane Valley, WA 99206 Valley (509)6881036 FAX: www.spokanevaIg& Community Development Residential Construct on u1 % (� Permit Application U PERMIT NUMBER: j I { PERMIT FEE: J(f3 sc. New Construction n Accessory Bldg ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: I 10 s e _JestA,zr ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Buildirig'.Owner. - •,� ' C6ntractor Name:Sc—rr-T 'n pt_ `Lrycm Name: \-\-- • >\ Address: ) �JV�F___-- - (- City: �� S at - �_ p 1 c . 7 Address: , L� &"1/4 City: State: Zip l _,��%ft Phone:`P 3 '�'Phone: c - y' ,ma( ff / . � 7 Fax: � crc: Contractor, tc N ° /r yle-) ,�cp p�le� I 1 �-Cl J � � l�\ J l� 1 / \` A e..., a � �\y „tea .. Contact Person � C1!^:=. u.\` City Business Lic. No:. Name: 1 c 9 ... � Phone: `�'f�,v� Describe the scope of work in detail: Cost of Project: $ Proposed User **************The foilowine MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2NU FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: ^ Th OW FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DEC OV. PATIO SQ. FTG: i 3 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances 6) Plans - l.•lional information may be required to be sugmitted,Iand subsequently approved before this application can -111111tillttal 11111/4 kirk SIGNATURE Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check Mastercard Expires: DATE: 4, ❑ VISA VIN#: 2S1---->st t Ib' /310c E- PE -5144E zr' f- r 1 4 ,I esvn�f A-vc ankleg 'mamumeo eater. a.m. am edge of ember toamler of bag ter be 1.1/2" mtelmum 3" HO.•lea ma 4'.r preside •mdn..r 4n4 bans el pub lame ma.vaes (Mudmam Peal Haight thallnelbe mum nm 10 n.q 4" maximum clear Pal • 4)C 3/1- 'tea ea+ Act hitt 2X10 e Yo O� I Mal bump r min. .Nm anmrl, plevidnraid wed 6" min 2411x..mum •r N.Imd cited.—_/ 7' Ido to daylight . •—•�"+d-12' InImum l0a0pt1 Ibodng 3" minlmum leder sll.ehmenl mutt be bolted Ihmuglr ,0141..a./ -t—YC U Na4'A" pad mala a( 4s4 bones .l poli- abbot. .4Iv2.m. enaaaane (Madman tett Ildbht then mk mote ha 10 O.I) .Id bump I" min. .bae voner.le yr pp Ida bead weed Peat Sc Dean/ Connection detail (iuterivr vuuditivu) real Cyr handled pr mmnnvlm.r s Mmratilmr 6 minimum 1000 pd manual, (minima 3" midmum Natural Gude 24" Hdollnaunt Tnv lit diameter It` bele lop end bottom yplal Item» l+ (aq I Knee breve I Ato Yam lBblrlr • yy ! Ib" nils ((s4) ;tl!le =nee Pal 24' mea O e hong Post & Deana Co eenlivu detail m1 op 'walled i.r men.nmmu'. Inamellen rkor Taw U3" diameter lag bola lap and baaem noted FULL 90 IN. MIN GUARD HEIGHT 11310. ATT LANDING 44N. SPHERE CANNOT PASS TTTROUSH I HEIGHT PER !MGT.FIEM. 10S IMMMNLPORIN DINNDRAILpES SEGE nai 1 64N. SPHERE CANNOT PASSTHROUGH ?4le lµv MNb Y[TIOPY 1( BO [A� T� NIO[9 IM1 V onanrfarikILAIJOWOMI MSMOIAMMI R rr L�B�au�vxwt nr•DANE.. OPEN RISER PERMITTED -4 IN. SPHERE WILL NOT PASS THROUGH OR WHERE HEIGHTOP SUM 181E88 THAN 30 INCHES VARIATION OP RIFER HEIGHTS OR TREAD DEPTHS SHALL NOT EXCEED B/BIN. DECKS: Ledger board requires 1/2" lagbdtt @ 16" o.c. with flashing behind. Guardrail 36 in. high rlred if floor more than 30 in. above grade. Picket spacing no n>than 4 in. apart. Posts require approved base and beam connectors. Min. 24 in. frost protection to finish grade with min. 12 noting base. *Q& Z. C t o Lee' 6a'ti- fg �g t4Ak* SP � sl 2x, c8 'aver& i) nittikW it M t r.)lr PZrr 24 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS /L Siklone REVIEWED FOR CODE COMPLIANCE SPOKANE VALLEY BUI.D G DSION 71 Ci