2007, 04-09 Permit App: 07001181 DeckProject Number: 07001181 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Date: 04/09/2007 Page 1 of 2
Permit Use: 16X14 DECK Contact: DUPONT CONSTRUCTION
Address: 622 E DECATUR
C - S - Z: SPOKANE, WA 99206
Setbacks: Front Left: Right: Rear: Phone: (509) 489-5720
Group Name:
Site Information: Project Name:
Plat Key: 000147 Name: BARMETTLERS 01ST ADD District: Nort
Parcel Number: 45151.0313
Block: Lot:
SiteAddress: 13105 E DESMET AVE
Location:: CSV
Zoning: UR -3.5 Urban Residential 3.5
Water District:
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 60
Owner: Name: SCOTT WALKER
Address: 13105 E DESMET AVE
SPOKANE VALLEY, WA 99216
Hold: D
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 04/09/2007 By: TMELBOU
Landuse/Zoning/HE Conditions
Released By:
Permits: -
Operator: JD Printed By: JD Print Date: 04/09/2007
Project Number: 07001181 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 04/09/2007 Page 2 of 2
Building Permit
Contractor: DUPONT CONSTRUCTION INC Firm: CHRIS DUPONT/DUPONT CONST
Address: 622 E DECATUR Phone: • (509) 489-5720
SPOKANE, WA 99207
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
DECK OPEN R-3 VB 313 $4,695.00 313 $4,695.00
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Totals: 313 $4,695.00 313 $4,695.00
Units Unit Desc
I SELECT
1 SELECT
I SELECT
Fee Amount
$111.25
$27.81
$4.50
Permit Total Fees: $143.56
Notes:
Payment Summary: P
Permit Type
Building Permit
Fee Amount Invoice Amount
$143.56 $143.56
Amount Paid
$0.00
Amount Owing
$143.56
$143.56 $143.56 $0.00 $143.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 04/09/2007
Permit Center
San 11703_F-Sprague(Ave;Surte'B-3
pokaDrne Spokane Valley, WA 99206
Valley (509)6881036 FAX:
www.spokanevaIg&
Community Development
Residential Construct on u1 % (�
Permit Application
U
PERMIT NUMBER: j I {
PERMIT FEE: J(f3 sc.
New Construction n Accessory Bldg
❑ Addition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS:
I 10 s e _JestA,zr
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Buildirig'.Owner. - •,�
' C6ntractor
Name:Sc—rr-T 'n pt_
`Lrycm
Name: \-\-- • >\
Address: ) �JV�F___-- - (-
City: �� S at - �_
p
1 c . 7
Address:
,
L� &"1/4
City:
State: Zip l _,��%ft
Phone:`P 3
'�'Phone:
c - y' ,ma(
ff /
.
� 7 Fax:
� crc:
Contractor, tc N
°
/r yle-) ,�cp p�le� I
1 �-Cl J � � l�\ J l�
1 /
\`
A e..., a � �\y „tea ..
Contact Person � C1!^:=. u.\`
City Business Lic. No:.
Name: 1
c 9 ... �
Phone: `�'f�,v�
Describe the scope of work in detail:
Cost of Project: $
Proposed User
**************The foilowine MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2NU FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
^
Th
OW
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DEC OV. PATIO SQ. FTG:
i 3
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances 6) Plans - l.•lional information may be required to be sugmitted,Iand subsequently approved before
this application can
-111111tillttal 11111/4
kirk
SIGNATURE
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
Mastercard
Expires:
DATE: 4,
❑ VISA
VIN#:
2S1---->st
t
Ib'
/310c E- PE -5144E
zr'
f- r
1
4
,I esvn�f A-vc
ankleg
'mamumeo eater.
a.m. am edge of
ember toamler of
bag ter be 1.1/2"
mtelmum
3"
HO.•lea ma 4'.r
preside •mdn..r
4n4 bans el pub
lame ma.vaes
(Mudmam Peal
Haight thallnelbe
mum nm 10 n.q
4" maximum clear
Pal
• 4)C
3/1-
'tea
ea+ Act
hitt
2X10 e
Yo O�
I
Mal bump
r min. .Nm anmrl,
plevidnraid wed
6" min
2411x..mum
•r
N.Imd cited.—_/
7' Ido to daylight . •—•�"+d-12'
InImum l0a0pt1
Ibodng
3" minlmum
leder sll.ehmenl mutt be bolted Ihmuglr
,0141..a./
-t—YC
U Na4'A"
pad mala a(
4s4 bones .l poli-
abbot.
.4Iv2.m. enaaaane
(Madman tett
Ildbht then mk
mote ha 10 O.I)
.Id bump
I" min. .bae voner.le yr
pp Ida bead weed
Peat Sc Dean/ Connection detail (iuterivr vuuditivu)
real Cyr handled pr mmnnvlm.r s Mmratilmr
6 minimum
1000 pd manual, (minima
3" midmum
Natural Gude
24" Hdollnaunt
Tnv lit diameter It`
bele lop end bottom yplal
Item»
l+ (aq
I Knee breve I
Ato Yam
lBblrlr
• yy ! Ib" nils ((s4)
;tl!le
=nee
Pal
24' mea
O e hong
Post & Deana Co eenlivu detail
m1 op 'walled i.r men.nmmu'. Inamellen
rkor
Taw U3" diameter lag
bola lap and baaem noted
FULL 90 IN. MIN GUARD
HEIGHT 11310. ATT LANDING
44N. SPHERE CANNOT
PASS TTTROUSH
I
HEIGHT PER !MGT.FIEM.
10S IMMMNLPORIN DINNDRAILpES SEGE nai 1
64N. SPHERE CANNOT
PASSTHROUGH
?4le
lµv
MNb Y[TIOPY 1(
BO [A� T� NIO[9
IM1 V
onanrfarikILAIJOWOMI
MSMOIAMMI R
rr L�B�au�vxwt
nr•DANE..
OPEN RISER PERMITTED -4 IN.
SPHERE WILL NOT PASS
THROUGH OR WHERE HEIGHTOP
SUM 181E88 THAN 30 INCHES
VARIATION OP RIFER HEIGHTS
OR TREAD DEPTHS SHALL
NOT EXCEED B/BIN.
DECKS: Ledger board requires 1/2" lagbdtt @ 16" o.c. with
flashing behind. Guardrail 36 in. high rlred if floor more than
30 in. above grade. Picket spacing no n>than 4 in. apart. Posts
require approved base and beam connectors. Min. 24 in. frost
protection to finish grade with min. 12 noting base.
*Q& Z. C t o Lee' 6a'ti-
fg
�g
t4Ak* SP
� sl
2x, c8
'aver&
i) nittikW
it
M t r.)lr PZrr
24
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
/L
Siklone
REVIEWED FOR CODE COMPLIANCE
SPOKANE VALLEY BUI.D G DSION
71
Ci